The romance of modern engineering, containing interesting descriptions in non-technical language of the Nile dam, the Panama canal, the Tower bridge, the Brooklyn bridge, the Trans-Siberian railway, the Niagara Falls power co., Bermuda floating dock, etc., etc.;
Our men are two pairs of cantilevers. Between them is, let us say, an interval of two feet. This is bridged by a board of proper length resting on the upper extremities of the two inner sticks. If a third man sits on this "suspended girder," his weight causes his companions to lose their balance and fall inwards. So a couple of heavy weights are placed on the floor, immediately under the outer hands, and straps are passed from the anchorages over the hands.
The cantilevers can now withstand the weight on the central girder without losing their equilibrium. This explanation¹ made, we will return to the plans for the Forth Bridge.
On the north shore of the Forth, at North Queensferry, a somewhat triangular-shaped promontory projects southwards for a mile and a quarter into the water. At a distance of almost exactly a third of a mile south of the outermost point lies the small island of Inchgarvie, crowned by an ancient castle. Between Fife
¹ Adapted from an illustration given by Sir B. Baker in a lecture at the Royal Institution.
and Inchgarvie runs the main or north channel of the Forth, over 200 feet deep, and more generally used by shipping than the south channel, equally deep and wide, between Inchgarvie and the southern shore. There is on the south side of the south channel an expanse of shallow water 2000 feet wide.
The engineers erected three huge steel towers, each resting on four massive piers, on the extremity of the North Queensferry promontory, the western end of Inchgarvie, and in the shallow water at the south edge of the south channel. Each tower is 343 feet high from the piers to the summit of the steelwork, and a man standing on the latter would be 361 feet above high-water level. From these huge supports six cantilevers are built out, each 680 feet long. Those at the north and south ends rest on viaducts leading from the higher ground at a level of 157 feet above high water — the level of the permanent way. The other two pairs terminate while yet 350 feet apart, and these intervals are bridged by a couple of girders resting on the cantilever ends.
The bridge thus contains two enormous spans of 1710 feet each between the towers ; the vastness of which will perhaps be better comprehended if we suppose one tower to be situated in the Strand opposite Chancery Lane, a second in the same thoroughfare at the Waterloo Bridge crossing, and the third on the Trafalgar Square side of St. Martin’s Church. In height the towers would rival that of St. Paul’s Cathedral.
Romance of Modern Engineering
On the north shore the bridge is approached by a viaduct 289 feet 11 inches long, and on the south by one of 1978 feet. The total length of the structure, including the length of the towers—145, 260, and 145 feet respectively—is 8295 feet 9½ inches.
The two main spans, crossing the two channels, permit the passage at all states of the tide of vessels whose topmasts are not more than 150 feet above high-water level, for a distance of 250 feet north and south of the central line of the spans.
The three central towers—to be referred to as the Fife, Inchgarvie, and South Queensferry—each rest on four solid piers of masonry built up from a firm foundation. Viewed sideways the four vertical columns composing a tower are parallel, but when seen from the railway track a decided taper is noticeable. The “batter” of 1 in 7½, which contracts the towers from 120 feet at bottom to 33 feet at top, is maintained throughout the structure to the cantilever ends, where the height has shrunk from 330 to 34 feet, and the width from 120 to 32 feet at the bottom.
Inchgarvie tower is longer than the other two—260 feet as against 145—for reasons that will be seen immediately. The sides of the towers are strengthened by huge tubular bracings which run from the foot of one column to the top of its neighbour; and all four columns are connected together horizontally, both top and bottom, by powerful ties. In addition to these are a number
The Forth Bridge
of smaller bracings running in all directions, giving the whole structure wonderful stability.
Nature had favoured the engineers by placing Inchgarvie in mid channel, and providing firm matter on which to erect the piers. But, on the other hand, the Forth is exposed to gales, which on several days of the year blow with such fury as to prevent the passage of even paddle-steamers. The enormous pressure of a wind blowing upwards of 20 lbs. to the square foot on a structure of the size of the Forth Bridge had to be reckoned with. The tapering shape of the cantilevers towards their extremities had the effect of offering least surface to the wind where it had most leverage to twist the cantilevers about their supports; and the straddling of the columns further minimised danger from air pressure. But Messrs. Fowler & Baker thought it best to make a slight concession to the elements, by a contrivance that also provided for longitudinal expansion and contraction of the steelwork under varying temperatures.
Accordingly, one of the four columns in each tower was fixed rigidly to its pier. But the other three carried at their lower extremities bedplates moving over corresponding bedplates attached to the piers. Strong bolts passing up through slots in the upper plates allowed the latter to move slightly horizontally, some in a circular path round the fixed pier, and all in the direction of the centre line of the bridge. The two extreme cantilevers were so fixed at the viaduct
Romance of Modern Engineering
ends as to prevent side-play, but permit longitudinal expansion.
