The romance of modern engineering, containing interesting descriptions in non-technical language of the Nile dam, the Panama canal, the Tower bridge, the Brooklyn bridge, the Trans-Siberian railway, the Niagara Falls power co., Bermuda floating dock, etc., etc.;
CHAPTER XIII
THE MANCHESTER SHIP CANAL
A STRANGER dropped suddenly among the quays and wharves of Manchester, seeing around him great ships upwards of 9000-tons burden, great cranes unloading cargoes, and hundreds of waggons and railway trucks receiving the same from towering warehouses, would at once exclaim, “Surely this is not far from the salt sea waves!” and might imagine that the breezes rippling the broad expanse of water before him are blowing fresh from the open ocean. But let him board yonder vessel just casting off her moorings for an outward voyage, and follow her fortunes for a few hours, and he will understand that the road to the true home of all this shipping is a long one, and that Manchester has lured these shapely masts and smoking funnels far into the heart of Old England by a waterway that stands among the foremost of the world’s engineering romances.
Let us accompany our passenger, and through paper and ink see what he sees.
As we pass by the long wharves lining the water, the channel gradually contracts to a width of some 250 feet, but widens to 400 as we approach the Mode Wheel Locks. These are two in number, the one 600
feet long by 65 broad, the other 350 feet by 45. Our vessel enters the smaller, and in five minutes has descended 13 feet towards sea level. We proceed for 2¼ miles, over what was once the bed of the Irwell, until our attention is arrested by a curious sight—a barge borne aloft in mid-air in a gigantic iron trough, known as the Barton Swing Aqueduct. How did the barge get there? Look to left and right and you behold, far above the canal level, two iron gates. Behind these the Bridgewater Canal is pent, while a section of it is calmly swung round — also enclosed by shutters at each end—with its floating freight, that we may pass. As we drop into Barton Lock, the hydraulic machinery on the mid-channel pier slowly brings the trough athwart our pathway, and in a few minutes the bargeman is urging on his horses en route to Worsley.
The country north and south of us is studded with the numerous towns that make this the most thickly-populated district of England. Had we but ears to hear, the whirr of innumerable spindles would speak to us of the great cotton industry of which Manchester is the heart ; and into which the Canal is pouring the life-blood of commerce, to be distributed by the lesser arteries and veins of waterway and railroad.
A few miles, and we slow up once more for the passage of Irlam Lock, which lowers us another 16 feet ; and when freed we pass under a great railway bridge, and note on our left the entrance of the Mersey into the Canal. Our voyage is unbroken for
The Manchester Ship Canal
7 miles. Inland-bound vessels pass us at a stately pace of 5 to 8 miles an hour. There is no need to make for a “siding” to give the other room, as the Canal has a generous width—120 feet at bottom, increasing to nearly double near the locks. At Rixton Junction the Canal leaves the river-bed, and becomes purely artificial for the remaining 24 miles of its length. At Latchford, 14½ miles from Manchester, we again enter a lock, and drop from (comparatively) fresh into salt water, for at certain states of the tide no barrier is interposed between Latchford and the sea. We are now 60 feet lower than our starting-point, having descended in four bold steps.
Sailing with a straight course, we come to Runcorn, an important town on the now broadening Mersey. The river is within a stone’s-throw of our boat, but it will be a long time yet before we enter its waters. The canal now makes two sweeps, the first southwards from Runcorn, the second gradually northwards along the southern bank, behind great embankments dividing the Canal from the river. Eastham reached, we pass the open lock—for the tide is up—and pass out into the Mersey at a point 35½ miles from the great cotton town.
We may now glance at the history of this undertaking.
As early as 1721, the necessity for efficient water communication between Manchester and Liverpool—then a rising port—caused Mr. Thomas Steers, an engineer of repute, to issue plans for canalising the
Romance of Modern Engineering
Mersey and Irwell from Warrington—to which small vessels ascended on the tideway—to Manchester. His scheme was carried out and subsequently extended, to compete with the Bridgewater Canal, which united Manchester with the Mersey at Runcorn. The canal then absorbed the "Mersey and Irwell Navigation" in 1844, and the two became formidable rivals to the railways ; and finally, in 1886, both were transferred to the Manchester Ship Canal Company for the sum of £1,712,000—a sufficient proof of their importance.
The first scheme for constructing a ship canal was mooted in 1825, when a Company was formed to unite Manchester with the Dee by a canal 51 miles long, containing fourteen locks. It came to nothing, however, sharing the fate of two later proposals, the second of which deserves short notice. In 1840 Mr. Henry Palmer drew up a plan for the Mersey and Irwell Navigation Company for deepening the existing waterway sufficiently to pass vessels of 400tons burthen to Manchester. By means of training-walls built in the river above Runcorn he thought the concentrated scour of the tides might be compelled to keep open a channel with a minimum depth of 10 feet. Locks and weirs would be established in the upper river ; so that ships of the size mentioned could all reach Manchester except those with fixed masts, which would be compelled to discharge cargo at Barton, where the Bridgewater Aqueduct crossed the course.
