Débris is removed from, and material carried into the tunnel by trucks and engines running on a line of 31½-inch gauge. The engines are of two types, steam and hot-air. The steamers have very large boilers, so that when steam is once up they may make the journey to and from the working face without any need for stoking, and the consequent fouling of the atmosphere. Their height to the top of the boiler is but 6 feet 6½ inches ; and the short 14-inch funnel is provided with a hinge for lowering it in confined spaces.

The air locomotives are used chiefly in the headings. Their freedom from fire and steam fits them for haulage in the farthest interior, where coolness is of great importance. The compressed air, driving a single cylinder that actuates the 2-foot road wheels through intermediate gearing, is stored in 27 cylinders, at a pressure of 1030 lbs. to the square inch ; the supply being renewed when necessary from an air-valve situated 13/4 miles from the entrance, and connected by piping with compressors at the power-station.

For the following description of the southern or Italian end of the excavation, the writer is largely indebted to an account that appeared in the columns of The Engineer.

The men work in three shifts of eight hours each.

Romance of Modern Engineering

Their day is reckoned, Jewish fashion, from 6 P.M. till 6 P.M. Seven days a week the operations go on, as soon as the boundary line between the two countries has been passed ; for the Italian workmen, who obey their priests in the matter of Sabbath keeping while in Italy, declare that they “ have no religion ” when once they enter Switzerland. “ This is the only blot on the undertaking, for, in the opinion of tunnel experts, no loss of time, but rather gain, is secured by allowing men, horses, and machinery to rest for the one day in seven. As it is, work goes on incessantly from one year’s end to another, with the exception of four or five days which are particular feasts, or are days on which the special Government engineers appointed for verifying the axis of the tunnel require cessation of work for getting their lines into the tunnels from their telescopes and theodolites.”1

The men are encouraged to exert themselves by a system of premiums. Each gang benefits by any daily advance over the average. The work is so unpleasant and exhausting, that but for some such arrangement there would be flagging, with loss to the contractors.

Trains, running to a regular time-table, convey men and materials in and out of the tunnel about 30 times a day ; punctuality in starting and arrival being strictly observed.

The air at the entrance is described by a visitor as a


1 The Times, August 29, 1901.

more sulphurous edition of that of the London Metropolitan Railway. As the "face" is approached the temperature falls, until we enter the comparative comfort of the fresh-air supply. The tunnel is well lined with Antigorio gneiss, the spoil of the excavations. Every 100 metres a "refuge" is let into the south-west wall, and at every 1000 metres small cellars have been constructed for the storage of supplies and signalling apparatus.

At the "tunnel station" passengers quit the train, and proceed on foot to the scene of excavation, where springs of water are unpleasantly in evidence. The temperature of these inflows shows that they are due to leakage from the surface, and not to the proximity of a subterranean reservoir. On the Italian side of the mountain the first 4350 metres pierced were through gneiss, hard but comparatively free from moisture. Then followed a short section—40 metres long—of micaceous schist, that has proved to the contractors much what the Great Spring was to Mr. Walker in the Severn Tunnel.

The schist, being softer than the rock, is squeezed into any excavation piercing it. So great was the pressure that timbers 16 inches square, packed closely together, broke up like matchwood, and blocked the boring. After six months of hard work the engineers succeeded in replacing the wooden with iron frames formed of girders 1534\frac{3}{4} inches deep, 638\frac{3}{8} inches wide across the flanges, and 58\frac{5}{8} inch thick in the plates. Stout timbers bolted to each side of the frames

greatly increased their strength. In the first portion of the "fault," 32 frames were placed contiguously ; but in the farther part spaces of 16 to 48 inches, filled in with concrete, separated them according to the plasticity of the schist.

The difficulty of erecting these frames was, as may be imagined, very great, at one time apparently insurmountable, if the engineer's vocabulary admits such a word. The delay, in addition to the extra work, entailed a great increase of speed in the boring beyond, where the rock is more amenable, to make up for lost time.

The frames allow an internal passage, 8 feet 2 inches by 9 feet 2 inches. The material all round them had to be cleared away for a generous distance to admit an unusually thick lining of masonry. The removal of the schist has proved a very tedious business, since care must be taken not to leave the frames unsupported for more than a few feet at any one place.

Excavation commenced by cutting a hole through one of the side posts sufficiently large to pass workmen and materials. The men chiselled a short shaft downwards, and then drove a heading under the base of the frame to the centre line, and the half of the invert (or arch with the concave side upwards, of gentler curvature than the tunnel roof) was built in. Meanwhile other hands tunnelled below the farther side of the frame ; and when they too reached the centre line, and put in their half of the masonry,

a section of the tunnel bottom was finished. The work proceeded after this manner in rings a few feet apart.

