The romance of modern engineering, containing interesting descriptions in non-technical language of the Nile dam, the Panama canal, the Tower bridge, the Brooklyn bridge, the Trans-Siberian railway, the Niagara Falls power co., Bermuda floating dock, etc., etc.;
Much of the excavation will be through rock, but the strata of clay encountered will require an equal expenditure in labour, as their unstable nature necessitates the lining of the slopes throughout the entire length of the cutting with masonry retaining-walls, built nearly vertically on a series of broad ledges, rising one above the other on either flank. The Panama railroad, which must be rebuilt for 15½ miles between Bohio and Obispo to avoid the lake, will, after passing the latter town, run for six miles or so along one of the ledges on the east side of the cutting.
Out of the $144,233,258 to be devoted to the completion of the Canal, the 6 miles of deepest cutting will consume $42,000,000, more than the aggregate cost of the Bohio dam, all the locks, the Gigante weir, and the other work to be done between Bohio and Miraflores. Had Nature but omitted the Cerro de Culebra from her scheme, it is probable that for years past vessels would have crossed from ocean to ocean.
The Panama Canal
At Colon a large harbour will be built to improve the entrance to the Canal and protect it from the “northers” of the Gulf of Mexico. At the Panama end 4½ miles of dredging will be requisite to carry the Canal to the 6-fathom line in the bay.
The time occupied by vessels in passing through the Canal will vary with their size, the permissible speed decreasing with the increase of a ship’s tonnage. It has been calculated that, allowing 5¼ hours for lockage, the Pacific and Atlantic will be but 11¼ to 14¼ hours apart, according to the dimensions of the steamer.
The projected Nicaraguan Canal — now finally abandoned—would have had a length of 187 miles between Greytown on the Caribbean Sea and Brito on the Pacific. Of this distance the lake would occupy 70 miles, and the canalised San Juan River an equal proportion. It was proposed to dam the San Juan at Conchuda, and so throw some 50 miles of its course into the same level as the lake—104 to 110 feet above mean sea level. Four locks between Conchuda and an equal number between the lake and Brito were to transfer the traffic from the lower to the higher level.
The disadvantages attaching to this route were : (a) the cost, double of that required for the completion of the Panama Canal ; (b) the great difficulty of controlling so large a body of water as Lake Nicaragua ; (c) the large number of locks, combining with
the total length of the Canal to make () the passage of the Canal a matter of at least thirty hours. Under this latter head it may be noticed that though the distance from San Francisco to New York is 377 miles greater via Panama than by Nicaragua, the duration of the journey by water would be about the same in both cases.
There cannot be the least doubt that the United States have acted prudently in surrendering all ideas of a canal constructed throughout by Yankee capital and engineers, and deciding to bend their efforts to the completion of a work partially carried out by the ill-starred French Companies.
What will be the effects of the perfected Canal on the commerce of the globe it is indeed hard to calculate. But that it will prove an immense stimulus to inter-oceanic trade, by breaching the 9000-mile barrier of the American continent at the most convenient point, is not to be doubted. The States, as controllers of the Canal, will gain an immense strategic advantage, since they will be able to throw their fleet from one ocean to the other as required. Furthermore, all their ports will benefit largely, since those on the west will then command a shortened route to Africa, and those on the east be much nearer the East Asian markets than formerly. In fact, for all practical purposes, Panama will be the great gateway between the East and the West.
Yet the Canal will not command a monopoly of the carrying trade across Central America, since a
rival is already in the field, and what is more, actually at work.
In the south of Mexico, east of the Yucatan promontory, the two oceans are within 160 miles of each other. The great Cortes, having vainly sought a natural channel, conceived the idea of constructing a carriage road across this comparatively narrow neck, so as to put Spain in communication with the spice islands of the East Indies. He accordingly bought up land on the Coatzacoalcos River and round Tehuantepec—from which the isthmus takes its name—with an eye to profit by the road ; which was, however, not actually made until five centuries later, when the discovery of gold in California, and the dangers of travel across the northern prairies, rendered such an undertaking an absolute necessity.
At a later date Captain Eads proposed a railway over which ships should be transported bodily from ocean to ocean, borne on trucks running over several parallel tracks, each furnished with one or more locomotives. The vessel was to be transferred to land from the water by means of a pontoon carrying a cradle furnished with wheels running on six lines of rails. As soon as the pontoon had been raised to the height at which its rails and those on shore were on the same level, the cradle and its ship would be moved from the one set to the other, and all would be ready for the land journey. It is needless to follow the details of the scheme further, as it proved abortive.
