The romance of modern engineering, containing interesting descriptions in non-technical language of the Nile dam, the Panama canal, the Tower bridge, the Brooklyn bridge, the Trans-Siberian railway, the Niagara Falls power co., Bermuda floating dock, etc., etc.;
whole undertaking. Each chain is composed of two parts, or links ; the shorter dipping from the top of the abutment tower to the roadway, the longer rising from the roadway to the summit of the main tower. The links have each a lower and upper boom, connected by diagonal bracings so as to form a rigid girder. They were built in the positions they had finally to occupy, supported on trestles, and were not freed until they had been joined by huge steel pins to the ties crossing the central span and to those on the abutment towers. In order that the reader may have a clear conception of the action of the ties and chains, we will personally conduct him from end to end of the series. At the north end of the bridge is a huge mass of concrete surrounding an anchorage girder 40 feet long, 4 feet wide, and 4 feet deep, to which is attached a land tie springing up to the shore edge of the abutment top. At the anchorage end the tie is joined by a pin, 2 feet in diameter, to the girder, and at its upper end to the horizontal links crossing the abutment tower. The tie is built up of twelve plates 21 inches wide and nearly an inch thick. The link plates are 5 to 5½ feet wide and inch thick and 22 feet long. At each end they rest on roller bearings moving over 3-inch steel plates very carefully levelled. Then comes the short link of the chain, attached by eye-plates and a steel pin, 2½ feet in diameter, to the tie and also to the lower end of the long link, at which point both are joined to the girders of the roadway. Passing up the long link we reach the top of the towers
and note the great pins and roller bearings at each end of the 301-foot ties. Then down the south long link to the roadway, up the short link, and over more roller bearings to the last section of the series—twelve plates 35 inches wide secured by rivets to the south anchorage girder, which is of larger dimensions than its northern fellow. This arrangement of chains, links, and ties permits a slight amount of horizontal motion to compensate the stresses of unequal loading on the two suspension spans, and the alterations in the length of the metal connections in varying temperatures. Roller joints are also made in the flooring of the side spans at each end and at the junction of the links to allow for longitudinal expansion and contraction.
The boring of the pin holes was a matter of great delicacy and considerable difficulty. The holes in the eye-plates of ties and chains had been cleared to within half-an-inch of their final diameter before leaving the contractor's works at Glasgow, and the finishing touches were added when the plates were in position. The labour of expanding out the holes to their full diameter was equivalent to boring a hole 2 feet 6 inches in diameter through 65 feet of solid steel; and most of this boring had to be done in somewhat awkward positions at the top of the main towers and abutments, whither it was necessary to transport engines, boilers, and boring tools. The fixing of these generally occupied as long a time as the actual boring, since the greatest accuracy had to be observed throughout the process.
Romance of Modern Engineering
The roadway of the suspension spans is carried on cross girders, 61 feet long, weighing 22 tons. At each end they are connected by 6-inch pins to the suspension rods hanging vertically from the chain links. The rods are from 5½ to 6 inches in diameter, and furnished with a screw-coupling at their centres to enable the accurate adjustment of the girders to the true level of the roadway. Before leaving the works each rod had been subjected to a tension of 200 tons, so that of their sufficiency there can be no doubt. Longitudinal girders of smaller section were then laid on the transverse girders, and on these again corrugated floor plates, afterwards filled up with concrete to form a slightly convex surface, over which wood paving blocks were placed.
We may now turn our attention to the central span of the roadway, which forms, perhaps, the most interesting part of the whole structure.
Each bascule, or leaf, of the drawbridge consists of four parallel girders, 13½ feet apart, and about 160 feet long. When lowered it projects horizontally 100 feet towards the opposite tower, spanning exactly half of the opening. The point of balance is a solid pivot, 1 foot 9 inches in diameter and 48 feet long, that passes through the girders 50 feet from their shore ends. The pivot is keyed to the girders, and rotates on roller bearings carried by eight girders crossing the piers horizontally from north to south, themselves borne on girders under their ends.
The chief difficulty attending the erection of the
The Tower Bridge
bascules resulted from the condition compelling the contractors to leave a clear way of 160 feet between the towers. Under other circumstances the girders might have been completed before being brought into line and connected together. As it was, the engineers first built the portions on the shore side of the pivot, added a short section of the river side steelwork, and launched the incomplete girders from the main stage close to the piers into the bascule chambers. A temporary steel mandrel was inserted to carry their weight while they were turned into a vertical position, and then withdrawn to make room for the permanent pivot, weighing 25 tons. The outer ends were added to until a point 53 feet from the pivot had been reached, and work in this direction then stopped until the raising and lowering of the leaves for purposes of adjustment had been concluded ; after which the girders were completed vertically.
