The romance of modern engineering, containing interesting descriptions in non-technical language of the Nile dam, the Panama canal, the Tower bridge, the Brooklyn bridge, the Trans-Siberian railway, the Niagara Falls power co., Bermuda floating dock, etc., etc.;
As though the lot of the engineers and contractors had not yet been sufficiently hard, the sea next showed its malice. The shore on the Welsh side is, at the water’s edge—the site of the Old, Iron, and New Shafts—considerably above the high-tide level. But farther inland there are flat, low-lying marshes—once fertile meadow land protected by a sea-wall—liable to be swept by spring tides. In the centre of the marshes the Marsh Shaft had been sunk.
On October 17, 1883, the night-shift had descended to their work in the headings opening from this shaft. It was a tempestuous night, the wind blowing southwest, and an unusually high tide was known to be due. Previously no tide had ever reached the site of the shaft, and there appeared to be no reason for anxiety. But the wind working with the tide, as it did in November 1897 on the East Coast, piled up the waters in the Severn estuary to an alarming height.
Romance of Modern Engineering
A great tidal wave, advancing in a solid wall, burst over the marshes. Some houses, belonging to a tinfoil plate works, were invaded by the flood to a depth of 5 or 6 feet, and the children had to be placed for safety on piled tables or shelves. The wave next attacked the pumping-station and extinguished the fires. Then, meeting the shaft, it roared down a fall of 100 feet. What must have been the feelings of the unhappy miners below ! A few managed to climb the ladders and escape, but one poor fellow, when halfway up, was torn off by the violence of the water and hurled into the gulf below.
There remained eighty-three men in the shaft. As the water rose they retreated farther up the gradient, waiting for the end. Meanwhile others, at the ground level, were making desperate efforts to form a circular dam round the mouth of the shaft. Sacks, timber, and even clothing were used. Fortunately, the first fury of the tide was soon expended. The dam served its purpose, and preparations were made for going below with a small boat to explore the tunnel. At the bottom of the shaft the water had risen to within 8 feet of the tunnel crown. The men were finally rescued from the break-up in which they had taken refuge, and brought safely to the top. Had the tide been a few inches higher it is probable that not one would have survived the catastrophe.
The position of affairs was now indeed lamentable. Flooded headings, flooded cuttings, and a spring of unknown copiousness to reckon with. The clearing
of the sea water was only a matter of time, and the workings were soon emptied. But the delays, meaning extra wages, the continually recurring need for new pumps and engines to meet some fresh catastrophe, and the huge bill for fuel, had already put the contractor £100,000 out of pocket! Still he must persevere with his arduous and wearing task: the tunnel must be finished even if it ruined him.
To the Big Spring Sir John Hawkshaw and Mr. Walker now turned their earnest attention. As a preliminary to underground operations, the bed of the small river Neddern—suspected of feeding the Spring—was lined with a concrete invert for nearly 4 miles. A heading was then driven parallel to the centre line of the tunnel, but 40 feet to the north of it, so as to drain the Spring from the flank and leave the site of the tunnel dry. The plan succeeded so well that it was possible to push on the top heading towards that running from the next shaft, and on October 17 a way lay clear from one end of the tunnel to the other. The chambering out of the Spring length was, however, a difficult business, as small fissures crossed the line here and there. But at last the masons completed their work, and the tunnel lining was finished.
On September 5, 1885, a train passed through the tunnel from end to end carrying the chairman of the Great Western Railway and a party of friends. Mr. Walker shortly afterwards quitted the scene of his labours for South America, where other work awaited
him. His old enemy soon called him back. The Great Spring was giving trouble, squeezing the tunnel lining with such force that bricks flew out from their settings. In order to relieve the pressure it was decided to erect a pumping-station for permanent use. Every day water to the average amount of 24 million gallons is emptied by the pumps into the Severn, a supply sufficient, as Mr. Walker has calculated, to form annually a lake 1000 acres in extent and 30 feet deep.
The passenger whose lot it is to be plunged for some minutes into the darkness of the Severn tunnel, will, after reading these lines be able better to appreciate the magnitude of the work needed to make his swift passage a possibility. Here are a few points for him specially to ponder upon: That the construction of the tunnel occupied fourteen years, and consumed over 77 million bricks ; that the water pumped out during those years represents a lake 3 miles square and 30 feet deep ; that though the working was conducted from more than forty break-ups, the calculations were made so accurately that, when the sections joined, no deviation from absolute straightness in the 2¾ miles of straight tunnel could be detected by instruments.
Among submarine tunnels the Severn holds first place on the score of difficulty in construction. Mr. Walker himself confesses in his book that one such tunnel was sufficient for a single lifetime.
CHAPTER XII
THE SIMPLON TUNNEL
An entertaining volume might be written on the conflicts between the snow-clad, storm-swept Alps, and man, the soldier and engineer. How stirring is the story of Hannibal and his Carthaginians, fresh from the burning sands of Africa, pushing through the icy horrors of the Little St. Bernard! And of Napoleon, snatching a shovel from the numbed grasp of a pioneer to lead the attack on the drifts of the pass that lay between him and the famous field of Marengo!
