In 1888 M. de Lesseps reluctantly abandoned his original scheme of a sea-level canal in favour of one with locks, which would reduce largely the amount of excavation in the Culebra cutting. But public confidence had been shaken, and after his compulsory resignation of the chairmanship in 1889, the shareholders resolved that the Company should go into liquidation. The liquidators at once took measures to bring some sort of order into the financial chaos, and to organise a new Company. The Colombian Government enacted that the latter should have ten years, dating from 1894, in which to complete its enterprise.

The plans were now drastically altered. By means of an embankment across the valley of the Chagres near Bohio the country between that place and Obispo would be converted into a huge lake, to serve as part of the canal and a reservoir for the storage of flood water. In case of need a second

dam would be added at Alhajuela, 9 miles above Obispo. A waste weir was to carry off the surplus water of the new lake into a special channel ; and the lake itself would be reached from the lower levels by four locks on the Pacific side at Paraiso, Pedro Miguel, and Miraflores, and by an equal number on the Atlantic side at Bohio and Obispo. This scheme would entail the diversion of the railway for a distance of 31 miles to skirt the lake ; and a total expenditure of over £20,000,000.

Work on the Canal was never stopped. At its slackest times more than 1000 men found employment. From 1899–1902 the working force averaged 2200 men, so that the picture of plant and excavations left entirely to the tender mercies of Nature must be written down as an unpleasant fiction.

While the new Company was quietly pursuing its programme the United States had instituted surveys of the Nicaragua-Costa-Rica Canal region, in order to humour the patriotic cry for a States-owned and controlled, inter-oceanic canal. In 1899, however, all bills for the construction of a Nicaraguan Canal were rejected in favour of a measure providing for further investigation of the whole question—including the survey of the isthmus—de novo. The President, Mr. M'Kinley, acting on powers conferred, appointed a Commission of nine members, which in 1901 recommended the construction of a canal through Lake Nicaragua, with a total length of 18334\frac{3}{4} miles, the cost to be about £40,000,000.

Romance of Modern Engineering

This alarmed the Panama stockholders, and in 1902 they decided to offer their property and concessions to the United States in consideration of a sum of $40,000,000. Public opinion being then completely reversed by this offer, the President was authorised to acquire for the United States, at a cost not exceeding the sum demanded, all the rights and privileges, unfinished work, plant, and other property, of the New Panama Company on the isthmus, including the railway; to acquire from the Republic of Colombia exclusive and perpetual control of a strip of land not less than six miles wide from the Caribbean Sea to the Pacific Ocean ; and to construct a canal of such depth and capacity as would afford convenient passage to ships of the greatest tonnage and draught then in use.

Thus ended the second chapter in the history of the Canal, and France, through the grievous mismanagement in the period 1880-88, " lost an opportunity of acquiring influence in Central America, and upon the American continent generally, which in all probability will never again fall within her grasp."

Colombia had still to be reckoned with. As long as the Nicaraguan scheme was seriously entertained by the United States the Bogota Government showed itself most anxious to concede almost anything that might be asked. But when the offer of the Canal had been made by the Company these professions ceased, and harder terms were demanded. Colombia continued to haggle for conditions that the States

could not grant. Her pecuniary demands were satisfied by a compromise, and her nominal sovereignty preserved by a diplomatic fiction. But before the United States Government could commit itself to so prodigious an undertaking as the completion of the Canal, it naturally enough required a guarantee that its occupation of the Canal territory should be permanent. The offer of the Canal Company having being formally accepted in February 1903, a treaty was signed by the States in the following month, as the result of energetic measures on the part of President Roosevelt, and all that remains to be done at the time of writing these lines is its ratification by the Colombian Government before work on the Canal can be definitely undertaken by the Americans.

The Commission appointed in 1899 rejected the sea-level scheme of M. de Lesseps as entailing a computed expenditure of £48,000,000 for the completion of the Canal. In its place they suggested a modification of the plans laid before the new Company in 1894, which would require an outlay of about £30,000,000.

THE PROJECT FOR COMPLETION

In deciding the dimensions of the Canal the United States Commission considered the future rather than the present types of the world’s shipping. Though cargo vessels do not in the main increase their length and beam so rapidly as passenger fast liners, their individual tonnage very sensibly augments from year

to year, since experience proves that large cargoes are handled more economically than small.

The depth of the Canal was therefore fixed at 35 feet throughout, and the minimum bottom width at 150 feet. In Panama Bay the width will be increased to 200 feet, though at high tide there will be a channel 320 feet wide. The side slopes will vary between 1 to 1 in soft earth and 4 to 1 in hard rock. On curves, where more steering room is required, the channel will be broadened in proportion to the diminution of the radius of the curve.