The Manchester Ship Canal
In 1882 the question was again taken up, this time with great energy. Seventy leading Manchester merchants and manufacturers instituted surveys and reports on the "feasibility of constructing a navigation to Manchester available for ocean-going vessels." Mr. H. H. Fulton and Sir E. Leader Williams undertook the surveys. The former was in favour of a tidal canal all the way to Manchester, where the rise of the country would necessitate a basin 90 feet below the level of the town. His colleague, however, spoke for a locked canal above Runcorn, on the grounds that the cost of excavation would be far less, and that the presence of locks would convert the river into a series of practically still-water pounds.
The latter plan was accepted by the Company, which in 1883 introduced a Bill into Parliament for constructive powers, but the application was thrown out by the House of Lords after passing the Committee of the House of Commons. When introduced again the following year, the Lower House in turn rejected it; but on a third attempt in 1885 the Company gained its end after the costs of introduction and opposition had amounted to £250,000.
The Committees left their mark on the Bill, however, for the Act demanded that for the training-walls in the Mersey should be substituted a semi-tidal canal along the Cheshire side of the estuary, entering the Mersey at Eastham, 6 miles above Liverpool, whence a good low-water channel led to the deep waters.
After some hesitation on the part of Lancashire
financiers, the necessary capital was subscribed, and the late Mr. T. A. Walker, of Severn Tunnel fame, obtained the contract for £5,750,000. On November 11, 1887, the first sod was cut at Eastham. On May 21, 1894, the late Queen Victoria formally declared the whole Canal open to traffic.
This titanic work necessitated the excavation of 54 million cubic yards, nearly a quarter of which was sandstone rock. At the busiest period 17,000 men were engaged, aided by 80 steam navvies and dredgers, 316 steam engines and cranes, 173 locomotives, and 6300 waggons and trucks running on 228 miles of temporary railway, the value of which plant approached a million sterling. The cost of the canal, including construction of works, the purchase of lands (£1,289,000), purchase of canals (£1,786,773), parliamentary expenses, general expenses, surveying, &c., amounted on January 1, 1897, to the huge total of £15,168,795, 15s. 11d., a sum greatly in excess of what the promoters had originally contemplated. It must be mentioned, however, that as the work progressed, the scheme enlarged itself in the direction of greater dock and warehouse accommodation, &c. The untimely death of Mr. Walker in 1889, by throwing the contract on to the Company, involved it in considerable loss.
As often happens in great engineering feats, the "unknown quantity" of unforeseen natural obstacles, such as faults in the strata excavated, and heavy floods, pressed hard upon the contractors and pro-
motors. In 1890 and 1891 winter floods worked great havoc with the cuttings. One cutting, in the Irlam division, was almost completed when the natural dam at the Manchester end, shutting it off from the river, suddenly gave way under the pressure of the spate, and in ten minutes over 250 million gallons of water had rushed into the cavity, bearing with it more than 100,000 cubic yards of material. When the water had been pumped out, under cover of a new dam, trains of waggons were found tied up in knots, and heavy machinery scattered far and wide. During the two years mentioned, no less than twenty-three miles of cuttings were filled prematurely by water, which had, of course, to be pumped out before work could proceed.
Retracing the course of the canal, we will remark upon its most noticeable engineering features.
Throughout its length excavation was needed, but in varying degrees. From Eastham to Runcorn, the level of the estuary at high tide being equal to, or greater than, that of the mean level of the Canal, embankments were necessary for long stretches. Between Runcorn and Latchford, where tidal action ends, the Canal leaves the river and enters higher ground, necessitating cuttings from 70 to 40 feet deep. From Latchford to the junction with the Mersey again the cutting is continued, but from the latter point to the confluence with the Irwell embankments once more are employed to keep in the water. The upper reaches of the Irwell required further
cuttings 30 to 40 feet deep. The depth of water is kept by the locks at 26 feet throughout, the gates at Eastham being closed as soon as the tide level of the estuary has fallen to that height above the bottom of the Canal. During the flow of the spring tides, the opened gates permit a greater depth up to Latchford. A peculiar feature of the Canal is the rapidity with which the tides work up to Latchford, where, at high spring tides, the level is raised to 9½ feet above normal about half-an-hour after high tide at Eastham, 21 miles farther down. Within 2½ hours of high water at Latchford all this extra volume has again left the Canal. The result is a strong current, which in turn entails the lining of the Canal side with stone facings, which have also to withstand the scouring action of a ship's wash. The latter consideration has indeed made such a protection necessary throughout the Canal, except in a few places where natural rock is met with of a sufficient height.