The romance of modern engineering, containing interesting descriptions in non-technical language of the Nile dam, the Panama canal, the Tower bridge, the Brooklyn bridge, the Trans-Siberian railway, the Niagara Falls power co., Bermuda floating dock, etc., etc.;
A concrete culvert, 730 yards long, leads the strained water to a tunnel piercing the hill at the south-east side of the lake. This tunnel, 7 feet in diameter and 2¼ miles long, terminates in an open well, in which the inlets to the three pipe lines are fixed. Each line is, or will be, of such capacity as to pass 14,000,000 gallons daily.
The total length of the aqueduct, in which there is very little tunnelling, is 67 miles. It falls into seven main portions, each of which terminates towards Manchester in a "balancing reservoir" on the hydraulic gradient. At Norton, where the natural level is 110 feet below the gradient line, a fine red sandstone tower of that height was built, carrying in the top an enormous bowl 80 feet in diameter and 31 feet deep at the centre. The bowl is supported, at the circumference only, by steel rollers, which allow for expansive movements. Its capacity of 650,000 gallons renders it the largest bowl in the world.
At the river Weaver the aqueduct sinks into a channel dredged for it in the river-bed, and is held down by flanges engaging with stout piles.
Between Norton and the Prescot Reservoirs the engineers had their hardest work to do. For, in addition to crossing four railways, the aqueduct encounters four canals and the river Mersey. The
Romance of Modern Engineering
Manchester Ship Canal length was carried out during the construction of the canal by cut-and-cover work, a culvert 305 feet long being built with terminal shafts at each end of ample section for three lines of 36-inch steel pipes.
Scarcely has the aqueduct risen on the north side of the canal when it descends again for a long plunge under the Mersey. "In point of difficulty, this work proved to be the most important upon the whole aqueduct. It was the first tunnel ever constructed by means of a shield under a tidal or other river through entirely loose materials. A romantic and instructive account might well be written of the battles with the elements, of the repeated failures and successes, and of the hairbreadth escapes, with ultimate pronounced success, which attended this subterranean and sub-aqueous work."1
The tunnel was only 900 feet long and but 9 feet in internal diameter, yet its construction occupied forty-seven months, baffled two contractors, and had to be completed by the Corporation engineer, Mr. G. F. Deacon.
The Company had contemplated laying the pipes in the Mersey bed in the same way as had been done at the Weaver, but the Parliamentary Committee ordered a tunnel under the river. Owing to the loose and porous nature of the Mersey bed the engineers at first proposed a tunnel that should be 104 feet below the
1 Mr. G. F. Deacon. Proceedings of Inst. C.E.
surface on the Cheshire, and 174 feet below on the Lancashire side. But the estimated cost was so heavy that they decided to drive a horizontal tunnel 50 feet below high-water mark. The first contractors in twenty months had sunk the shafts and driven the tunnel for 57 feet. They then ceased work. The second contractors drove and lined 182 feet from the Lancashire shaft, and then also relinquished the task. The great obstacle was the difficulty in keeping water off the working face. In sinking a vertical shaft under air pressure it is easy to prevent the water from passing under the edge of the shield, which is horizontal, and therefore acted upon by an external head of water at all points equally. But in the case of a tunnel, the shield is vertical, and the head increases towards the bottom of the face. So that, where a porous water-logged stratum is encountered, if the pressure inside the shield suffices to keep out the water from the lower portion of the face, it may overcome the water pressure of the upper portion and force the air out and upwards. If, on the other hand, the upper portion only is considered, the pressure may not be great enough to exclude leakage into the lower part of the face. Matters were further complicated in the Mersey aqueduct tunnel by the head of water in the stratum varying with the tides.
The shield employed by the second contractors was too light for the work, and the cutting-edge collapsed for one-fourth of its circumference. When Mr. Deacon took over the responsibility, he had first to
repair the shield, a matter of great difficulty. But when the process was completed, operations progressed at a satisfactory rate, except during twelve days consumed in further repairs. At the end of four and a half months the tunnel was completed, the lining of cast-iron segments being placed in position behind the shield as the latter advanced.
The aqueduct is furnished with stop-valves every 2½ miles, and with 11 automatic valves, similar to those of the Thirlmere aqueduct, to shut in case of a burst.
In 1893 a telephone system was installed between Prescot and Vyrnwy, a double line for speaking, and a number of short lines from the automatic valves to the nearest signal station, so that an alarm will be given immediately after the occurrence of an accident.
On November 28, 1898, the outlet valves of the Vyrnwy Dam were closed, except those for compensation water, and by November 25 of the following year a new lake had been formed to the overflow level.
The quantity of water now delivered through the pipes (single line) from Oswestry to Prescot Reservoir is 15½ million gallons a day.
THE BIRMINGHAM SCHEME
The third aqueduct that we shall consider in some detail is one which in a few years will connect Birmingham with the head-waters of the Wye in two valleys of Radnorshire.
