In the Eastham division of the Canal three large embankments were made, known as the Pool Hall, Ellesmere Port, and Ince Bay embankments. The method generally employed was to tip two parallel mounds of rubble on the foreshore to act as toes, or supports, for the lower edges of the embankment slopes, and then pile between them mounds of stiff clay.

At some points the engineers encountered great difficulties, owing to the pressure of a substratum of mud or sand through which the estuary water forced its way to the workings. In Ellesmere Bay especially,

The Manchester Ship Canal

for a distance of 1151\frac{1}{5} miles, a particularly staunch protection was needed, for although at that time the deep channel of the Mersey lay on the north side of the river estuary, it had formerly passed close to the southern bank, and might return thither again. Accordingly for 5400 feet, two parallel rows of piles, 1 foot square and 35 feet long, were driven down contiguously into the sand so as to form two wooden walls 78 feet apart, the summits of which were at the bottom of the embankment. To make these subterranean walls the more secure, two additional rows of piles—shorter, and 6 feet apart—were sunk to the same level at distances of 20 feet from the inner row, and 25 feet from the outer row, and anchored to the sheet piling by stout cross timbers.

The driving of these piles, which represent a total length of 100 miles of foot-square balks, would have been practically impossible, not to say ruinously expensive, had force only been used. Recourse was therefore had to the erosive action of the water-jet, a device that has proved of immense use in many undertakings. A jet of high-pressure water was pumped by steam-engines through a pipe of 1½ inch bore and 40 feet long, which preceded the pile in its downward course, softening and loosening the sand to such a degree that the pile easily pierced the stratum. Twenty-one pile-drivers were kept at work, the best week's record being 554 piles sunk into place.

As the rows lengthened a trench 15 feet deep was

excavated behind the piles for an average width of 12 feet, and immediately filled in with rubble and clay in equal amounts. This gave a firm and watertight foundation for the superimposed embankment. At intervals cross dams were built from side to side of the Canal, so that the failure of one part of the embankment should not flood the whole of the works.

Just below Runcorn lock a concrete wall, 4300 feet long, is substituted for earthwork. The wall is founded upon sandstone rock at its extremities, its central portion resting on gravel. It has a bottom breadth of 22 feet, tapering to 16 feet at the summit, which is about 40 feet above the foundation. The vertical side facing the Canal is protected from damage by timber fenders. This wall is in itself a large and costly piece of construction.

So well have the engineers done their work, that after several years the walls remain staunch and sound, in spite of severe storms.

Some of the most difficult portions of the Canal are included in the Irlam division, which extends from the twenty-sixth to the thirtieth milestone above Eastham. The cutting here is deep, and, as the line of the Canal crosses the beds of the Mersey and Irwell many times, construction proceeded in short lengths across the bends, the river being allowed to pursue its natural course until each chord was completed. The dams at either side were then cut and the arc of river turned into the artificial channel, the dried bed being filled in with the spoil of the excavations.

The Manchester Ship Canal

The strata of blue clay, gravel, and alluvial deposit were of such a nature as to cause the sides of the cuttings to fall in and sometimes entirely bury the steam-navvies and other plant employed in excavation. At one place a "slip" was burnt and replaced in the hole made by its subsidence, but, as a rule, the slipped material was cleared away and lumps of rock and quarry rubbish substituted.

Most of the excavating was done by steam-navvies of English, French, and German design. The English machine is stationed in the bottom of a cutting, and works a great ladle attached to the end of a beam, scraping up the side of the cutting until the ladle is filled with its load of 1 to 2 tons of material. The arm then swings round and deposits the spoil into a truck. The foreign patterns resemble ordinary marine or river dredges, the earth, &c., being collected by an endless chain of small buckets working round a boom which is gradually lowered into the hollow eaten out by the buckets. The French navvies proved particularly useful in light soil or soft clay. The English make would deal with all sorts of material, including blasted rock, which defied the other types. Apart from the dry excavating these machines were serviceable, as the English navy could be easily converted into a 10-ton crane by the removal of the ladle, while a slight alteration of the French excavator fitted it for work under water.

Thanks to these powerful allies the rate of excavation attained 250,000 cubic yards a month in the

Irlam division alone. Even when rock was handled the total for the same period reached 100,000 cubic yards.