The Inchgarvie tower differs from the other two in having neither its north nor its south cantilever fixed, and both can therefore exert a twisting strain on the tower. Great care was necessary to make due provision for such movements in the attachment of the suspended girders in the middle of the two main spans. They are hung in such a manner from the cantilevers that longitudinal expansion is possible in both girders at their Inchgarvie ends through the medium of sliding blocks; while rocking-posts, or pivots, are provided at both ends to enable them to adapt themselves to any lateral sway of the cantilevers.
Inchgarvie tower, on account of its “splendid isolation,” is also at a disadvantage with regard to “live,” or train, loads. If two heavily-laden trains pass one another at the end of a cantilever they exert a great pull on the central tower, tending to lift it from its further piers. In the case of the Fife and Queensferry towers such a loss of balance is obviated by terminating the landward cantilevers in huge boxes, each containing 1000 tons of iron, and resting on the end viaduct piers. Such a provision was impossible for Inchgarvie, so the engineers increased its length by 115 feet, to give the columns further from the live weight a greater countering leverage.
It is interesting to notice as an example of the thoroughness with which all the work on the Forth
The Forth Bridge
Bridge was carried out that, as a preliminary operation, three wind gauges were erected in the summer of 1882 on the top of the old castle on Inchgarvie, and daily records taken. Two of these were fixed to face east and west, from which directions the wind would strike the bridge almost at right angles to its longitudinal axis. The third revolved, to meet winds blowing from all quarters. The largest wind-board, 15 by 20 feet, or 300 square feet in area, had cut in it two circular openings of 1½ square feet area, the one at the exact centre and the other in the right hand top corner, each containing circular plates registering pressure independently of the rest of the board. The fact that on March 31, 1886, the upper opening recorded only 22 lbs. per square foot, while the centre pressure rose as high as 28½ lbs., seems to show that great wind pressures are very unevenly distributed over a large surface. This is confirmed by the records of two additional revolving gauges set up on the central towers, where simultaneous pressures varied as much as 10 and 12 lbs. between the different piers.
The first thing to be done in the actual work of construction was to accurately fix the positions of the main circular piers. Direct measurements with tape and chain being impossible, the surveyors had recourse to triangulation. A base line, 4000 feet long, was laid on the south shore ; an observatory built ; three points taken on the centre line of the bridge ; and twenty other stations laid down as required.
Romance of Modern Engineering
Careful trigonometrical calculations were made ; but, in order that there should be a minimum of error with regard to the distances apart of the three principal stations on the centre line, the measurement of the north span of 1700 feet from the centre of the north circular pier on Inchgarvie to the south circular piers on Fife was checked in the following manner, as described by Mr. Westhofen in his account of the Forth Bridge :—1
"In a straight portion of the North British Railway a distance of 1700 feet had been carefully measured and marked and transferred to high posts at the side of the cutting. Upon these posts notched knife-edges were placed at the two extremities. A fine steel wire, about of an inch in thickness, was laid along the span and drawn over the knife edges, with a certain amount of stress put upon it, previously agreed upon. Thus drawn up, the wire left a certain amount of sag in the centre, which was carefully measured by level and noted. Two narrow copper tags were then soldered on to mark the end points. The wire was then coiled up and kept ready for use. The temperature was noted. On the two shores, immediately under the piers which marked the stations, places had been prepared for levels, by means of which the amount of sag in the wire could be fixed. On a calm, cloudy day, with the temperature about the same, the wire was taken across the north channel
1 To which account the author is greatly indebted for his information.
and laid down upon the prepared knife-edges on the piers, and with the same amount of sag allowed, the two copper tags soldered on should have coincided with the notches in the knife-edges, provided the distance was correct."
The results showed a discrepancy ; but, after the main spans were completed and measurements taken along the girder, the difference was reduced to but 1 inch in the north span and 6 inches in the south.
The amount of preparatory work to be done before building operations got into full swing was on a scale proportionate to that of the bridge itself. On the south shore the high ground was cut into terraces, and on these were erected a shop for fitting the tubular parts of the bridge ; another for the lattice-work ; a drill road ; a carpenters' shop ; a pattern shed ; and a drawing-loft, 200 feet by 60, in which, on a blackened floor, full-sized drawings and templates of various parts of the superstructure were made. By the edge of the water a sawmill was established. Houses for accommodating a small army of workmen had also to be built, and a water-supply provided. Special services of trains and steamers were organised. An efficient system of handling, storing, and transporting materials for 140,000 cubic yards of masonry and 55,000 tons of steel, besides an equal weight of temporary appliances was devised. A cable for telephonic communication between the various shops and offices at working centres crossed the bed of the Forth. And we may close a very incomplete list by