Romance of Modern Engineering
In 1895 the Mexican Government completed an ordinary-type railroad across the Tehuantepec Isthmus, from Coatzacoalcos on the north to Salina Cruz on the south. But owing to the lack of proper terminal harbours the traffic on either track was disappointing. At that time Sir Weetman Pearson—head of the London firm of S. Pearson & Son—was engaged in the wonderful harbour of Vera Cruz, described at length elsewhere in these pages. He entered into an agreement with the Government for improving matters in the isthmus ; the Mexican authorities undertaking to expend £3,000,000 on the harbours, and an additional £500,000 on the railway ; his firm to carry out the contracts and furnish whatever money might be further necessary to put the line in first-class working order. This partnership will last for fifty years, after which period the whole of the property will pass under the sole control of the Government. The latter on its part binds itself not to grant during this time any concession for the construction of other railways and ports within 30 miles of the Tehuantepec works ; but it reserves the right of employing any ships of the Company in event of war in consideration of a monthly remuneration ; and of transporting coal, troops, and immigrants at reduced rates ; mails to be carried free.
The railroad crosses the isthmus at the narrowest part of Mexico, covering a distance of only 192 miles, so that freight received from one ocean will be able to be shipped in the other ocean within the short space
of twenty-four hours. Owing to necessary windings in places, the road is 50 miles longer than a straight line between the extreme points. In spite of the fact that the country in some parts, particularly on the Pacific side, reaches an altitude of 3000 feet, the highest elevation of the track is but 852 feet above sea-level.
The harbour works are expected to be completed in 1904, when the terminal ports of Coatzacoalcos and Salina Cruz will be converted into first-class sea-ports, accessible in all weathers. At the former place the natural harbour is good, but there is only 15 feet of water on the bar at low tide. Dredging operations are being carried on to give the channel a depth of from 30 to 40 feet. Along the river front quays two-thirds of a mile in length are being constructed. At Salina Cruz very extensive works are necessary, as the port has to be constructed in an open bay, with breakwaters similar to those of Vera Cruz. The Mexican Government intends to make the towns worthy to be called inter-oceanic route stations, and to render them as healthy as possible by a pure water-supply and enforced regulations for the paving and cleansing of the streets.
The Government has granted a concession to Sir Weetman Pearson to construct a line from Ojapa on the Tehuantepec Railway to Alvarado on the river San Juan, which is already in direct communication with Mexico City via Vera Cruz. There will thus be two ports on the Gulf from which goods can be forwarded to Salina Cruz on the Pacific.
Romance of Modern Engineering
The prospects of the Tehuantepec Railway may be deduced from the following considerations. In the first place, the Tehuantepec Isthmus is 1300 miles north of Panama, and therefore much nearer the trade centres of the United States than the Canal will be. The difference in mileage between certain points by the railway and by the Canal may thus be stated :—
| By Tehuantepec. | By Panama. | |
|---|---|---|
| Miles. | Miles. | |
| New York to San Francisco | 4,925 | 6,107 |
| New York to Honolulu | 6,566 | 7,705 |
| New York to Hong-Kong | 11,597 | 12,645 |
| Liverpool to San Francisco | 8,274 | 9,071 |
| New Orleans to Acapulco | 1,453 | 3,983 |
| New Orleans to San Francisco | 5,596 | 3,586 |
Though Coatzacoalcos on the Atlantic is 800 miles south of New Orleans it is nearer than that town to San Francisco.
Secondly, the sea-to-sea charges of the Panama Railway are about 20s. per ton ; of the United States Railways 60s. per ton. It is expected that the transference will be made on the Tehuantepec line for 16s. ; and if to this be added 10s. per ton as the cost of the Pacific Ocean journey from Salina Cruz to San Francisco, the shipper will be able to pass goods from the latter town to the Gulf at a total charge of 26s., or but one half of all-rail transit via Mexico City and Vera Cruz. It is obvious from these figures that the Panama Railway,
The Panama Canal
even if it reduces its charges, will not compete seriously with the northern route, which, at least until the opening of the Canal—an event not likely to occur for twelve years or more—will obtain the bulk of the ocean-to-ocean carrying trade.
NOTE.—The author desires to acknowledge his indebtedness to two articles published in Traction and Transmission, over the signature of Mr. J. G. Leigh, for information about the Project for Completion of the Canal ; and to Mr. J. Meldrum, M. Inst. C.E., of Messrs. S. Pearson & Son, for particulars of the Tehuantepec Railway.
CHAPTER XV
HARBOURS OF REFUGE
The sky is dark and overcast; the wind whistles fiercely; the air is laden with spray. Nature is putting out her strength, lashing the sea into fury against all things that withstand the onset of her foam-crested billows, which rush landwards, heavy with the force gathered in open ocean. The waves hurl themselves again and again on the outer face of the breakwater, and fall back baffled on to their succeeding fellows. Every few seconds the charge is renewed, with as little effect; for the great mass of granite and concrete has been well and truly laid by cunning engineers, well-versed in the methods of curbing the rage of Father Neptune.