The romance of modern engineering, containing interesting descriptions in non-technical language of the Nile dam, the Panama canal, the Tower bridge, the Brooklyn bridge, the Trans-Siberian railway, the Niagara Falls power co., Bermuda floating dock, etc., etc.;
For removing the clay an ingenious form of electric excavator was used on several sections of the tunneling. The machine is a dredger ladder, the working end of which can be moved vertically, horizontally, and longitudinally. Thirty-seven buckets on an endless chain scrape the working face, and carry the spoil back into the small waggons that roll under the rear end of the machine. It was found that this contrivance removed so much of the face that the shield could cut away the remainder, so obviating the need of hand-picking. As soon as the men came to
thoroughly understand it, the rate of advance increased rapidly, and eventually four rings were placed in the shift. With the machine only six men were required at the face ; without it, fourteen.
For clearing the stations a large shield, 22 feet 10 inches diameter, was used, driven by twenty-two hydraulic rams. The stations are 325 feet long. The iron segments are filled in with cement and lined with white glazed tiles, which materially aid the illumination of the platforms.
The tunnels as a rule run side by side, but in one or two places, e.g. at Newgate Street and Notting Hill Gate, where the roadway is narrow (and the line must keep under the road), the tunnels curve upwards and downwards until they pass one over the other.
The depth of the line varies considerably. At the Bank the metals lie 60 feet below the surface, at Oxford Circus 80 feet, at Notting Hill 92 feet. The engineers have arranged the stations on the summit of gradients, which assist the train to stop, and also to start. On leaving a station the tunnel drops at a gradient of 1 in 30 for 300 feet, and when approaching rises 1 in 60 for about 600 feet ; so that the stations stand about 10 feet above the general level of the line.
The most difficult part of the construction was at the Bank Station, where a regular network of subways cuts the existing gas and water pipes. The station space here is entirely underground, a few feet below the surface. But the station, lift-shafts, &c., were
City Railways
made without in any way disturbing the traffic overhead.
The Central London Railway was opened on July 29, 1900. It cost £3,500,000. The engineers were Sir John Fowler, Sir Benjamin Baker, and Mr Basil Mott. The need for its construction is proved by the passenger returns, which in 1901 showed 41,188,389 tickets taken. Two objections have been raised to the "Tube"—the vibration, which seriously annoys the occupants of houses on the route, and bad ventilation. The first could be largely removed by the employment of what is known as the multiple-unit system of traction, in which every car or group of two cars is furnished with its own motors, and may be cut off from the rest of the train. The displacement of the heavy pounding locomotive by motors distributed among the cars will not only lessen the vibration, but render the handling of traffic much more elastic. Trains can be lengthened or shortened according to the varying requirements of traffic at different times of day. In America the multiple-unit system is generally used on about 3000 cars, aggregating 375,000 horse power. Mr. Frank J. Sprague, whose name is so well known in connection with electrically operated rails, says :1—
"The ideal service, so far as the passenger alone is concerned, would be by single cars operated at high speeds, and following each other at the shortest pos-
1 The Engineering Magazine, October 1901.
sible intervals. The conditions of tunnel service, however, and the heavy character of the traffic at certain hours prohibit this ideal condition. So there must be, to get the most practical results, an expansion of the car into a train varying in length according to the time of day, and a lengthening of intervals to meet the requirements of operation at high speed.... Such a system readily lends itself to every condition of congested service. The similarity of equipment insures flexibility of train operation, and provides a motive power proportioned to the requirements."
Briefly put, "one car one motor" appears, as a principle, better adapted to the requirements of rapid travel between frequent stations than, "one train one locomotive." Two main steam lines, the North-Eastern and South-Western, have recognised the expediency, and placed single motor-coaches on their metals to run at short intervals between the regular train service. In course of time we shall see the Metropolitan and District Railway electrified, and also some of the suburban lines. In fact, it is not over bold to prophesy that the competition of tubes and trams will drive all local and suburban lines to the electric current, with its far greater range of train load than is possible economically with the steam locomotive. To quote Mr. Sprague again: "The electric railway has become a modern necessity, and the greatest of philanthropic agents. It is a distributor of the masses, and the most effective agent in solving the housing problems of the metropolis.
City Railways
Every minute taken from the time of transit to and from business is a minute added to the fireside and home. Every increase of speed adds to available dwelling space, increases taxable areas, augments traffic, and betters the morale of the people. The days of doubt and hesitation have long passed. Within thirteen years, in the United States alone, electricity has been adopted on more miles of street, elevated and suburban track, replacing horse, cable, and steam equipments, than there are miles of steam railway in Great Britain. It needs but a practical survey of all that has been accomplished in this connection to realise the immense benefits possible by an intelligent adoption of electric propulsion."