The leaves are moved by means of pinions (or cog-wheels) engaging with racks fixed to the edge of two steel quadrants riveted to their two outside girders. The accurate attachment of the racks was a somewhat difficult business on account of the confined space in which the men had to work.
To preserve the balance of the bascule it was necessary to load the shorter, or inner, arm with counterpoises, consisting of 290 tons of lead and 60 tons of iron enclosed in ballast boxes at the extreme ends of the girders. The function of the raising gear is merely to overcome the inertia of the 1200 tons of
the leaf, and the friction caused by wind pressure on the exposed surface. In designing the hydraulic machinery allowance was made for a wind pressure of 56 lbs. to the square foot, which would produce a force of 140 tons acting with a leverage of 56 feet.
The source of power is a building on the east side of the southern approach, where are stationed two large accumulators with 20-inch rams loaded to give a pressure of from 700 to 800 lbs. per square inch. An accumulator is the hydraulic counterpart of the reservoir bellows in an organ. It ensures a steady pressure, as its capacity is greater than that of the engines it operates ; and since the pumping engines can be constantly at work filling it, there is always a plentiful supply of energy stored against the periodical opening and shutting of the bascules. The water is led through two 6-inch pipes, provided with flexible joints at points of movement, to the two sets of engines on the south pier ; and to those on the north pier through continuation pipes passing up the south tower, across the footway, and down the north tower. After use, the water is returned through a 7-inch pipe to the pumping engines placed in two of the arches forming the southern approach to the bridge.
The engines are duplicated on each pier to avoid the inconvenience that would result from the breakdown of a single installation. The power of the engines is transmitted to the racks through a series of cog-wheels, which increase the effective pressure
of the pistons almost sevenfold. Hydraulic energy is also used to work the two hydraulic lifts in each main tower, and to shoot home and withdraw the four locking bolts at the outer extremity of the southern leaf.
In this connection the following extract from Mr. J. E. Tuit’s fine book on the bridge will be of interest. “ Every precaution has been taken so that the operation of opening and shutting the bridge shall be rendered as safe as possible. By an automatic arrangement attached to the hydraulic engines on the piers they are caused to close the valves which admit the high-pressure water just at the end of the operation of raising or lowering the leaves, so that even if the man in charge were to make a mistake through an error of judgment, or be prevented from attending to his duties, the leaves would gradually bring themselves to rest either in a vertical or horizontal position without the least chance of any catastrophe. As a still further precaution, however, hydraulic buffers are fixed in such positions that if the men in charge lost control of the bridge, and at the same time the apparatus above alluded to for bringing up the motion of the leaves were to fail, their impact would be taken by these buffers, which would bring them to rest in the same manner as that in which the hydraulic cylinders that are attached to heavy guns take up the recoil.”
In cabins at the east and west ends of each pier are indicators to tell the men in charge whether the
accumulators are full before starting the engines, and whether the locking bolts are in their proper position. Further provision is made to prevent the raising of the bascules before they are cleared of traffic. The policemen in charge have to stretch a chain across the entrance to each pier. As soon as the chain is fixed, the man carrying it will be able to turn on the water to a small cylinder that draws it tight and at the same time releases the locking arrangement of the levers in the cabin. So that until the chain has opposed a barrier to the traffic, it is impossible to draw the locking bolts at the centre of the span.
The masonry of the towers is independent of the steelwork that it encloses. In fact, great care has been taken that there shall be no adhesion between the two substances. This part of the structure, carried out by Messrs. Perry & Co., calls for no special attention here, though it impresses itself favourably on the eye of the spectator. Objections have been raised to the external masonry on the ground that it is a “hollow sham,” but we fancy that were the covering suddenly stripped away, so as to expose the steel skeleton beneath, many objectors would be silenced. The general opinion is that with so many metal structures exposing the nakedness of their outlines the London Corporation is to be congratulated on having thus boldly made a concession to the aesthetic tastes of the community which does not detract from the value of the bridge as a utilitarian erection. The cost of construction was
enhanced, but the result is one of which Londoners will be proud in years to come.
The Tower Bridge, typical of modern engineering skill, has an interesting connection with the old London Bridge—itself a mechanical triumph considering the science of the time—built towards the end of the twelfth century. That bridge, which stood the wear and tear of nearly 700 years, was endowed with certain lands which, with the growth of London, became extremely valuable, and are now known as the Bridge House Estates. The revenue from them has enabled the Corporation of London to rebuild the London Bridge, throw another across the Thames at Blackfriars, and also to construct the subject of this chapter.