The romance of modern engineering, containing interesting descriptions in non-technical language of the Nile dam, the Panama canal, the Tower bridge, the Brooklyn bridge, the Trans-Siberian railway, the Niagara Falls power co., Bermuda floating dock, etc., etc.;
disastrous ; and it is to ensure the very gradual cutting off of the water that the cylinder mentioned above is employed. At the moment when the chain-wheels are released a small cock in a pipe leading from the cylinder is also opened, and the contents slowly escape, permitting the weight attached to the chain to pull round the pulley at a uniform speed.
The danger of a " water-hammer " on the southern or lower leg of a syphon is not so great, as the direction of the rush is the opposite of that of the normal flow. So that for an appreciable time after the burst the water is almost in a state of rest, from which it gradually attains a reverse motion. To check its downward flow check-valves are placed—three flaps, one above another, opening only in the direction of normal flow. On a burst occurring, they at once shut against their seats, and remain there until the syphon is refilled and the flow resumed.
The charging of a syphon is not so easy a matter as might be imagined. The sudden influx of a full column of water might imprison air in the lower parts, compress it, and cause it to burst suddenly up the lower leg, leaving room for a violent rush of water in its track.
An ingenious provision for the charging has therefore been made. In each of the large plugs in the syphon wells is a smaller central one, which is opened by means of a lever of U section, supported at a short distance from one end on a fulcrum which rests on the main lever between plug and float.
heavy iron ball, weighing 90 lbs., runs in the channel of the short lever. When the central valve is opened the southern end of the lever is depressed, and the ball remains there until the syphon is full, when the float rises, and by raising the main and small levers causes the ball to roll along its channel and close the central valve. The large plug is now water-tight and ready for the next emergency.
The pipes used in such works are manufactured with the greatest care, being cast vertically, socket downwards, so that the densest metal may be at the spot where there is greatest danger of fracture. Each pipe is then tested internally with coal-tar oil to an internal pressure of 45 lbs. per square inch in excess of the possible maximum exerted by the water, weighed, and its date, number, diameter, length, and thickness entered in a book ; after which it is heated in a stove and dipped in a special anti-corrosive composition. During the laying of the line the position of every pipe is registered, together with the name of the man who laid it, and the date at which it is laid. The joints are made by running in molten lead between the socket of one pipe and the spigot end of its neighbour—a process that is too familiar in most towns to need description.
The first contract for the work was let in 1885, and on October 13, 1894, the first Thirlmere water arrived in Manchester, the inhabitants of which town are now assured of a splendid supply for many years to come.
Romance of Modern Engineering
From Cumberland we turn our attention to the equally hilly district of North Central Wales, where are the head waters of the Vyrnwy, a tributary of the Severn. The valley through which the river flows was once the course of a glacier, that scraped deep channels in the rock and piled boulders and stones across the glen so as to create a natural dam, behind which a lake was formed. After many years this lake was filled in with alluvial deposit, which rose to a height of 40 to 50 feet above the rocky barrier.
Who would have thought, fifty years ago, that this natural dam would prove of the greatest utility to far-off Liverpool, situated on the edge of unlimited water and yet casting anxious eyes towards regions where there was water fit to drink? In an interesting report on the Liverpool water supply the Corporation engineer, Mr. J. Parry, tells us how in 1865 a scarcity of water during the summer and autumn produced disastrous results. "The consumption was restricted in every way; trade was impeded, sanitary requirements were neglected, public baths and wash-houses were closed, and the death-rate from diseases caused and aggravated by a deficiency of water became abnormally high. The Medical Officer of Health for the Borough, the late Dr. Trench, in evidence before a Committee of the House of Commons, stated that hundreds of lives would have been saved during that season if there had been an increased supply of water."
As a result, great works were commenced in 1868 at
Dams and Aqueducts
Rivington, in the Yarrow valley, where there are now eight reservoirs of 598 acres surface and a capacity of over 4000 million gallons, connected with Liverpool by a pipe line 153 miles long, terminating at the Prescot Reservoirs. These works cost the Corporation 1½ million pounds.
But they did not suffice ; and in 1878 Mr. G. F. Deacon, M.I.C.E., was instructed to survey the Vyrnwy valley and prepare Parliamentary plans, in conjunction with Mr. Thomas Hawksley, for the creation of a second supply.
The necessary Act received the royal assent in 1880.
As no lake existed from which to draw, the engineers decided to create one by closing the valley with a dam superimposed on the rocky ledge left by glacial action. The dam, which rises 85 feet above the river-bed, is 1172 feet long, 161 feet high (maximum), 127 feet thick at the base (maximum), and contains 260,000 cubic yards of masonry, weighing 510,000 tons.
