All public Sources
Public document

The romance of modern engineering, containing interesting descriptions in non-technical language of the Nile dam, the Panama canal, the Tower bridge, the Brooklyn bridge, the Trans-Siberian railway, the Niagara Falls power co., Bermuda floating dock, etc., etc.;

PDF document456 original pagesAdded to Pandi 6 November 2026
AskTalkView media
Reading progressPage 15 of 52

"On Jubilee night (21st June 1887), although the atmosphere was somewhat thick, sixty-eight bonfires could be counted at one time on the surrounding hills and isolated points, while the great masses of the central towers of the Bridge, lighted up by hundreds of arc-lights at various heights where work was carried on, formed, with their long-drawn reflections in the waters of the Firth, three pillars of fire, and afforded a truly wonderful and unique spectacle."

CHAPTER V

THE TOWER BRIDGE

Less imposing as a structure than the giant conqueror of the Forth is the new bridge that spans the Thames, a short distance east of the Tower of London, from which it derives its name.

The Tower Bridge is, however, of such importance and interest, both on account of the problems that it has solved, and from the manner in which it has solved them, that this great framework of metal and masonry, so familiar to the Londoner, deserves inclusion among the chief engineering feats of modern times.

The general outlines of the Bridge, being so well known, need little detailed description. Technically, it is a three-span bridge, the two outside spans of the suspension type carried on stout chains that pass at their landward ends over abutment towers of moderate height to anchorages in the shore, and at their river ends over very lofty towers, themselves connected at an elevation of 143 feet above high-water level. Extremely powerful ties, borne on the connecting girders, unite the two pairs of chains, making the suspension spans to support one another in a horizontal direction.

The Tower Bridge

The central span has two footways and one roadway. The high-level girders bear the upper footway, reached by two hydraulic lifts situated in each of the main towers.

The most notable feature of the Bridge, unless we except the unique combination of steel and masonry work in the towers, is the method of enabling traffic, pedestrian and vehicular, to cross the 200-foot space between the towers, at the level of the roadway of the two outer spans.

History repeats itself in engineering as elsewhere, and, as an example, we see here a reversion to the idea of the drawbridge that shut off the mediaeval fortress or town from the hostility of the outside world. Principle apart, however, it is a far cry from the wooden platform, heaved laboriously aloft by creaking chains, to the massive 1200-ton steel leaf raised noiselessly by the unseen energy of hydraulic engines.

Before entering into details of construction, it will be interesting to glance for a moment at the antecedents of this latest-born of Thames bridges—the reason for its erection, and the considerations that cast it into its present form.

Let the reader take a map of London and fix his eye on Blackfriars Bridge. A line drawn due north and south through the bridge would approximately bisect the metropolis. A steamboat travelling westwards from this point passes in succession under Waterloo, Westminster, Lambeth, Vauxhall, Chelsea,

Romance of Modern Engineering

Albert, Battersea, Wandsworth, and Putney Bridges — nine in all — open to vehicular traffic. On an eastward journey of equal length it would, however, have to lower its funnel for but two — the Southwark and London — assuming the Tower Bridge to be still in the future. Yet both banks are thronged by some of the most densely-populated districts of London, so near each other and yet so far for want of means of communication.

A further reference to the map shows us why things should be so. This is a region of docks and wharves, the latter reaching up to London Bridge, from which we have often watched the unloading of cargoes.

The engineer, called in to effect a compromise between the crying needs of road traffic on the one hand and the equally important interests of river traffic on the other, is able to suggest several methods of cutting the Gordian knot :

  1. A low-level bridge, with an opening for vessels through it.
  2. A high-level bridge, with inclined road approaches.
  3. A high-level bridge, with hydraulic lifts at each end.
  4. A tunnel under the river, with inclined approaches.
  5. A tunnel with hydraulic lifts at each end.
  6. A ferry.

Of these the first would be most convenient for the landsman, but most inconvenient for the sailor. The

second and fourth necessitate very costly approaches, the third and fifth continual blocks in the traffic ; and as regards ferries, they are at best but very poor substitutes for a bridge.

Among the many plans submitted since 1867 for a bridge, one is particularly noticeable for its originality —that of Mr. C. Barclay Bruce. He proposed a rolling bridge, to consist of a platform 300 feet long and 100 wide, which should be propelled from shore to shore over rollers placed at the top of a series of piers 100 feet apart. The platform would have a bearing at two points at least, and, according to the designer’s calculations, make the journey in three minutes, with a freight of 100 vehicles and 1400 passengers. Another engineer, Mr. F. T. Palmer, proposed a bridge which widened out into a circular form near each shore, enclosing a space into which a vessel might pass by the removal of one side on rollers while traffic continued on the other side. As soon as the vessel had entered the enclosure the sliding platform would be closed again, and that on the other side be opened in turn.

