The Railway Conquest of the World
The line hugs the hill-sides, and has to make the rough descent of the broken Hollenburger in order to gain the level of the Drave River, to pass between the Stattnitz on the northern and the Karawanken chains on the southern side of the depression. The mountain-side is steep and broken in the extreme. In all directions gullies extended, where the soft earth had been washed away by the violence of the snow freshets. These had to be filled in with solid, heavy embankments, the debris for which was torn from deep cuttings through projecting humps of rock. Some of the gaps were too wide and deep to be overcome in this summary manner, and had to be bridged. The Hollenburger viaduct stands out prominently among works of this kind. From end to end it measures 262½ feet in length, and in the centre the rift is 92 feet below the level of the rails. The mountains sheer up precipitously on the one, and the beautiful valley of the Rosenbach falls away on the other, side of the track.
Gaining the river-bank, the line sweeps across the waterway by a majestic lofty iron bridge 656 feet in length. Gaining the opposite bank, it plunges among the well-wooded slopes of the Karawanken belt of mountains, effecting a good climb up and down towards the Rosenbach valley, which is crossed by means of a long viaduct, consisting of four arched masonry spans each 24 feet and three steel spans of 177 feet apiece, at a height of 170 feet.
The ascent is heavy, as the objective is the northern entrance to the Karawanken tunnel, which burrows through the range for a distance of five miles. The piercing of this subterranean passage excited considerable attention. The Austrian engineers who had achieved such a triumph in the rapid boring of the Arlberg upheld their reputation as accomplished masters in this phase of railway-building, notwithstanding the fact that the rocky mass was found to be of such unstable character that the tunnel had to be lined from end to end.
The task was taken in hand shortly after the Austrian Government sanctioned these railways in 1901. Boring was carried out simultaneously from each end. The ground around each portal was quickly cleared, and when the work was in full swing 6000 men found employment. The first step was to secure power to furnish the energy to operate the variety of mechanical appliances that were necessary to dislodge and transport the rock, as well as to dispel the Cimmerian gloom in the heart of the mountain. There was a small waterfall six miles from the proposed southern mouth of the tunnel, with a drop of 35 feet, and capable of furnishing some 900 horse-power. This picturesque Alpine cascade was harnessed and compelled to drive turbines and dynamos to generate electricity, which was transmitted by overhead wires for six miles to the boring works at the tunnel entrance. Here the current was pressed into a multitude of services, not the least important of which was the driving of the huge fans, whereby a great volume of clean, pure, cool air was swept in a steady stream through the shaft to strike against the wall of rock upon which the drillers were concentrating their energies, displacing the atmosphere contaminated by the fumes of the dynamite blasting, grime and dust. Moreover, the temperature, which rapidly rose as the heart of the mountain was penetrated, was tempered pleasantly by the incoming currents, so that the fatigue of toiling in the blackness and confined space was reduced.
THE TAUERN RAILWAY, SHOWING WINDING CHARACTER OF THE LINE
THE ENTRANCE TO THE TAUERN TUNNEL,
Five and a quarter miles in length, which occupied five years to bore through the range
RAILWAY BUILDING IN THE TYROL
On the northern side of the tunnel similar arrangements were laid down. In this instance, however, the electricity, obtained by harnessing two small waterfalls, had to operate wonderful electric drills which were used at this end for boring into the rock—on the southern side hydraulic and pneumatic drills were employed. The working face in the tunnel was illuminated brilliantly by electric light, so that the drillers laboured under conditions vastly dissimilar to those which prevailed when the first Alpine tunnel was driven. As the top of the tunnel was cut out the roof was shored up with heavy timbering, and hard on the tracks of the excavators came the stonemasons, cutting, trimming, and setting the masonry lining into position. The work was so planned that the actual progress per day should be thirteen lineal feet, and although at times the calculations were somewhat upset by something unforeseen being encountered, yet, taken on the whole, the average was well maintained. Commenced in June 1902, the mountain chain was pierced and ready for the double line of rails by November 1905, so that the work had been carried out very smartly indeed.
ONE OF THE HUGE LOOPS ON THE TAUERN RAILWAY
Showing heavy character of earth cutting and masonry work.
Emerging from the tunnel, the line once more becomes a single track, and issues into the Wurzner Save valley, the descent continuing until Assling, the terminus of the Karawanken railway, is reached, this point being 151 feet below the southern mouth of the tunnel. Here a connection is formed with the next link in the chain, this being the “Wochenier” section, which runs to the shores of the Adriatic at Trieste.
