In November 1871 Mr. Charles Richardson deposited plans for the tunnel in Parliament, and in the following year an Act was passed for its construction.

The Great Western Railway Company at once set to work, after obtaining the services of Sir John Hawkshaw as consulting engineer. Sir John had already gained valuable experience of tunnelling in the completion of the East London Railway from Brunel's Thames Tunnel under the London Docks through Wapping, Shadwell, and Whitechapel—a work of extreme difficulty.

A start was made in 1873 by sinking a shaft—afterwards known as the Old Shaft—15 feet in diameter and 200 feet deep, on the Monmouthshire side, and lining it with brick. From the bottom of the shaft a heading, or horizontal excavation, was made river-

wards in the line of the tunnel, to act as a drain that should tap the tunnel at its lowest point under "The Shoots." It had an upward gradient of 1 in 500, and in section was 7 feet square.

Matters progressed so slowly, however, through want of a sufficient staff, that by the latter half of 1877, or after four and a half years' work, the Company, who were carrying on the excavations, decided to ask for tenders for the completion of the whole work. Three estimates were sent in, one by Mr. T. A. Walker, who afterwards took so important a part in the construction of the tunnel. But the estimates being considered excessive, the Company decided to continue a heading right under the river, in order to ascertain the nature of the strata to be pierced before going to the contractors. Small contracts were, however, let for the sinking of one shaft on the Gloucester side, and two on the Welsh side, known as the Marsh and Hill Shafts ; and for the driving of horizontal headings both ways from the bottoms of the shafts.

The Company then completed a second shaft for pumping near Old Shaft, and lined it with iron to within a few feet from the bottom, where it was connected to its neighbour by a short tunnel closed at the Iron Shaft end by a small trap-door.

On October 18, 1879, an incident took place which marked the date as a black day in the history of the tunnel. In order that the reader may understand clearly what follows, it will be necessary to

explain that 40 feet above the drain-heading running under the river from the bottom of Old Shaft, headings were being broken in both directions from the same shaft for the traffic tunnel, which at this spot would have risen some distance above its lowest point. Men were working in the western heading, when suddenly a large body of water was tapped, and after valiant, but vain, efforts to stem the tide, the excavators had to fly for their lives. The water, leaping from the heading-face a sheer 40 feet to the bottom of Old Shaft, began to fill up the long sub-river heading, and the men there would have had all means of flight cut off but for the cross tunnel to the Iron Pit, through which they escaped.

In twenty-four hours' time the whole of the workings in connection with Old Pit—that is to say, by far the largest portion of the excavations—were full to tide level, and the result of seven years' labour appeared a melancholy failure. Hitherto the general opinion had been that danger from water—that untiring, wakeful foe of the tunnel-driver—was to be apprehended while piercing the strata below the river. But inasmuch as the water that had burst in was fresh and sweet, it became evident that the engineers had to reckon with some subterranean supply fed by the neighbouring hills.

The Directors decided on drastic measures. They appointed Sir John Hawkshaw engineer-in-chief, giving him powers to place a contract with some one whom he might consider to be a fit person to carry

out the work. He selected Mr. T. A. Walker. This gentleman had already won his spurs as a railway surveyor and contractor in Canada, Russia, and Egypt; and under Sir John had completed the East London Railway extension referred to above. He now made a contract to finish the tunnel, cuttings, and approaches, a total length of 8 miles 26 chains; the tunnel to carry a double line of rails, and be 24 feet high inside from top of arch to lowest point of invert, with a maximum width of 26 feet at the spring of the arch.

In signing the agreement he entered upon an undertaking not to be matched in engineering, unless, perhaps, we except the driving of the Kilsby tunnel by Robert Stephenson. A digression for a few lines will be excusable, in order to remind the reader of Stephenson’s famous feat. When the North-Western Railway was in course of construction, the promoters proposed to carry it through Nottingham. But the Nottinghamians would have none of the new-fangled iron horse, and a détour must be made through the hills near Rugby. Stephenson faced the gigantic task of cutting a tunnel 1 3/4 mile long, after he had, by means of trial shafts, ascertained, as he thought, the exact nature of the strata to be encountered. A contract was let to build the tunnel for £99,000. Before work had proceeded far the unfortunate contractor ran against a large, water-logged quicksand. He died soon afterwards, heart-broken, though the Company generously waived the terms of the contract. Robert

Stephenson stepped into the breach, declaring that he was quite able to master the quicksand, by the simple, even if expensive, method of pumping it dry. The pumps threw out water ceaselessly for nine months at the rate of 1600 gallons a minute, but without any apparent benefit, until the patience of the Directors gave way. They said that to go on flinging good money after bad would be madness. "Give me another fortnight," replied Stephenson, "and if by the end of that time matters are as bad as ever, we must abandon the tunnel."

