The Railway Conquest of the World
When the new bridge, with its 22,000 tons of steel, was completed for traffic it was renamed, but as the reconstruction coincided with the Jubilee of Queen Victoria’s reign, the revision comprised merely the perpetuation of that auspicious event, and to-day the structure is known as the Victoria Jubilee Bridge. From first to last the structure has cost £1,800,000 ($9,000,000), of which reconstruction absorbed about £400,000 ($2,000,000).
As the Grand Trunk increased in importance, subsidiary and tributary railways were absorbed. Nor was the original idea of a trunk line overlooked. This end was achieved by pushing towards Chicago, the busy centre of the Middle States. Continuity of rail in this case, however, was interrupted by the St. Clair River, the narrow strait which connects Lakes Huron and Ontario. In the early days communication was maintained by means of ferry-boats, which handled complete trains, but as the river is extremely erratic, with strong currents varying in velocity according to the direction of the wind, and is congested with shipping, the ferry service possessed many shortcomings. When the strait was obstructed with floating ice, the situation became far more serious.
Accordingly, in order to remove these disabilities, a bold solution was elaborated in the form of a tunnel beneath the waterway connecting Sarnia on the Canadian with Port Huron on the United States side of the St. Clair River. It certainly was an audacious remedy for a perplexing problem. The river is 46 feet deep and is nearly half-a-mile wide, so that the tunnel had to be planned at a great depth. However, no better alternative could be offered, for a bridge was quite out of the question, so in 1886 the St. Clair Tunnel Company was formed as a subsidiary undertaking of the railway, to complete a subaqueous link of communication, with Mr. Joseph Hobson as chief engineer.
As the topography of the land on either side is tolerably flat, the question of the approaches had to be settled, and a heavy grade at either end could not be avoided. Technical difficulties were encountered at the very start. A trial shaft was sunk on the Canadian side to a depth of 98 feet, while another shaft on the American side was carried down to 92 feet. The preliminary shafts were elliptical in shape, measuring 4 feet by 8 feet in diameters. When the requisite depths were obtained, galleries were driven at right angles beneath the river. These efforts proving satisfactory, it was decided to build the complete tunnel from either bank from shafts, as in the case of the Blackwall tunnel. The shafts were each 23 feet in diameter, and they were so built that there was a circular ring, the lower face of which carried a knife-edge digging into the ground. The soil was excavated from beneath this knife-edge, and as the brick-wall lining of the shaft was built upon the upper surface of the knife-ring, it was considered that the superimposed weight would drive the knife downwards as the earth beneath was removed.
But these carefully-laid schemes and anticipations went astray. Exasperating failures and mishaps occurred, and at last the engineer changed his plans; the shaft method was abandoned. Instead, he decided to drive the tunnel from either end through the approaches. For this purpose the plant and machinery were removed inland from the shafts for a distance of 1,900 feet on the Canadian, and 1,800 feet on the American bank respectively. Two huge cuttings were driven downhill until the tunnel level was gained, when the burrow beneath the river was commenced. The tunnel itself consists of a circular iron tube or pipe of sufficient diameter to carry a single track. It is 19 feet 10 inches in diameter, is built up of cast-iron rings, and weighs complete 56,000,000 pounds, or about 25,450 tons. Boring was effected from either end by means of the hydraulic shield, and in less than three years the task was finished.
The length of tunnel beneath the water is 2,290 feet, while that under dry land represents another 3,748 feet, making a total length of 6,932 feet. To this must be added 5,580 feet of approaches, which brings the total extent of the work to nearly 12,000 feet, or 2¼ miles. It cost £540,000, or $2,700,000, and has always ranked as a noteworthy achievement in this particular branch of engineering.
Owing to the steepness of the approaches on either side special locomotives had to be built to handle the traffic through this artery. They were powerful creations of the railway engine designer, and when they appeared were the largest steam locomotives in the world. They could haul a train weighing 760 tons, though at times the pace was slow.
But traffic between the United States and Canada increased by leaps and bounds, owing to the provision of this tunnel, with the result that in a very few years the railway authorities found that the tube was quite overtaxed. A solemn conclave was held as to the best ways and means of meeting this development. The track could not be doubled; so the question was how to increase the existing hauling capacity of a single engine. Steam could not meet the question, so was ruled out of court. Then an engineer suggested electrification, and advanced a report to show how the weight of each train might be increased by nearly 25 per cent. with quicker working, and consequently would facilitate the passage of a greater number of trains in a given time.
