The year 1881 was marked by three notable incidents. First came the great snowstorm, still notorious, that worked havoc throughout the British Isles. It cut off communication between the tunnel and the outside world, reducing the contractors to all sorts of shifts to supply their pumping-engines with steam, in the absence of a regular supply of coal from South Wales.

Romance of Modern Engineering

In May a strike broke out among the workmen, which for a few days brought the works to a complete standstill, but ended in the men returning to work as before.

A month previously the sea had found an entrance into the Gloucester sub-river heading from a shallow reach called the "Salmon Pool." Fortunately for the fate of the tunnel the long heading from the Sudbrook or Portskewett side had not quite joined that from the Gloucester bank, otherwise the water would have poured across to the bottom of Old Pit, scouring the whole of the long heading with disastrous effect. At low water Mr. Walker made a number of men join hands and wade into the Salmon Pool, until the sudden disappearance of one of them for a moment betrayed the whereabouts of the inlet. A schooner-load of clay dumped overboard at the spot checked further leakage.

The remaining months of 1881 and 1882 passed without any serious accidents to delay the work, which proceeded apace. The method employed in making the tunnel was to securely timber the headings—driven at what was to be the bottom level of the completed work—and from them to "break up" at intervals to the level of the crown of the arch. Each break-up, timbered in turn, became the end of a top heading, 6 feet high by 5 or 6 feet wide, running a few feet above the lower heading for a distance decided by the nature of the ground, technically known as a "length." The top heading finished, a

groove is cut along the top of each side wall to receive a balk 12 or more inches in diameter of the same length as the "length" itself. Vertical grooves are then cut in the sides, and into these are inserted props to support the longitudinal balks. The excavators then dig into the sides farther, and cut two more horizontal grooves rather farther from the axis of the tunnel, but lower than the first two "crown-bars." Into these a second pair of crown-bars is rolled and similarly secured by uprights ; and the operation is continued until the top heading has been widened into the outline of the tunnel arch. The floor has now to be cut away, and a support provided for all the props at the ends of the crown-bars. A deep groove is therefore sunk across the heading to a point a little lower than the inferior ends of the props, and a massive beam, 12 to 15 inches square, let into it. A second set of props is then wedged between the "sills," as the cross-beams are called, and the crown bars.

The lower heading is then widened and sills fixed top and bottom, separated by tightly-jammed props ; and then, the matter between the two headings being removed, a middle tier of props set between the bottom sill of the top heading and the top sill of the lower heading.

If, then, the reader imagines himself to be in a length timbered ready for masonry, he will see overhead a number of horizontal and parallel balks reaching from the highest point of the arch down each

side of the tunnel to within a few feet of the bottom. Each end of the length is shut in by two tiers of short upright beams bearing sills, and above these again rises a third fan-shaped tier of supports taking directly the weight of the crown-bars.

The invert, or concave tunnel bottom, is then bricked, and after it the two sides to the spring of the arch. It now is time to set the “centres”—semicircular wooden frames—across the arch parallel to one another at a distance of 3 or 4 feet, and line them on their inner and outer sides with stout boards. They act as a support over which the masons can lay their bricks. Sometimes the arch is built inside the crown-bars, sometimes outside them, and sometimes between them, the bars being withdrawn horizontally in turn to make room for the bricks.

As soon as a length is completed, the excavators drive top headings from each end, removing the débris and bringing in timber and lining materials through the bottom heading, which acts as a common feeder to a succession of break-ups, each of which has two “working-faces.” This system enables the work to be pushed forward rapidly, as in the confined space of a tunnel only a limited number of men can be advantageously employed on one face ; and a great economy of time results when heading-driving, chambering, timbering, and lining are in simultaneous progress at different points. The care exercised by foremen and miners is evident from the fact that out of the 1500 “lengths” taken out,

in only one was the timbering unequal to the strain placed upon it by the superincumbent mass.

The strata encountered were of many kinds. Starting from the Welsh bank—alluvium, sand, white sandstone, marl, conglomerate, millstone grit, coal shale, blue shale, clay shale, red sandstone, grey sandstone, marl, and gravel. In some places pick-and-shovel work was able to cope with the strata, but in many rock-drills and blasting became necessary. When a large number of break-ups were in operation the amount of material to be transported to and from the working-faces became so great that in the Gloucester half of the long heading Mr. Walker laid down a double line of rails between which worked a continuous steel rope, actuated by an engine at the top of Sea-Wall shaft. The rope, or “bond,” was carried by horizontal rollers placed on the sleepers of the road a few feet apart. When the engine was started the rope travelled at a uniform speed of 2 miles an hour round a large pulley situated rather more than a mile from the foot of the shaft. Men called “hookers-on” attached full skips to the rope flanking the “up” line, or detached empty ones from the “down” line rope. At the shaft bottom the skips were placed in cages, and after being hoisted, discharged, and lowered again, returned for another load. The system works so smoothly that at times as many as 200 skips were in motion at once; and the cost was reduced to a fraction of that of the pony haulage employed at the Welsh end.

