They had just got the plant going when a wind sprang up and prevented the boats, specially acquired to transport the water from the station to the nearest point on the railway, from approaching within a mile or so of the shore. Hurried arrangements had to be made to draw temporary supplies from Miami once more. A week or two later the wind veered round and blew just as furiously in the opposite direction, with the same result. This experience sufficed to prove that no reliance could be placed upon the new water station, so it was abandoned.

Similarly, all the broken rock for the concrete had to be brought from the quarries at Miami, and with the cement was stacked in huge heaps at Knight’s Key, which constituted the supply depot. The scattered situations of some of the constructional gangs taxed the efforts of the commissariat to a straining-point. In many cases the supply boats, in order to get to their destination, only perhaps a mile distant as the bird flies, had to follow a circuitous route of eight or ten miles to get there.

When it was seen that Mr. Flagler was serious in his intentions, and that the first stretch of viaduct was completed successfully, it was maintained that “Flagler’s Folly,” though a wonder of engineering, never could hope to pay its way. Time alone can prove or disprove this contention, but it is worth while to observe that, as each section of the line has been completed, strenuous efforts to develop the country penetrated thereby have been made. The Florida East Coast railway serves an essentially pleasure country—the Riviera of America. Yet, as the line plunged southwards, hotels sprang up at various sylvan spots, and they rapidly assumed positions of importance. The only barren stretch is the Everglades. The commercial conquest of this useless expanse must come later inevitably, and indeed energetic measures to this end are in active progress.


CHAPTER XX THE LAND OF REMARKABLE RAILWAY BRIDGES

In order to describe fully the complete conquest which the iron horse has accomplished in British India, volumes would be required. In that country the steel highway has been driven forward in the face of prodigious difficulties of every description; the story is an exciting romance.

But the features which impress the traveller most strongly are the bridges. Some compel more than passing interest because of their great length, such as the Sone bridge, on the East Indian railway, which consists of 93 spans, giving the structure a total length of 10,952 feet, making it one of the longest bridges in the world; or the Godavari over the river of the same name on the Madras North-East line, 9,066 feet in length; others because of their height, as, for instance, the Gokteik Viaduct in Burma, 325 feet high; or the Dhorabhave Viaduct, 178 feet above the stream; while here and there attention is challenged because of the massive proportions of the structure or its unusual design, as, for instance, the Jubilee Bridge across the river Hooghly at Naihati, or the Lansdowne Bridge across the Indus at Sukkur, the main span of which is 790 feet clear.

It may be safe to assert that no country has offered the bridge-builder such striking opportunities to display his ability or enterprise as the Indian Empire. The Americans point to the great width of their waterways, and the huge structures which leap across the Mississippi, Missouri or Columbia rivers, but, compared beside the erections which carry the railway across the Indian waterways, they appear puny.

The Indian rivers are famous for their great width, and the extent to which they break up the country through which they make their tortuous ways to the sea. The result is that when the engineer is called upon to cross from bank to bank, especially in connection with the more important waterways, he is faced with some teasing and complex problems, to solve which demands often considerable ingenuity and the expenditure of much racking cogitation. These rivers are bad friends to the engineer at the best of times, but when lashed into fury and swelled to flood they almost defy mastery.

The flood is the bugbear of the bridge-builder. One never knows what the enraged water is going to do next. Sir Bradford Leslie, K.C.I.E., M.INST.C.E., who probably has been associated with more great engineering achievements of this character in India than any other living engineer, can recall thrilling moments innumerable. For instance, when he was carrying the Jubilee Bridge across the river Hooghly, the water carried away one of the caissons which he was about to launch for one of the piers. He thought it had been lashed safely into position by means of chains, preparatory to sinking, but the Hooghly “bore” quickly undeceived him. The Hooghly bore is an ugly customer, for at times it attains a height of 7 feet, and travels up-stream for 70 miles in four hours. This rapidly-moving bank of liquid struck the unlucky caisson, although the latter was of respectable dimensions and weight, snapped the mooring chains as if they were pack-thread, and carried the cylinder away as if it were a small butter-tub. The engineer had a lively chase up-stream after his work, and finally secured it stranded in an awkward position about half-a-mile above its site.

Immediately arrangements were hurried forward to salvage the caisson. After a day and a half’s continuous hard toil it was recovered and anchored alongside the bank until the next propitious moment arrived for it to be towed out into the stream and sunk into position.