This engineer, Mr. Bion Arnold, was authorised to proceed with his scheme and to complete his plans for the electrification of the tunnel. He did so, and as a result a specification was drawn up requiring the haulage of a train weighing 1000 tons over the 2¼ miles in 15 minutes, with a maximum speed of 25 miles and a minimum speed of 10 miles per hour respectively. When the plans were made known it was realised that the project comprised the most ambitious electrical undertaking that ever had been attempted up to that time in railway operations, especially as it was insisted that the electrical system should be of a type which constituted its first application to heavy steam railway working. This is what is known as the single-phase alternating current system with overhead conductor.
The invitation for tenders was awaited with keen anticipation throughout the world, as it was conceded to offer a unique opportunity to the electrical engineer. Consequently keen competition was evinced to secure the honour of carrying out such a remarkable undertaking. The contract was secured by the Westinghouse Electric & Manufacturing Company, and was carried to a successful conclusion at a cost of £100,000 ($500,000). The locomotives now used on this service are among the most powerful in the world. They weigh 135 tons, and develop about 2000 horse-power, which enables them to haul a 1000-ton train up the heavy approach grades at a minimum speed of 10 miles per hour. Moreover, since electricity was adopted, the tunnel has been kept free from the dense clouds of smoke and steam which originally converted the tube into a veritable inferno, and, what is far more important from the railway company’s point of view, the electrical system is able to meet three times the volume of traffic that exists to-day, so that there is ample provision for the future. As it is, the 2¼ miles of line beneath the teeming St. Clair River is the heaviest electrically worked section of railway in the world.
Another link with the United States, however, was incumbent to bring the manufacturing centres around Buffalo into closer communication with the Dominion. Yet there was only one point where this link could be provided—across the gorge through which the Niagara River, after tumbling over the lofty cliff, seethes and boils on its way to Lake Ontario. A suspension bridge met the exigencies of highway traffic for some years, but here again improvement was demanded. Accordingly, a new bridge was planned, and this constitutes one of the most graceful structures spanning that fearful rift.
The old bridge fulfilled its services faithfully for forty years, and when demolished was found to be possessed of several years of life. The new bridge is a splendid work, and its close proximity to the Falls offers a striking comparison between the handiwork of Nature and that of the engineer. The bridge leaps across the gorge in a single span, and when one is speeding over the structure in the train, one is at an elevation of 226 feet above the raging waters below. The span is of no less than 550 feet, and the ends are secured to massive anchorages sunk into the face of the cliffs. It is wrought throughout of steel, and is approached from either side over a single truss span 115 feet long, giving a total length of 780 feet.
But the bridge serves a dual purpose. The upper level or deck, 30 feet in width, carries two tracks for the railway’s need, but below this is another deck, 57 feet wide, which has a central carriage-way flanked on either hand by a broad pavement, so that the bridge provides vehicular and pedestrian accommodation between the opposite banks. In order to provide this improved connection between the two nations, a sum of about £100,000 ($500,000) had to be expended. The improved facilities it offered so appealed to the public on both shores that they celebrated its opening in 1897 by a three days’ carnival.
As time sped by, the Grand Trunk railway gradually but surely swallowed its competitors, until at last it was left in undisputed possession of the Province of Ontario, from the railway point of view. To-day it has over 8000 miles of intricate steel ribbon stretched between the Great Lakes and the Atlantic coast, while between Montreal and Chicago the fastest trains in the Dominion hurtle to and fro over a double track 840½ miles in length, which is the longest continuous stretch of double track under one management in the world, and upon which some exhilarating speeds are attained.
When the British capitalists committed themselves to an expenditure of over £9,000,000, or $45,000,000, for the construction of less than 500 miles of line through virgin territory, it is doubtful whether in their rosiest dreams they ever anticipated that it would grow into a huge organisation aggregating a third of the railway mileage of British North America within sixty years.
Development is still being maintained; new territories are being conquered. A new long and sinuous arm, 3,556 miles from end to end, is being stretched out from the Atlantic to the Pacific Ocean, to bring the eastern into direct touch with the western seaboard. The whole has grown from the insignificant little wooden road that was laid between La Prairie and St. John’s in the Province of Quebec eighty years ago.
CHAPTER V THE FIRST TRANS-CONTINENTAL ACROSS THE UNITED STATES
“There were difficulties from end to end: from high and steep mountains; from snows; from deserts where there was a scarcity of water, and from gorges and flats where there was an excess; difficulties from cold and heat; from a scarcity of timber and from obstructions of rock; difficulties in keeping a large force on a long line; from Indians; and from want of labour.”
This was the terse story related to the United States Congress by Collis P. Huntington, one of the moving spirits of what, at that time, was a tremendous undertaking—the construction of the first railway across North America whereby the Atlantic was linked with the Pacific by a bond of steel. But that concise statement concealed one of the most romantic stories in the history of railway engineering: of grim battles every hour either against the hostile forces of nature or of mankind.