The Railway Conquest of the World
In these upper reaches the trains play a gigantic game of hide-and-seek, darting in and out among the labyrinth of tunnels. In a distance of 50 miles he had to drive his path through no less than 57 of these obstructions, while altogether there are 65 tunnels in the 138 miles of the railway’s length. The line doubles and redoubles upon itself in the most bewildering manner in order to gain points on the mountain-sides. In the course of 11 miles between Matucana and Tamboraque this scaling by means of the zigzag was exceedingly heavy. Standing at the latter station and looking down, one can see tier after tier of the gleaming metals, until they are lost to sight far below.
THE FIRST VERRUGAS VIADUCT, WHICH WAS DESTROYED BY A CLOUDBURST AND ROCK-SLIDE
Men died like flies while building this bridge, owing to the outbreak of an obscure disease known as “Verrugas fever.”
Five miles beyond Tamboraque another remarkable achievement had to be accomplished. The line tunnels a peak, to emerge upon the brink of a drop into the river below as straight as a brick wall. On the opposite side is another towering pinnacle. To span the gulf a heavy bridge was necessary. It is called Infiernillo Bridge, and never was a name more fittingly bestowed. Its erection by false work or scaffolding was out of the question, as in this region not a tree exists. It had to be built out from the sides, the men being suspended in cradles and loops dangling from ropes attached to brackets driven into the solid rock above. The builders found swinging the tools from such crazy footholds to be perilous in the extreme, but there were no other means by which the bridge could be erected. It is a frail link between two dark yawning mouths in opposite towering crests, and the traveller as he rattles across scarcely can quell a shudder.
THE HIGHEST TUNNEL IN THE WORLD UNDER CONSTRUCTION
The Galera tunnel, 3,855 feet in length and 15,665 feet above the level of the Pacific Ocean, on the Oroya railway.
So energetically did Meiggs pursue his self-appointed task that in six years he had carried the line 88½ miles into the Andes, and had gained an altitude of 12,215½ feet. All the men that he could possibly procure were pressed into service; at one time the railway gave employment to 8000 labourers. The amount of blasting necessary to prepare the road-bed for this single line of standard track was enormous, something like 500,000 pounds of explosives being used every month. The strain inseparable from such an enterprise told its tale at last upon the bold engineer, whose iron constitution could not withstand the anxieties and worries of the Verrugas fever, and the exposure to a rarefied atmosphere, without receiving an indelible mark. The first signs of a complete breakdown appeared as the railway was approaching Chicla, and when this point was gained in 1877 he succumbed.
The removal of the guiding spirit brought the whole undertaking to a stop. Meiggs had completed two-thirds of the undertaking, and had broken the back of the difficulties. For fourteen years not another foot of line was graded. At last the Peruvian Corporation of London, which had taken over the railway, settled a contract for its completion with William Thorndike, who also hailed from Philadelphia.
The new engineer carried the line a further 3,450 feet above the sea, following the surveys of Meiggs, and then became confronted with his greatest obstacle—the piercing of the summit crest. Thorndike had to hew his way through the bosom of a pinnacle for over 3,855 feet at an altitude at which such work never had been attempted before. The trying character of the situation was augmented by the rarity of the atmosphere, and the fact that he had to force his way through the region of the terrible mountain sickness, with a low prevailing temperature such as is encountered in the region of eternal snow and ice. Such conditions retarded the boring of the Galera tunnel, as it is called, more than the stern resistance of the rock. The workmen invariably fell victims to the sickness, though the undertaking was not accompanied with the heavy mortality that characterised the building of the Verrugas bridge far below. Mountain drilling, blasting, excavating, and the removal of the heavy spoil proved exacting and fatiguing, and a man could work only for a few hours at a stretch. By skilful organisation and careful husbanding of his forces, however, the engineer succeeded in forcing the metal track through the mountain at record speed.
The Galera tunnel is the crowning point of a magnificent achievement. In the centre you stand on the Great Divide of the South Americas, nearly 16,000 feet above the ocean. When a bucket of water is upset, one half of the liquid runs eastward towards the Atlantic, while the other flows westward to the Pacific. Oroya is 31½ miles distant from the eastern portal of the tunnel on the great inland plateau of the continent, and only a little less than 3,500 feet below it. On this section construction was very rapid, as there were no untoward difficulties to be overcome.