“ Below the sill of the dam and above the outlet to the aqueduct, Lake Vyrnwy contains 12,131 million gallons. Its area is 1121 acres. In a single foot of depth immediately below the overflow, the lake contains about 304 million gallons ; 5 feet lower a foot of depth contains 292 million gallons. . . . The average cross-section of this remarkable sheet of water does not differ widely from a horizontal base 2000 feet wide, with a depth of water over it of 70 feet, and end slopes 2½ to 1.” 1
1 Mr. G. F. Deacon. Minutes of Proceedings of the Institution of Civil Engineers.
Romance of Modern Engineering
This lake covers the site of the village of Llanwddn, with its forty cottages, church, school, and three chapels. By way of compensation, a new village, church and churchyard were built below the dam, and thither were removed the living and the dead.
The living have gained rather than lost by the move; new and better houses to live in, a well-regulated river, no longer subject to sudden spates, flowing past their doors, a fine carriage-way across the valley over the dam, and finally the dam itself, a noble and imposing structure on which the eye may rest with admiration, especially at times when the water passing over the top in an unbroken sheet 700 feet wide, thunders down on to the masonry below.
Except for the stone and sand all the materials used in the Vyrnwy dam—such as cement, bricks, timber, iron, machinery, plant, coal, &c.—had to be carted over ten miles of hilly country from the nearest Cambrian railway station of Llanfyllin.
The masonry throughout was executed with the most scrupulous care, since the sudden breaking loose of such a body of water as Lake Vyrnwy into the valley of the Severn, with its large towns, would be terrible to contemplate.
A great trench was first dug across the valley down to hard, sound rock. Boulders ranging up to hundreds of tons in weight were met with and removed; all long slopes in the sound rock were cut into steps; and the whole surface was scrupulously cleaned with
wire brushes and high-pressure water jets, and coated with Portland cement mortar. The interior rubble-work of the dam consisted mainly of large stones 2 to 10 tons in weight, laid by cranes on to carefully levelled beds of cement mortar. As each stone was placed, a number of men beat upon its centre with wooden mallets until it had settled down well, and squeezed up some of the mortar between it and the next stones. The interstices were very carefully filled and rammed with different-sized tools—blunt-ended swords for the narrowest cracks—and the precaution taken of only half-filling the vertical spaces between the last layer of masonry at the end of each day's work. During the nights, Sundays and holidays, these half-filled cracks were crammed tight with bags to exclude rain, frost, and sunshine. By this means the perfect junction of the work was assured.
The facing stones—cut to rectangular form—were bedded in like manner, but the mortar not brought to the outer edge. Cracks 6 inches deep from the face at the bottom, and 3 inches at the top were left and filled in with iron plates until the mortar had set. The cracks were then caulked to within an inch of the face with special cement, very carefully rammed. The result is a face that will suffer a minimum of disturbance from the contractions and expansions of cold and heat.
The dam is pierced by two culverts carrying pipes for the discharge of the daily 10 million gallons and the monthly 160 million gallons of compensation water.
Romance of Modern Engineering
This discharge has entailed an expenditure of £300,000, and except in the Vyrnwy stream itself—where its importance is small—its effect is trifling, and a concession rather to official pressure than to public needs.
About three quarters of a mile from the south-east end of the lake there rises from the water an ornamental tower connected with the public road—constructed by the Corporation at considerable expense along the north-east side of the lake—by four masonry arches. This tower is 170 feet high, and stands out 60 feet above top-water level.
On the outside of the tower are two inlet valves, each made up of six 9-foot tubes superimposed vertically on one another, end to end. By means of internal guides and a system of catches, it is possible to separate any number of these pipes from the pipes below, so as to permit the inflow of the water at any one of six different levels. The lowest joint is connected by a U-shaped bend with a similar series of tubes, working on the same principle, in the interior of the tower. This enables the man in charge to draw water from the surface, where it is purest, and introduce it into the tower in a state of approximate quiescence. The floor of the interior is pierced by three vertical bell-mouths communicating with as many 46-inch pipes leading to the aqueduct, each of which can be closed by a throttle-valve. Over the bell-mouths are cylindrical strainers, 9 feet in diameter and 25 feet high, of very fine copper gauze. As soon
as a strainer shows signs of fouling it is raised by hydraulic pressure, and cleansed by a washing turbine that removes all clogging matter from the gauze in a few minutes.