In the early days the engineers in their bridge-building operations suffered the maximum width of a river to dictate what the length of such a structure should be. Seeing that the normal channels of many of these waterways are narrow in comparison with what they attain under flood, this rendered bridge-work exceedingly expensive and intricate. It is no uncommon circumstance for a waterway, when swollen by the rains of the wet season, to spread out for a width of three miles or more. It becomes practically insatiable, the soft earth forming the banks falling a ready victim to the powerful eroding action of the scurrying water. The result is worse than that brought about by the scouring of the River Mississippi, which devours huge masses of land continually on either bank. When the Indian river falls, unsightly stretches of undulating sandbanks are revealed, riven by little back channels and small lagoons, which present a general aspect of desolation. Under such circumstances, bridging from bank to bank is a somewhat vague undertaking, for the simple reason that it is difficult to decide what are the limits of the waterway, because erosion continues until the water reaches material which defies this action.

The engineer has met this situation now in an ingenious manner. He determines the channel of the river and keeps it within bounds by means of an artificial wall or training-bund, which is carried parallel with the navigable channel, the flow of water through the space between the inner side of the wall and the shore being obstructed by a solid embankment which carries the track. This system was employed first by Mr. J. B. Bell to carry the North-Western State railway across the Chenab River at Sher Shah, and proved so eminently successful that it has come into general favour.

THE TRAINING-BUND OR WALL TO NARROW THE GANGES BY 3000 FEET FOR THE CURZON BRIDGE, SHOWING RAILWAY APPROACH

One of the latest and most interesting, as well as largest undertakings of this class, is that in connection with the Curzon railway bridge over the Ganges at Allahabad, for the Allahabad-Fyzerbad railway. At this point the river flows between high banks of hard clay about 3 miles apart, and so resistant is this earth to scouring action that erosion has been brought to cessation practically. The width of the waterway, however, is about 1¼ miles, and when it was decided to span the river, a great length of steel appeared inevitable.

ERECTING THE PIERS FOR THE CURZON BRIDGE

The training-bund is to be seen in the background.

The engineer-in-chief for the work, Mr. Robert R. Gales, M.INST.C.E., however, decided to cut down the length of the bridge-work to 3000 feet. The project was examined at great length, owing to the fact that the difference in the level of the river during the dry and flood seasons is not less than 31 feet, as the Ganges receives the waters of the Jumna about 7 miles above the site selected for the crossing. Careful investigations, however, pointed to the fact that the accumulated waters could be directed safely through a channel some 3000 feet wide, and accordingly the erection of the training-bund was taken in hand on the left bank. It measures some 4000 feet in length from end to end, and the top is 5 feet above the flood-level of the river. The up-stream arm measures 3,300 feet in length, and the extremity ends in a sharp curve to mitigate the effects of scouring. Viewed from the bank, the work resembles a huge letter “L,” with the bottom arm pointing up-stream, and the tail overhanging for about 700 feet, while the upright member forms the embankment connecting the training-wall to the shore, and leads the railway track to the bridge.

The training-wall is built up of sandy soil, with stone pitched on the face exposed to the action of the river. At the top it is about 20 feet in width, and carries a wide-gauge railway track from end to end, so that should the floods tear a gap in the embankment, the injury can be repaired immediately by dumping spoil into the breach from railway wagons.

Erection had to be hurried forward, as the season available for operations was so short. In view of the fact that the erection of the wall entailed the handling of some 50,000,000 cubic yards of earth, some idea of the magnitude of the task may be gathered. It was split up into a number of contracts, and when the operations were in full swing no less than 7000 coolies found employment.

While this work was in progress the bridge itself was pushed forward. The length of metal is 3000 feet, divided into 15 spans, each of 200 feet, carried upon masonry piers. The bridge was called upon to meet requirements not only for railway traffic but for pedestrians and vehicles as well. A single line of 5 feet 6 inches gauge suffices for the former, which is carried upon the bottom deck, while the upper deck meets the second requisition, being 23 feet wide and about 60 feet above the level of the waterway when in flood.

The undertaking was pushed forward with such energy that it was completed in three seasons. The saving in outlay resulting from constricting the river channel, and thereby reducing the length of steel-work, represented no less than £100,000, or $500,000. This offers a convincing illustration as to the ingenious manner in which the bridge engineer in India has succeeded in reducing the costs of spanning the noble waterways of the country.

In a far-away corner of the same country, Upper Burma, may be seen another interesting example of the bridge-builder’s craft, carried out under particularly exacting conditions in a forbidding country. This is the Gokteik Viaduct, which carries the metre-gauge single track of the Burma Railway Company across the gorge of the same name. This structure was completed by the Pennsylvania Steel Company, of Steelton, Pennsylvania, and the award of the contract was criticised severely in Great Britain. But the Government wanted the valley spanned in the shortest possible space of time and at a moderate price. When the tenders invited from all parts of the world were opened, it was found that the British firms had been outclassed by their American rivals in both these essential factors.