The Baker Street-Waterloo line, in course of construction, will be of an importance second only to that of the Central London, as it affords the much-needed link from north to south along the route between Regent's Park and Charing Cross, which is at present served only by omnibuses. The extension to the south side of the Thames will also prove most convenient. This line, which commences at Baker Street, where it picks up passengers from the St. John's Wood branch, passes along the north side of the Metropolitan to the north end of Portland Place, under which it runs to Oxford Circus. Here passengers will change on to the Central London. The line then follows Regent Street to Piccadilly Circus, and doubles down the Haymarket to the east side of Trafalgar Square, passing close to Nelson's Column ;
then under Northumberland Avenue to the Thames, beneath which it passes a little west of Charing Cross Bridge. As an engineering feat, this line has proved more difficult than the Central London, on account of the several curves and the passage of the Thames.
The first constructional work on the line was conducted from a stage built on the north of the Thames. Two vertical shafts were sunk into the bed, and from them parallel tunnels driven to meet borings working southwards from Piccadilly Circus. In spite of the curvature of the route, the tunnels met so accurately that an error could scarcely be detected. The frequency with which this feat is performed shows that tunnel-ranging has become a very exact science. As on the Central London, the gauge is standard, viz. 4 feet 8½ inches, and the tunnels have an equal diameter, 11 feet 6 inches. It is expected that the line will be opened for regular traffic in 1904. Eventually it will extend to Bishop’s Road, Paddington, and so place the Great Western Railway in direct communication with the South-Western via the West End.
Future tube railways will have a larger diameter than that of the existing systems. Expert opinion suggests 13½ feet as affording better ventilation, facilitating repairs, and minimising the effects of an accident. The Great Northern and City tube is 16 feet in diameter, to accommodate the steam railways’ ordinary rolling stock. It may be regretted that this size was not adopted as the standard for all the tubes.
City Railways
If the various companies will only work in partnership and organise the various systems into an harmonious whole, London should in a few years’ time be one of the best served cities in the world.
CHAPTER XI
THE SEVERN TUNNEL
"The Severn Tunnel, which is a little over four miles in length, is by far the most important subaqueous work yet accomplished."—Mr. J. E. TUIT in "The Tower Bridge."
In the West of England the broad Severn estuary offers a serious obstruction to traffic between South Wales and the south-west counties—Cornwall, Devon, Somerset, and Dorset. At Weston-super-Mare the channel, still several miles broad, makes a sudden turn in a north-east direction to a point some distance beyond Gloucester, thus forming a natural obstacle on the southerly flank of Wales across the main roads from the thickly-populated coal-fields of Wales to the great Metropolis. Thomas Telford, a hundred years ago, linked up the turnpike road at Gloucester by a bridge of 150 feet span, so that coaches might travel unimpeded; and in 1879 was completed an iron bridge three-quarters of a mile long, which crosses the Severn 26 miles below Gloucester, enabling the Midland line to Bristol to tap the coal-fields of the Forest of Dean, and putting the Great Western also in more direct communication with the same district.
Owing to the configuration of the country in the Stroud Valley, the branch of the Great Western that
The Severn Tunnel
passes through it towards Gloucester is characterised by very severe gradients and sharp curves, that detract seriously from speed while adding considerably to the cost of haulage.
To avoid this route became the policy of the enterprising Directors of the Great Western. They constructed a single line from Bristol to New Passage, a point a few miles above Portishead and the Avonmouth Docks. On the opposite bank the South Wales Railway terminated near Portskewett, a small agricultural parish. On each bank a large jetty was thrown out, and a steam-ferry supplied a means of transporting goods and passengers across the Severn. This, however, was far from satisfactory. The Severn, by presenting a funnel-shaped cul-de-sac to the strong tide running in from the Atlantic, is subjected at spring tides to a rise of 50 feet, rivalling in height that of the Bay of Fundy, and surpassing anything to be witnessed elsewhere in England or on the Continent. The strong currents resulting from the sudden rise and fall of the river produce a continual shifting of the sandbanks most prejudicial to navigation, and render the embarkation at pierheads a troublesome proceeding.
The Great Western Directors therefore thought it would be to the Company’s interests to incur a further expense to avoid “breaking bulk” and transhipping passengers. The bold project was set on foot of driving a tunnel under the bed of the Severn, from New Passage to Portskewett, where the river is more
than 2 miles wide. The lowest point of the tunnel must necessarily be under the deepest part of the channel, and unfortunately that point was within a few furlongs of the Welsh bank, where the currents have eaten out a depression known as "The Shoots" to a depth of some 50 feet below the general level of the bed. So that though the New Passage end of the tunnel would be only 700 yards from the river edge, the Portskewett face would be 1 miles inland, in order to preserve an easy gradient of 1 in 100 ; and at each end it would be necessary to make large cuttings of a maximum depth of 80 to 90 feet—the tunnel itself to have a total length of 4 miles.