Admirable as was the courage that enabled Carthaginian, Gaul, Goth, Hun, and Frenchman to triumph over the resistance of nature, we must not let the fascination which attends the clash of arms blind us to the romance of the later phases of the struggle, still being waged, though time has changed the fashion.
Now no longer is seen the train of elephants or baggage mules, and the glitter of spear and sword and bayonet. In their place we have the iron steed climbing steadily through the rocky fastnesses, and those wonderful weapons of the engineer, the theodolite and persistent mechanical drill. Armies occupy
the glens, but they are armies of workmen. Generals issue orders and direct the march ; but the march is one of peace, more fraught with the good of mankind than was the passage of invading hordes.
What patience and skill is represented by the great tubes that pierce Mont Cenis, Mount St. Gothard, the Arlberg, and the Simplon ! Yet the names of the men who planned and executed such deeds are unknown to the world at large, though every schoolboy is familiar with Hannibal and Napoleon.
The dash into the darkness of a tunnel is so frequent an occurrence on a railway journey that we reck little of it. Perhaps sometimes, after losing sight of the sunshine for several minutes, we have a dim consciousness that there has been wonderful work done on that part of the line ; and we return to the perusal of our books and papers while our train speeds on over or through other engineering triumphs. Having eyes, we see not.
Think of the task that an engineer sets himself when he undertakes to burrow through a mountain for several miles. To save time he must commence the work at both ends simultaneously. To make sure of the headings meeting he must not put tool to rock until all his calculations have been made most carefully by compass and theodolite, and verified time after time. To deal with the water springs possibly lurking in the mountain’s heart, he must drive the tunnel on a rising gradient to the centre—a much more complicated feat than a perfectly rectilinear
The Simplon Tunnel
course. To give his men an atmosphere fit to breathe, special apparatus for ventilation must be installed that will force the outer air deep into the very heart of the rocky mass.
All this entails years of anxious and unremitting toil. At any moment he may find himself face to face with an obstacle that threatens the ruin of his enterprise: the fall of a stratum, the inrush of a subterranean reservoir. There are many foes waiting for him.
In short, so great are the uncertainties and difficulties of tunnel-driving that the engineer, when confronted by a range or mountains of hills, decides in favour of burrowing only when calculation has shown that the longest way round is not the shortest way home. In adding up the total advantages of an open road in cutting, and of a tunnel, there are many things to be considered and weighed one against the other, economy controlling the balance. A détour costs less in construction, and is sooner open for traffic. A tunnel is shorter, less expensive to maintain, and avoids the heavy gradients of the open way. But its initial cost is enormous, both in time and money. Fortunately for international communication, the great advance in the art of tunnel-building has done much to remove the principal objections to tunnels, and when the choice lies between a tunnel and a long détour with stiff gradients, the former generally wins the day.
Hence some of the most remarkable engineering triumphs.
Romance of Modern Engineering
The story of Mont Cenis and St. Gothard tunnels has been told so often that it will be here but briefly recapitulated as preface to an account of an even greater undertaking still in progress beneath the Simplon.
Between Italy and France runs the range known in its different portions as the Graian and Cottian Alps. Prior to 1871 the Fell Railway, laid on the road built by the first Napoleon, transported travellers across the frontier. This track proving insufficient, Italian engineers began their surveys for a tunnel under the Grand Vallon, that should connect the Paris-Marseilles railway system, by means of a branch from Macon, with the Italian lines that converge on Turin. The work, commenced the same year, was, thanks to the aid of the newly invented air-drills of Sommeiller, completed in 1871 at a total expenditure of £3,000,000.
The following year witnessed the inauguration of a similar scheme for piercing the Mount St. Gothard, and linking up Belgium, Germany, and Switzerland with Italy, via Bâle and Lucerne. Nearly 300,000,000 francs were guaranteed by the countries most interested in the undertaking, and after the changes and chances of ten years, marked by labour and financial difficulties, the death of M. Favre, the contractor, and the Franco-German War, the tunnel was opened to traffic. In addition to the main tunnel, 9½ miles long, the engineers constructed several wonderful helicoidal (i.e. corkscrew-shaped) tunnels on the ap-
proaches, in which the track doubles back and over itself in a manner most bewildering to the traveller.
Length for length, the St. Gothard was driven almost twice as fast as the 8-mile Mont Cenis (or more properly, Grand Vallon) tunnel.
The cry was still for “more.” A glance at the map of Switzerland reveals a railroad running from Lausanne along the north shore of Lake Geneva, and on through the Rhone Valley to a terminus at Brieg. On the Italian side of the neighbouring Leontine Alps, the northern lines throw out a feeler to Arona, at the south end of Lake Maggiore. Between these termini the only present means of communication is a daily service of coaches, running over the fine mountain road. But this will soon be a thing of the past, as a tunnel is fast penetrating the Simplon in a straight line from Brieg to Iselle, a small town on the upper waters of the Diveria, a tributary of the river Toce. A new railway is being built from Arona up the Toce valley via Domo D’Ossola, to complete the connection and provide a new route from Paris to Genoa by way of Dijon, Portarlier, and Lausanne.