In several places the excavated material was used in the deviations constructed to carry the railroads that cross the Canal at various points. The interruption to passenger traffic would have been so great had opening bridges been employed that the Canal Company adopted high-level viaducts, the under side of which was 75 feet above the level of the canal. In order to preserve a gradient not exceeding 1 in 135, embankments of great length were unavoidable, and their construction cost the Company no less than £875,000. There are four railroad deviations ; one at Warrington to carry the London and North Western, and Grand Junction lines ; another at Latchford for the Warrington and Stockport Railway ; a third at Irlam ; and a fourth at Cadishead ; the two last for the Cheshire lines. The girders spanning the Canal vary in length from 150 to 300 feet according to the angle of their crossing.

Nine important high-roads had also to be given a passage. At Warburton and Latchford small editions of the Forth Bridge afford a permanent means of communication at the same height as the railway viaducts. The remaining seven are swing bridges, revolving on masonry pillars, with spans ranging from 75 to 140 feet. The Moore Lane Bridge may be taken as typical. It is 238 feet from end to end of the span, the longer arm 240, the shorter 98 in

length. The main girders are 27 feet 8 inches deep at the centre, diminishing to 6 feet and 8 feet 9½ inches at the extremities of the arms. These girders rest on a square of cross girders, attached to the upper roller-path. A live ring carrying 64 conical rollers separates this from the lower roller-path on the top of the masonry pier. The whole is swung round by hydraulic machinery.

The most interesting feature of the Canal is undoubtedly the Barton Swing Aqueduct, to which allusion has already been made. The Bridgewater Canal, built in the eighteenth century for the Duke of that name by the famous Brindley, connected the Worsley coalfields with Manchester, and subsequently Manchester with Liverpool. The Canal was, and is, considered a wonderful feat on account of the bold project, successfully carried out, of its engineer to keep it absolutely free of locks into Manchester by raising embankments and viaducts, and cutting tunnels wherever the ground level fell away or natural obstacles intervened. To cross the Irwell he built a stone and brick aqueduct, which was the first of its kind, and one of the Seven Wonders of its time. When the Irwell became in turn a canal, the question arose how one waterway should cut the other. The smaller must, of course, give way to the more important, but the construction of locks from the higher to the lower level would entail a waste of water which the Bridgewater supply could not make good. Sir E. Leader Williams met the difficulty by a conception

as unique as that of Brindley. The Canal should not have its level interfered with, but a section of it should be bodily moved out of the way of passing steamers. The masonry was pulled down and replaced by an iron trough resting at its centre on a pier rising in mid-channel. The following is a description given by its designer 1 :—

"The pier is mainly built of concrete, with brickwork and granite in the part that takes the weight of the aqueduct, 1400 tons, including the water which is always in the iron trough through which the barges pass. The sides of the trough are 1 foot above the water level ; it is carried by side girders 234 feet long, 22 feet 3 inches apart from the centres of the girders, which are 33 feet deep, tapering off to 28 feet 9 inches at the ends, with a side tow-path carried on a gallery 9 feet above the water level. Water-tight iron swing-gates are provided at each fixed shore end, and also at each end of the trough ; when all four gates are open, barges pass along the Canal as usual. If a ship is to pass through the aqueduct all the gates are closed, the shore gates keeping back the water in the Canal, and the other gates confining the water in the trough when it is swung open for the passage of the ship. The gates are worked by hydraulic power, as is also the trough, which can be swung with barges in it, the gross weight to be moved remaining the same. At each end of the trough a water-tight joint is made by an iron wedge-piece of the shape of the cross section

1 Proceedings of the Institution of Civil Engineers, 1897-98.

of the end of the trough, both ends and bottom being faced with india-rubber. The fixed and movable ends of the aqueduct are slightly tapered, and about 1 foot apart ; this vacancy is filled by the wedge-piece, which weighs about 12 tons, and is lifted by four hydraulic rams sufficiently to allow the trough to be moved, the water between the gates being passed off into the Ship Canal. The junctions just described are not at right angles to the trough, but are slightly diagonal, so as to allow sufficient clearance for moving the trough. After it has been again closed, the wedge-piece is dropped on to its seating, being of the same taper as the ends of the trough and aqueduct.

"The arrangement of the annular girders, rollers, &c., are the same as those for the heaviest swing-bridges already described, but half the weight of the movable portion of the aqueduct is taken by a central hydraulic press, 4 feet 9½ inches in diameter and 2 feet 3 inches deep, which acts as a pivot and is free to turn ; a hydraulic buffer and locking bolts are also provided. The power is obtained from the adjacent hydraulic station, which is also used for the road swing-bridge. The aqueduct has never given any trouble, working quickly and with smoothness, a result for which much credit is due to the constructors, Messrs. Handyside & Co."

Not many miles from Barton may be seen another remarkable instance of barges moved in closed troughs with the same object of avoiding lock wastage. At Anderton, some little distance south of Runcorn,