The Railway Conquest of the World
On the same section is another heavy piece of work of this character, the Reinunga tunnel, extending for 5,217 feet through a massive mountain shoulder. Here the country is extremely wild, and the location of the line taxed the plotters supremely. The track crawls along a narrow ledge for some distance, poised nearly 500 feet above the highroad. The situation is precarious, for landslides and avalanches are of frequent occurrence, while detached boulders rattle down the slopes at times and threaten the railway with extinction. Fortunately, as the metals are laid on a gallery of solid rock hewn in the mountain-side, the extent of the damage inflicted by these visitations is limited to the permanent way, though the presence of these untoward obstacles, and the result of their impact with the metals, may interrupt communication for a short time.
A VIEW ON THE BERGEN RAILWAY IN WINTER, SHOWING SCREENS TO PROTECT LINE FROM DRIFTING SNOW, AND SNOWSHEDS
Seeing that a difference in level of over 4,100 feet has to be overcome in the 47 miles between Vossevangen and Taugevand, it is a teasing up-hill pull all the way. The grades are very abrupt at places, and impose a severe tax upon the locomotives. The passenger, however, has one compensation for slowness in travel. Some of the grandest scenery to be seen on the European continent is unfolded to the train as it glides in and out among the mountain rifts, and consequently, from the tourist point of view, the route possesses illimitable attractions, inasmuch as it offers facilities to gain some of the most beautiful parts of the country, which hitherto have been unapproachable, except in the face of an arduous and tedious journey by primitive means of conveyance.
MULES CARRYING WATER IN BARRELS
[See page 279
LOAD OF RAILWAY METALS ON A MULE’S BACK
RAILWAY BUILDING IN THE ANDES
After crossing the summit level the railway commences an easy descent, for the inland plateau is gently undulating, and the valleys being wider, the surveyors were assisted appreciably in their task of discovering an easy location. The downward run continues until Bromma, 205 miles west of Bergen, is gained at an altitude of some 450 feet. Then comes another rise to overcome a low range, which is accomplished through a tunnel 7,644 feet in length.
This tunnel proved a more exacting and troublesome undertaking than either the Gravehals or Reinunga works. The boring was attempted at first on the time system, but the advance was so slow and unsatisfactory that this principle was abandoned. The whole tunnel was then handed over to a contractor, but he found the rock so hard that a piece-work system was instituted. In this arrangement the workmen were stimulated to supreme effort by the offer of tempting premiums. Issuing from this tunnel, there is another descent for some miles, when another ridge intervenes, necessitating a sharp climb of 700 feet, followed by a smart downward run to Roa, where a junction is effected with the Norwegian eastern railway system.
Contemporaneously with the building of this line between Vossevangen and Roa, the original section between Bergen and Vossevangen had to be overhauled. The metre gauge was in vogue upon this division, whereas the rest of the line was being built on the standard gauge to secure uniformity with the other lines. Accordingly, the narrow-gauge was replaced by standard-gauge track.
The Bergen-Christiania line ranks as one of the most striking pieces of railway engineering in Europe, and testifies to the remarkable skill and dogged perseverance of the Scandinavians in breaking down tremendous obstacles as they arose, with complete success. It is no light undertaking to attempt such an enterprise as this in such a latitude across a terribly exposed, storm-swept plateau, among the most sparsely populated regions of Europe, and where the winter lasts for eight or nine months. The rainfall is tropical in its severity, while the storms are of terrific fury, as the workmen found to their cost.
Some idea of the magnitude of the work consummated by the engineers may be gathered from a few general details. The line passes through no less than 184 tunnels, which represent an aggregate length of nearly 24 miles. To carry the line across depressions which could not be filled, 14 bridges, ranging from a single-span stone structure of 60 feet to a metal bridge 566 feet from end to end, had to be built. Between the two terminal points 55 stations and stopping-places have been provided. In order to fashion the permanent way the engineers had to excavate about 35,000,000 cubic feet of earth, and nearly 30,000,000 cubic feet of rock on the highest parts of the mountain section, this latter task being assisted by the expenditure of over 1,800,000 pounds of dynamite.