We may imagine the anxiety with which the work was watched. Every hour measurements were taken of the water flowing to the pumps. The end of the fortnight came perilously near, and still no improvement. How poor Stephenson must have despaired inwardly while keeping a brave front to his men! How deep must have been his feelings of gratitude and triumph when at the eleventh hour the word went round that the water was not gaining! The quicksand was almost dry, the tunnel was saved, and completed at a cost of £300,000.

Mr. Walker at once set about erecting pumps to battle with the Great Spring, as it came to be called, and to clear the flooded workings. Before these could be emptied it was necessary to block the heading into which the spring had broken at its opening from the Old Pit. Accordingly two shields were made of the same curvature as the shaft, sufficiently ample to cover the mouths of the headings on either

side. Unfortunately the depth of water from the surface to the headings—140 feet—produced so great a pressure that divers could not work in it, and it became necessary to lower the water 50 feet to reduce the strain. Great trouble was experienced with the pumps, which gave way first in one part of their mechanism, then in another ; but in spite of these untoward incidents the shields were fixed by the 24th January 1880, and made water-tight in a few days more. The Great Spring had now been cut off, but water still leaked in at the bottom of the Iron Pit in greater quantities than the working pumps could cope with, and there was nothing to be done but wait for the arrival of additional pumps. A new 18-foot shaft was put in hand close to the Old Shaft and over the line of the tunnel, to act as a pumping-pit.

At last a long-expected pump of large capacity arrived and was fitted in the Iron Pit, which had been cleared to within a few feet of the bottom when the pump burst with terrific violence, and in an hour or two the shaft was full again. The pump was repaired and replaced by October 14. On that day, at 11 A.M., began the final struggle with the water.

In twenty-four hours the water had been lowered 121 feet, enabling a damaged pump to be repaired and brought into action. These two pumps being able to do no more than “ hold ” the water that came in from the long sub-river heading, Mr. Walker determined to close, if possible, a door in a head-wall that had been

built across the heading at a point 1000 feet from the bottom of Old Shaft.

The task was one for a diver, and a brave diver too. To say nothing of the 30-foot head of water giving a pressure of 13 lbs. to the square inch, he must walk up the heading, drawing 1000 feet of hose after him, go through the wall door, close the flap of one sluice, return through the door, make it fast, and screw down a 12-inch sluice in the other side of the wall. A diver named Lambert undertook the job. Three other divers accompanied him part way to help pass the air-hose, the friction of which against the roof of the heading would have been too great for his tractive powers.

He set out on his dangerous expedition armed with a short crowbar, and groped his way in darkness over the débris—skips, tools, lumps of rock—until within 100 feet of the door, when the weight of hose prevented farther progress, and he was obliged to retrace his steps. Two days afterwards Lambert made a second attempt, wearing a Fleuss dress—which replaces the air-hose connection by a cylinder of oxygen carried on the diver’s back—but remained under water only half-an-hour. A third attempt was more successful ; Lambert reached the door, but did not close it. The fourth trial, which lasted eighty minutes, resulted in the closing of the door and sluices. With great anxiety the floats that told the level were watched after pumping recommenced, but to the disappointment of all the subsidence amounted at the most to

Longitudinal section of the Severn Tunnel, with a straight tunnel line between river levels, a dotted salmon pool, and a vertical scale beside it.
LONGITUDINAL SECTION OF THE SEVERN TUNNEL
Section of the Severn Tunnel, with a straight tunnel line between river levels, a dotted salmon pool, and a horizontal scale beside it.
SECTION OF THE SEVERN TUNNEL

The Severn Tunnel

3 inches an hour, and at high tide to nothing at all. By the 7th December, however, the use of additional pumps had cleared the Iron Pit, and the foreman was able to reach the cross-wall to which Lambert had made his venturesome and perilous expedition. It was then discovered that the screw-down valve traversing the wall had a left-handed screw, so that Lambert, while closing it down, as he thought, was in reality opening it to its full extent. But for this mechanical vagary the work of pumping would have been a simple matter after the door was closed.

The next thing to do was to tackle the western heading into which the Great Spring had burst. The door in the shield at its pit end being opened, the engineers explored the scene of the inrush. A great quantity of matter had been washed in by the water, partially blocking the heading, and it was therefore decided to keep out the water by building a wall across the heading at a point where the ground appeared firm. This work reached completion in January 1881. For two years the Spring gave no more trouble.