The sides and upper arch have next to be dealt with. It has been proposed to build these in when the interval between the outside of the frames and the inner side of the tunnel lining has been cleared and filled with temporary masonry, which will serve as a support for the timbering in the space actually occupied by the lining. The completion of this short length will probably require a total of nearly two years' work.

It was found impossible to drive the smaller tunnel forward through the fault, so the engineers abandoned No. 2 heading for a time, and when No. 1 heading was lined, cut a cross passage and burrowed backwards.

At the working face three Brandt hydraulic drills, mounted on a beam wedged across the heading, are eating holes into the rock for the reception of the blasting charges.

A short description of these drills is pertinent, as they have played so important a part in the excavation. On the Mont Cenis and St. Gothard tunnels the holes were bored by percussion air-drills, making 200 strokes a minute. During the driving of the Arlberg Tunnel (1880–1884) a trial was given to Brandt's invention, which revolves a hollow cutter, 234\frac{3}{4} to 312\frac{1}{2} inches in diameter, held against the face of the rock by an hydraulic ram exerting a pressure of

about 10 tons. A couple of small cylinders drive the mandrel holding the cutter through worm gearing, and the exhaust water issuing from them is shot up the centre of the drill, serving the double purpose of cooling the metal and removing the detritus.

The severity of the work soon wears down the three fangs at the cutting-edge, which must be re-formed in the smithy, where 300 to 500 cutters are treated daily, according to the nature of the stratum encountered, and in addition 1000 to 3000 hand chisels.

The drills are tended by fourteen or fifteen of the smartest miners, capable of sustained work under most trying conditions, and supervised by a foreman and engineer. The slowly revolving cutters having made eleven holes 3 feet 3 inches to 4 feet 7 inches deep in the face, the drill beam is twisted round on its truck and run into a place of safety. Then the dynamite truck advances with its deadly load. Special workmen place 6 lbs. of explosive into each hole, fix the detonators and fuses, and ram in fine borings behind as “tamping.” When all is ready the fuses are lit, and every one quickly withdraws into shelter. From their refuge the men count the reports, which are accompanied by a violent rush of air and dense fumes. The last are precipitated by jets of water from the high-pressure hydraulic main, let loose after each explosion.

Ten minutes having elapsed since the last discharge, the men return to the heading to pile the débris into trucks, which are hauled out by small ponies to the

air-locomotives, which pass them on to the steamers. Each "lift," or advance, of the drills removes 264 cubic feet of rock. In hard rock only three or four lifts are made a day, but in soft the number rises to eight or ten.

The general method of clearing out the workings to full section is similar to that already described in connection with the Severn Tunnel. The blasted passage serves as the lower heading, from which shafts are chiselled upwards to the elevation of the tunnel crown, to act as starting-points for the upper galleries. As soon as the arch has been quarried out, the floor separating the two headings is cut away, and the lower portion enlarged. Wherever necessary, an elaborate system of timbering insures the safety of the workmen, and prevents the caving-in of the sides. The masons follow hard behind the excavators, and put in the lining of stone.

When the tunnel is completed, special attention will be paid to its ventilation. At Brieg and Iselle the entrances are to be provided with stout curtains to turn the air from one tunnel to the other through a cross passage at the extremities. Air forced in from Brieg will travel to Iselle through one tunnel and return through the other. The same effects will result from suction. The curtains are of a material which will not offer sufficient resistance to damage a train, if by accident they are not removed in time for its transit.

Marseilles is a long way from the Simplon, yet the Marseillais will feel the effects of the tunnel. On the

opening of the Mont Cenis route, the eastern mail services were transferred from Marseilles to Brindisi, and passengers also largely used the same means of shortening the journey to India. Another serious blow at the prosperity of the great southern French port was struck by the St. Gothard tunnel, which places Bâle 135 miles nearer an important harbour (Genoa) than it is to Marseilles. Consequently, all the merchandise sent from England, Belgium, Holland, and German Switzerland now goes to Genoa by rail for shipment to the Mediterranean sea-board. The completion of the Simplon project will still further increase the commercial importance of Genoa at the expense of Marseilles ; and the position has become so serious that plans have been proposed for connecting the latter town with the Rhone at Bras Mort by a canal 34 miles long, skirting the Gulf of Lyons for part of its course. The work is estimated to cost 8,000,000 francs.

A canal 20 feet deep would enable vessels of 1000-tons displacement to reach points 300 miles up the river ; and if the cargoes were transhipped to 300-ton barges, they could pass over the existing system of internal waterways to Nancy, Paris, Havre, and Lille. The cost of water transport being but one-half of that by rail, especially in the case of heavy merchandise such as coal and other minerals, Marseilles may win back to herself much of the traffic that has been diverted by the far-away tunnels in the Alps.