The locks, of which five flights are included in the plans, will raise vessels from the two end sea-level sections to the central stretch, 2123\frac{2}{3} miles long, extending from Bohio to Pedro San Miguel. This section, which includes the Culebra-Emperador cutting, will have a bottom level 47 feet above mean sea level, so that the two locks at Bohio will give a united lift of some 82 to 90 feet, according to the altitude of the surface of the central reach. On the Pacific side the transference will be made by two locks at Pedro San Miguel and one at Miraflores.

The locks are to be doubled at every step, so as to permit simultaneous travel in both directions, and obviate any total cessation of traffic, in case of repairs to any one lock being necessary. They will have a clear length of 740 feet, a width of 84 feet, and a depth equal to that of the canal over the sills. For the quicker passage of small vessels a subdivision by intermediate gates is contemplated. All locks will be

The Panama Canal

founded on rock, walled with concrete, and fed by culverts through which water will rush at a maximum speed of 40 miles an hour—a severe test of the quality of the lining.

It has been mentioned above that the two greatest difficulties encountered on the Canal by the De Lesseps Company were the stemming of the river Chagres and the piercing of the rocky eminence at Culebra. The American scheme for overcoming these obstacles is distinguished by its boldness of design, and the opportunity that it will afford for a remarkable display of engineering skill.

At Bohio the course of the Chagres will be crossed by a dam thrown from side to side of the valley. The effect of this dam must be to pen up the waters until a lake is formed, rapidly increasing its area as it becomes deeper. It has been calculated that, with an annual traffic of 10,000,000 tons, there will be required for the working of the locks an average supply of 1063 cubic feet per second. The annual average flow of the Chagres is about 3200 cubic feet per second, but at the dry season it decreases to less than one-sixth of this amount. The United States Commission therefore decided that the lake should be of such dimensions as to afford storage for 3,654,720,000 cubic feet, the total deficiency during the three months of February, March, and April, in addition to the amount requisite to maintain a channel of a minimum depth of 35 feet. The height of the dam will therefore be such as to withstand a head of 90 feet of water, its

top having an elevation of 100 feet above mean sea level.

As the water collected by the lake would naturally flow off at the lowest point after attaining a certain depth, it has been determined to bar that point—near the head of the Rio Gigante—by a weir, the height of which will be 85 feet above mean sea level. When the water of the lake is even with the crest of the weir it will cover 38½ square miles ; but in time of heavy flood, with a discharge 5 feet deep over the weir crest, the area will be enlarged to 43 square miles.

The water pouring over the weir, which is to be 2000 feet long, will pass into artificial channels, connecting a succession of swamps until the neighbourhood of Gatun is reached, where it will once again enter the bed of the Chagres.

The most important feature of this scheme is the great Bohio Dam. At the summit 2546 feet long, it will have a total height above the foundations of 228 feet on its centre line, where the earth-work forming the bulk of the construction is to be reinforced by a masonry core driven down to hard rock. “ The earth faces are designed to have mean slopes of one vertical to three horizontal, broken by benches, each 6 feet wide. Although it is necessary to pave only the up-stream face, it is probable that both faces will be revetted with rock spoil from the site of the Bohio locks. The masonry core would be 30 feet thick at and below -30 (i.e. 30 feet below sea level), tapering from that

level to 8 feet at the top. The proposed method of construction involves many novel and untried features, the extension of pneumatic work to probably unprecedented depths, and special details in making tight joints between the caissons. The difficulties, very great under ordinary circumstances, will probably be considerably enhanced by climatic and other surroundings."¹

It is calculated that the construction of this enormous barrier will entail the removal and placing in position of 2,200,000 million cubic yards of material, of which nearly 300,000 cubic yards will be represented by concrete. The cost, £1,210,235, will equal that of the Nile Dam, and the cubical contents of both are about the same.

The creation of the lake will of course enormously decrease the amount of excavation originally estimated by M. de Lesseps. Yet a huge quantity of quarrying will be necessary at the famous Emperador-Culebra cutting, where the bottom of the Canal will still be 286 feet below the natural surface of the ground. To quote Mr. Leigh once more, "From many points of view the Emperador-Culebra cuttings may be regarded as unique in the annals of engineering, for never has the hand of man essayed a task of like character and more striking dimensions. . . . It involves labour necessarily costly and prolonged, and its main interest to engineers centres in the remarkable opportunity which the undertaking will afford for organisation,


¹ Mr. J. G. Leigh in "Traction and Transmission."

methods, and tools specially adapted to the work. . . . The amount of excavation involved in the completion of the cutting is estimated at about 43,237,200 cubic yards, or nearly 45 per cent. of the aggregate of all classes of material which must be removed prior to the opening of the waterway. It is believed that by methods of excavation usually resorted to, the cutting can be completed in eight years, exclusive of a period of two years for preparation and unforeseen delays."