Romance of Modern Engineering

The reader must bear in mind that in the early 'eighties the engineer was not nearly so well equipped as he is to-day. Electric lighting, for instance, was still in its infancy, and not only were candles largely used in the workings of the Severn Tunnel, but those electric lamps installed give a considerable amount of trouble and only a very inadequate amount of light according to present ideas. Rock-boring machinery also was not nearly so perfect as it is to-day, and explosives not so effective. And not until 1882 was the telephone established in the works. Mr. Walker considers that on the very first day of its instalment it averted a strike, since a ganger in the cabin at one end of the wires overheard a man saying mutinous things in the other cabin, and by dismissing him prevented further mischief. The mining engineer is now able to apply electricity in many other ways that were unknown at that time. And last, but not least, the "pneumatic shield" for penetrating water-logged strata has since then become a much more efficient machine.

On the 2nd of December a curious panic seized the workmen in the long heading under the river. Mr. Walker found about 300 to 400 men at the top of the main Sudbrook shaft, all breathless and excited, some partly naked. On inquiring what was the matter, he was told that the river had broken in, but nobody appeared to be able to give any definite statement as to where it had burst through. There was no more water than usual in the pumping-pit, and its

The Severn Tunnel

colour was unchanged. Accordingly Mr. Walker and two foremen descended the shaft and found the heading perfectly dry, except for the ordinary drainage from small leaks. In several places hats, kerchiefs, waistcoats, and leggings strewed the floor of the workings—marks of a hurried flight. It afterwards turned out that some water, imprisoned by an obstruction in a heading on the Gloucester side, had, on the removal of the obstacle, flowed down the long heading and topped the edge of a shoot that carried any leakage. The men at the Welsh end, not knowing the cause of this sudden increase in the flow, acted on a miner’s advice to “fly for their lives,” rushing to the Sudbrook winding-shaft. “When passing through lengths of finished tunnel,” says Mr. Walker,1 “they spread out in a disorderly crowd, running perhaps 20 feet wide; then they would come to a short length between two break-ups, where there was only a 7-foot heading. Here they threw each other down, trampled upon each other, shouting and screaming; and then, to add to the disorder, the ponies in the various break-ups took the alarm and galloped down in the direction of the winding-shaft, trampling on the prostrate bodies of the men. . . . When the men reached the top of the pit, the night-shift—which would go below at two o’clock—had already received their pay, and were gathering ready to descend. It may be imagined that these men cruelly chaffed the others who had come up, as soon as it was known

1 In his book on the tunnel.

that there was no danger below ; and I have reason to think they reaped quite a harvest of neckties and other things thrown away by the others, when they went down to their work."

Thus ended an incident which, comical enough in itself, must have given the men concerned—no one more than the contractor—a very bad quarter of an hour.

Real troubles were about to occur again. At the close of May 1883 an attempt was made to open the door in the wall keeping out the Great Spring. But the débris behind rendered all efforts vain, and eventually a hole a foot in diameter had to be bored through the door with augurs ; and through this hole the men tried to clear away the impediment. This method proving impracticable, a heading was driven below the blocked heading, and a break-up made to allow the water to pass that way, and permit an examination of the upper heading. The men found that the roof had fallen in for a length of 50 to 60 feet, and that there was an enormous cavity overhead. An inclined heading was therefore driven from the top heading into the cavity, and quantities of timber and other materials thrown into it to protect the bottom heading. Three new doors were then built, one in each of the three headings, as a precaution against further irruptions of water.

But the Great Spring had only been scotched. On October 10, 1883, the unwelcome news reached Mr. Walker that it was pouring into the lower heading in

The Severn Tunnel

a larger volume than had yet been met with. He found, on descending the shaft, a river 16 feet wide and 3 feet 6 inches deep roaring down the 40-foot drop to the bottom of the shaft. The heading door could not be closed ; the pumps could not check the inflow ; and in a short time the men in the long heading were making for the Welsh shore. The next day 52 feet of water stood in the works. The services of Lambert were again requisitioned, and this intrepid diver managed to close the door through which the water flowed. By November 3 the tunnel was again freed of water and the Great Spring in check.