A BRITISH LOCOMOTIVE IN THE REALM OF PERPETUAL ANDEAN SNOW, 15,865 FEET ABOVE SEA-LEVEL, ON THE OROYA RAILWAY
About the same time as the Oroya railway was commenced another great line was undertaken some miles to the south. In this instance the port of Mollendo was the Pacific terminus, the inland objective being Puno, on the shores of Lake Titicaca, that remarkable inland sea nestling among the crests of the Alps some 14,660 feet above the Pacific. The total length of this line is 332 miles, and it divides with the Antofagasta railway to the south the traffic between La Paz and the seaboard. Though it does not compare with the Oroya or Central railway of Peru as an engineering achievement, yet it possesses certain individual characteristics, the tumbled mountain country experienced farther north giving way to open expanses of bleak, dismal desert.
LOOKING THROUGH THE TUNNELS ON THE OROYA RAILWAY
An exhilarating coast at 45 miles an hour for 107 miles can be made from Galera tunnel to Callao upon the small hand-car shown in the photograph.
This line in its ascent of the Andes skirts the base of that most majestic of mountains, the smoking El Misti, whose snow-topped crater rises like a grim sentinel far above the other visible points of the mountain chain. Here the mountains are nobler and wider apart, so that one can grasp better their magnificent proportions, while their flanks are not so scarred, and there is an absence of those fearsome, yawning ravines. In making the ascent the line describes broad sweeping curves to avoid projecting peaks, and throughout the whole distance there is a notable relief from the zigzags and switches so frequent on the sister line.
On this road, however, the moving sand threatened to be an implacable enemy. In the higher altitudes the sand is piled up into quaint little cones ranging from ten to twenty feet in height, and from the distance their incalculable number and regular lines present the appearance of a vast army of men grimed and covered with the dust, which illusion becomes emphasised when they are seen moving across the plains in a steady, rhythmic manner under the influence of the wind. When the railway was built it was anticipated that elaborate precautions would be requisite to keep the track clear of this encumbrance, but it was found that the trains could plough their way through the mass with little difficulty.
In the higher levels the sand gives way to a country of broken rock—a land absolutely void of any sign of life. This monotonous waste continues to the shores of the lake, where the dank water-grass and limpid water offer a welcome relief to the aridity experienced for so many hours. This railway was constructed with remarkable rapidity for the Land of Paradoxes, as the whole 332 miles were built in five years, and thus the isolated waters of Titicaca were linked with the Pacific by the iron road.
Not only was this railway much cheaper to construct than the Central or Oroya line, but its maintenance is not so harassing as the former system. The engineers of the Oroya road are engaged in a constant war with the elements. The landslide is the most relentless foe that has to be combated. A big slip on a slope, an avalanche of snow, huge boulders, and miscellaneous debris rattle down the mountain-sides with terrific fury, blotting out the track and sweeping bridges away in their mad career.
The Verrugas bridge was dogged by ill-fortune after its completion, for in one of these visitations the whole structure was demolished through the main central pier being knocked away. The tangled and twisted metal was left rusting in the ravine, for the bridge-builders’ art had advanced considerably since the old bridge was designed, and in reconstruction it was found possible to span the gorge on the cantilever principle without the central support. All the other bridges on the railway are being rebuilt gradually on these lines, and when this task is completed the engineer will have one danger the less to fear—the collapse of the slender link of communication across the gulches.
One can enjoy a most exhilarating experience on this railway. This is the descent from Galera tunnel to Callao on a small hand-car. It is a glorious coast downhill for no less than 107 miles. One rushes down inclines, swings round curves, threads tunnels, and whisks across gorges at the exhilarating speed of 45 miles an hour. It is a unique sensation—one of the many marvels associated with this remarkable railway, which is not merely a striking evidence of civilisation, but a perpetual monument to the 7000 lives devoted to its construction.
CHAPTER XI CECIL RHODES’ DREAM—FROM THE CAPE TO CAIRO I.—Northwards from Cape Town
Few phrases have become so familiar to the ear as from the “Cape to Cairo.” It is a phrase that has made history, though perhaps not so rapidly as its creator anticipated. When Cecil Rhodes first cast his eyes from north to south, and conceived the idea of binding the two extreme points of the African continent together, there is no indication that he experienced great difficulty in finding a title for his undertaking. There was Cairo in the north, and Cape Town in the south. He aspired to join the two by rail. Consequently, from the “Cape to Cairo” was obvious. Probably the alliteration caught his fancy, and conveyed his complete thought so forcibly in three words, and in a manner that could not fail to impress the public, that it inadvertently flew through his mind.
When the materialisation of this vision commenced, the general knowledge of the interior of the continent had not been widened very appreciably since the travels of Livingstone and Stanley. It was “Dark” in the truest sense of the word, and conquest either by the mysteries of peace or the arts of war was necessary before the steel rail could be driven either northward or southward. However, it was determined to carry the idea to fulfilment—the question of the penetration of the hostile country could be taken in hand when the railway was within measurable distance of its borders so far as Rhodes was concerned, while in the north the English Government had decided to settle terms with the Mahdi.