In 1878 Sir Joseph Bazalgette, engineer to the Metropolitan Board of Works, recommended the construction of a bridge that should give a clear headway of 65 feet above Trinity high-water level, but a Bill brought into Parliament for power to build it was thrown out on the ground that the headway would be insufficient, and on account of the awkward special approaches.

Romance of Modern Engineering

To avoid wearying the reader with a list of projects we will pass straight on to that of Mr. Horace Jones, the late City architect, who in 1878 was asked to report upon the various projects of Sir Joseph Bazalgette and make suggestions on his own account. He maintained that, as a high-level bridge would not give satisfaction, a structure of the same level as London Bridge, opening at the centre by means of hinged platforms, or bascules, might be advantageously employed. From his design has sprung that of the Tower Bridge—the joint work of him and Sir J. Wolfe Barry—which provides a central opening of 200 feet clear and a headway of 135 feet. An Act for its construction having been passed in the autumn of 1885, contracts were let for the foundations of the piers and abutment towers up to the level of 4 feet above high-water mark. On June 21, 1886, the (then) Prince of Wales laid the foundation stone.

The masonry piers on which the main towers stand are remarkable for their size—100 feet wide by 205 long—which exceeds that of any in the world, with the exception of those of the Brooklyn Bridge. The piers being but 200 feet apart, the engineers, who were under agreement to leave a clear way of 160 feet between them, could not build both simultaneously as a whole, since the scaffoldings would have narrowed the opening beyond legal limits. They therefore adopted a system of small caissons, which should be sunk so as to form a broad wall round the area of the pier, and enclose a space of

34 by 124½ feet, to be dealt with as soon as the exterior caissons were in position.

On the north and south sides of each pier four caissons were sunk, 28 feet square and 2½ feet apart, each end of the rows being joined by a triangular caisson. While one pier was in course of construction, the shoreward row of caissons for the other pier was also sunk, thus saving time without obstructing the river.

Reference has been made in the previous chapter to the sinking of caissons ; so it need here only be stated that at the Tower Bridge no pneumatic caissons were employed, but only the open variety. Divers cleared away the gravel and mud until a caisson had descended such a distance into the stiff London clay at which it was thought safe to pump out the water at low tide, and then navvies were turned in with pick and shovel. At a depth of 19 feet the caissons were undercut, i.e. the workers burrowed beneath their lower edges into the clay for a distance of 5 feet horizontally, and 7 feet vertically. The undercutting proceeded in sections —filled with concrete in succession—so that the caisson should not be left unsupported. When all the ten external caissons had been sunk and filled in, the narrow spaces between them were also filled, and the interior enclosure pumped dry and excavated. Finally, there emerged from the water a couple of gigantic piers of concrete, granite, and bricks, able to withstand without settlement a load of 70,000 tons. Their cost was £111,122.

Romance of Modern Engineering

The contract for the steelwork in the superstructure was let to Sir William Arrol & Co., of Glasgow, who, as the reader will remember, had already taken an important part in the construction of the Forth Bridge.

Before any metal-work could be placed in position, it was necessary to erect stagings from the shore abutments to the centre piers. This work occupied some months, and when it was completed operations at once commenced on the main towers.

Each tower consists of four octagonal columns, connected at a height of 60 feet above the piers by plate girders, 6 feet deep, across which are laid smaller girders to carry the first landing. Twenty-eight feet higher is the second landing, similarly constructed, and above that, at an equal distance, the third landing leading to the high-level footway. The columns each rested on massive granite slabs previously covered with three layers of specially prepared canvas to make the pressure even and the joint watertight. They were keyed to the bed-stones by great bolts built into the piers.

The first length of column plates having being riveted in position by hydraulic riveters, the second length was added by means of a crane placed on the piers, and when the crane had been raised aloft on special trestles the third length followed. The first landing served as a platform from which to build upwards in like manner to the second, which in turn became the base of operations. All four columns in

each tower were braced diagonally to resist the wind pressure—calculated at a maximum of 56 lbs. to the square inch, or several times greater than has ever been registered in that locality.

The columns finished, and the top landing girders in position, the workmen attacked the high-level footway. This was built out from both towers simultaneously on the over-hang principle. First, the portions of the cantilevers immediately over the towers were erected and anchored to the shoreward columns. Then cranes were placed on the completed portions and moved forward to add fresh plates until the cantilevers had reached the point where the central suspended girder began. As at the Forth Bridge, this was built on to the cantilever ends, to which it was attached by temporary ties, and when the centre plates had been made secure, the ties were cut, allowing it to ride free at each extremity. Throughout the construction of the upper footway the greatest care had to be observed to prevent rivets, fragments, and tools falling into the river below to the peril of passengers on passing vessels.

Along the upper boom of the footway run the great ties connecting the suspension chains at their river ends. Each of the two ties is 301 feet long, and composed of eight plates 2 feet deep and 1 inch thick, terminating in large eye-plates to take the pins uniting them to the suspension chains. The construction of these chains was one of the most interesting and at the same time most delicate parts of the

Continue reading
Page 15 of 52