But before the latter terminal is gained another mountain mass has to be penetrated—the Julian Alps. It is a meandering line in very truth, for the configuration of the country prevented more than short pieces of straight track being sandwiched here and there between sweeping curves, elaborate winds, stiff ascents and descents—in fact, the longest piece of straight line is only of 6,600 feet in the first 55 miles. In running from Assling to the seaboard 28 tunnels are threaded, exclusive of the Wochenier, which is 4 miles long, 15 bridges and 30 viaducts are crossed, while the cuttings and embankments are innumerable. The railway traverses some of the most romantic and wildest scenery in the whole Alpine chain, especially as it approaches the southernmost clump of these mountains.
On this section the engineers accomplished an unparalleled engineering feat. The narrow Isonzo gorge had to be crossed, and it was effected by throwing a single span from one bank to the other, a matter of 733 feet. This is the longest single-arch masonry bridge in the world, and the rail-level is 120 feet above the level of the water. As the coast is approached the windings of the line become more tortuous, while the bridging, owing to the numerous rivers, is terrific. When at last Opcina tunnel is penetrated, the Adriatic is seen spread out in a vast panorama 1000 feet below.
To descend the mountain slopes with an easy grade for a distance of ten miles was a stiff problem. In order to do so the engineers had to carry the track in the form of elaborate saw-like loops. Heavy gradients could not be avoided, and this part of the line is one of the steepest and most trying to the locomotives.
Though these sections of the railway had proved difficult to carry out, it was the Tauern link in the chain that tried the energy and ingenuity of the engineers to the supreme degree, for on this stretch of railway the mighty Tauern group of mountains had to be negotiated. Surveys showed that to pierce this clump involved the boring of a tunnel for a distance of five miles at least. They proved the hardest five miles in the whole undertaking; the piercing of the Karawanken and Wochenier tunnels sank into insignificance by comparison, for this knot of the Alps was found to be formed of much sterner rock. Granite gneiss, one of the hardest substances against which it is possible to bring the edge of a drill, made progress provokingly slow. At times, when the hand drills had to be used, an advance of two feet in the course of twenty-four hours was considered excellent. The Brandt hydraulic drills, however, with the enormous energy behind them, made the task somewhat lighter, for they moved through the hardest rock at a rate of about seventeen feet every day, with occasional spurts of a foot per hour.
In this undertaking, however, many misfortunes served to delay progress. The task had barely commenced, when a flood destroyed part of the works at the northern end. The river whose water had been harnessed had been deviated from its accustomed path, because it flowed over the roof of the tunnel. As the engineers had no desire to invite an inundation by tapping the bed of the river waterway, they had provided it with a new channel. Heavy snows and rains, however, so swelled the volume of the diverted river that it broke through its artificial bonds to resume its original course. The result was that, owing to the crust of earth between the old bed and the roof of the tunnel being so thin, the water crashed through, and poured into the tunnel in an immense cascade.
The men abandoned everything hurriedly, and rushed madly for their lives from the incoming avalanche of water. For days the tunnel was absolutely inaccessible. Not content with flooding the workings, the impetuous torrent completed its devastation by sweeping away many of the supports to the line conveying the water to the drills under a pressure of 1,500 pounds per square inch, leaving the slender conduit of this great force hanging in graceful festoons in mid-air. Some of these gaps were as much as 260 feet in width, and had a break in the pipe occurred widespread damage would have been caused. But the engineers set to work, and reconstructed the temporary dam that had thus been torn roughly away and rebuilt the river’s new channel. At the same time they adopted such precautions as would preclude the possibility of the waterway again inundating the tunnel in times of the most severe floods.
Such incidents, however, are inherent to works of this character. The inundation was but one means adopted by Nature to thwart the advance of the iron road. Work had scarcely been resumed, when another disaster occurred. The drills were whirring merrily against the rock face in the tunnel, and the drillers were light-heartedly conversing with one another as they fed the boring giant in its rock-penetrating task. Suddenly there was a cry of alarm. Water was trickling rapidly from a bore-hole; it rapidly increased in volume. The drillers hurriedly withdrew their tools and backed down the cavern. There was a roar, and a limpid stream burst from the rock face. The drillers stampeded; they had tapped a subterranean spring, and it was now rushing forth with fiendish violence. The engineers hastened to the front. Such a contingency had been expected, for such incidents are inseparable from tunnelling tasks of this magnitude. The rushing stream was turned into one of the conduits at the side to carry it to the tunnel mouth, where it expended its energy harmlessly by tumbling wildly among the rocks. When pockets of water and springs are tapped in this manner, the question is to control the water so encountered in such a manner that it does not interfere with the drilling work or flood the workings. As a matter of fact, when the Simplon tunnel was in progress these underground springs were harnessed and compelled to perform useful work; they were thrown against the rock face to keep down the internal temperature.