As at Manchester and Liverpool, the rapid increase of population has compelled the authorities to derive
an adequate water supply from a district favoured with a heavy and uncontaminated rainfall.
Mr. James Mansergh, called into consultation by the Corporation, laid his hand upon the little rivers Elan and Claerwen in distant Wales as the source from which the great hardware town should draw a copious supply.
The scheme for impounding these rivers in the same manner as the Vyrnwy was of course a very expensive one, but the common sense of the Birmingham ratepayers determined that the outlay must be faced, with the result that a Bill introduced by Mr. Chamberlain in 1892 received the prompt sanction of Parliament, granting the Corporation borrowing powers to the extent of £6,600,000.
At a spot half a mile below the junction of the valleys of the Elan and Claerwen, is reared a masonry dam 120 feet high and 600 feet long, which will pen in a serpentine reservoir extending a mile up the Claerwen and about two miles up the Elan valley. This reservoir is but one of six that will be eventually formed by as many dams, rising like a gigantic water ladder up the valleys. The total storage will be 18,000 million gallons, ensuring a maximum daily supply to Birmingham of 77 millions, in addition to 27 millions of compensation water to the Wye.
At present four dams are in progress ; the lowest, the Caban Coch, referred to above ; the next, the Careg Dhu, a submerged dam only a few feet high ; the third, the Pen-y-Gareg, 128 feet high and 525
long ; the fourth, the Craig Goch, 120 feet high and 625 long. The first will impound 8000 million gallons, Pen-y-Gareg 1320 millions, the Craig Goch 2000 millions ; the surface of each reservoir at highest level reaching to the foot of the dam further up the Elan valley. When a still larger quantity is needed two other dams will be built across the Claerwen, and their reservoirs connected with the main Caban Coch by a tunnel cut through the intervening hill.
When the dams are completed there will be seen a succession of beautiful lakes nestling between slopes well clad with woodland down to the water’s edge.
The masonry is of the usual solid description prevailing in such works, the greatest breadth at the foundation being about equal to that of the maximum height.
For the accommodation of the workmen a regular village has been laid out on one side of the Elan, with streets of houses, a school, recreation rooms, a Corporation public-house, where limited quantities of liquor are sold at certain hours, and well-ordered hospitals. A bridge over the river is the only approach, and every one who would enter the village to seek employment is examined as to his physical condition, health, and capacities, before he is allowed to cross. A sort of octroi is established at the bridge end to keep out contraband articles, among which liquor is chief. Thanks to these arrangements the health and wellbeing of the community has been maintained at a high level, and the precedent is one which may with great advantage be followed.
Dams and Aqueducts
The intake to the aqueduct is immediately above the Careg Dhu, the submerged dam, surmounted by a lofty aqueduct. The top water of the Caban Reservoir being 822 feet above sea level, and the crest of the submerged dam 780 feet, a slice of water 42 feet thick can be withdrawn before the levels on the two sides of the dam begin to differ. This slice will contain sufficient water for the daily compensation and a 27-million-gallon daily Birmingham supply for 100 days, with the yield of the watershed ; and, when it has been withdrawn, 100 days more compensation water will still remain in the part of the main reservoir below the submerged dam, while the water impounded by the latter and the two upper dams will still be available for the aqueduct.
This is 74 miles long, from the Elan to the Frankley Reservoirs, between which points there will be a fall of 170 feet, or an average hydraulic gradient of 1 in 4000. About one half will be tunnel and culvert work, the balance six lines of 42-inch iron and steel pipes for the syphons (the longest 17 miles), in which the greatest pressure will be about 250 lbs. to the square inch. The water-way in the tunnels and culverts is 8 feet 6 inches in breadth and height. The longest tunnels are 4½, 2½, and 1½ miles in length. Wherever a river is encountered the pipes will cross on specially built bridges.
So in a year or two water will flow copiously from the wide glen in which the river rushes busily over its rocky bed on the way to the broad Severn. Cwn
Elan, at one time the residence of the poet Shelley, will share the fate of the village at Vyrnwy ; and over the Caban Coch dam will roar, in flood-time, " the finest waterfall in the kingdom," to use the words of Mr. Mansergh, the engineer of the works.
OTHER DAMS AND AQUEDUCTS
So numerous are these that reference cannot be made to all. But a few are specially worthy of mention. The Periyar Dam in Travancore, India, pens the river of that name into a lake of nearly 12 square miles area ; and a tunnel through a hill on one side connects this reservoir with the Valgai River, which carries it down to the irrigation of Madura, a district that had for time immemorial suffered from severe droughts.
Two wooden-stave pipe lines join Denver City, Colorado, with a river 20 miles away in the Rocky Mountains. The lines are 30 and 34 inches in diameter, and pass 8,400,000 and 16,000,000 gallons daily. Six miles of wooden pipes, mostly 6 feet in diameter, supply Ogden, near Salt Lake City, with water from a storage reservoir containing 15,000 million gallons. These wooden pipes are said to be as durable as those of cast iron, provided that they are always full of water.