The anticipated task of maintaining communication, especially on the higher and more exposed sections of the railway, has been appreciated to the full. To deal with the snow three powerful rotary ploughs have been acquired, and one is kept in constant readiness. It is no unusual circumstance for this equipment to be called out in the middle of summer to cope with a block in one of the deep cuttings. The drift is a danger against which especial attention has to be devoted, for the wind catches up the fine, dry flakes and whirls them in clouds across the country. To prevent this being deposited upon the line, and thus obstructing traffic, timber screens have been erected beside the line, this defence continuing in an almost unbroken line for 60 miles between Mjolfjeld and Gjeilo.
The provision of the line, however, is of far-reaching importance to the commercial interests of Norway. Formerly, 54 hours were required to travel between Christiania and Bergen, but now, by cutting almost straight across the peninsula, the journey can be covered in 14 hours. To forge the link of 215 miles between Vossevangen and Roa, to complete this undertaking, occupied ten years, and the £3,333,000, or $16,665,000, expended upon the enterprise is considered an excellent investment for the country.
CHAPTER XXII FROM BUENOS AIRES TO VALPARAISO OVERLAND
Though Meiggs was denied the glory of having built the first South American trans-continental railway, yet the idea has been carried to fruition, but at a point much farther south than he contemplated. Again, whereas the audacious Philadelphian engineer proposed only to establish his Atlantic terminus on the upper reaches of the Amazon, the completed line runs down to the water’s edge on either coast, the two opposite ports connected in this manner being Buenos Aires on the Atlantic, and Valparaiso on the Pacific, coasts.
The Trans-andine railway itself, which completes this connection, however, only extends from Mendoza at the foot of the mountain chain on the Argentine side, to Los Andes on the Chilian slopes of the range. These two points are 156 miles apart, but the metals had to be lifted 11,500 feet into the air to bring them together.
When it was decided to connect Mendoza and Los Andes together in this manner, the first-named town was in direct touch with the Atlantic Ocean, the Buenos Aires & Pacific railway having thrown its meshes inland to the foot of the mountains. This was not a difficult matter, owing to the flatness of the country, pampas plains for the most part prevailing. The result is that in the climb from Buenos Aires to Mendoza only 2,470 feet has to be overcome in 650 miles. Consequently, the gradients are so slight as to be practically imperceptible. Indeed, so simple was construction that it was found possible to lay the metals in an absolutely straight line for no less than 210 miles—the longest stretch of “straight” line in the world.
It was in 1886 that the first preliminaries in the actual construction of this final link in the coast-to-coast railway was made. The surveys showed the feasibility of the scheme, though it was pointed out that to climb over the Andes would entail work of a peculiar character, and that the cost would be tremendous. The critical point was the negotiation of the summit itself, for the mountain pass is at an altitude of 12,796 feet. Though commenced in 1886, the scheme experienced many changes of fortune which hindered construction time after time. Financial and labour troubles were the two most retarding factors. By 1891 only 57½ miles were open to traffic; four years later only witnessed the passing of the 90th milestone. Such slow progress was deplorable in comparison with the building of the Oroya and Mollendo railways.
Then came a delay of four years, but in 1899 work was resumed and was pushed forward to completion. On the Chilian side, owing to similar troubles, construction was possible only in spurts, and even when the financial details were adjusted satisfactorily, the scarcity of labour remained a thorny problem.
The surveys showed that the most practical route westwards from Mendoza was by following the course of the river of that name right into the mountain range. In this manner extensive blasting and heavy cutting could be avoided, except where the mountain-sides dropped abruptly into the river, and then these would have to be tunnelled.
The constructional engineers followed this location, but only to run full-tilt into another difficulty which had not been foreseen. The Mendoza is a South American replica of China’s ill-fated Hoang-ho. In the low season its placid waters roll leisurely to the ocean, but when it is swollen by the melting snows it tears along with fiendish velocity. As its banks are composed only of the soft alluvium brought down from the mountains, the foaming waters do not find this a very difficult obstacle, and accordingly carry it away in tremendous quantities. As a result, the river is for ever changing its channel.
To the railway engineers such eccentricities proved serious factors. They realised speedily that here was a situation peculiarly exasperating, for long lengths of track were swept away bodily time after time. It never could be anticipated where the turbulent water would break its bounds next. A stretch of permanent way, left safe and sound in the morning, sometimes was wiped out of existence before nightfall. All that could be seen of the work possibly was the rails dipping into the water on one bank and reappearing on the other, the intervening section describing a graceful festoon in the depths of the muddy torrent. At times the waters were more freakish. They would burst upon the track with such violence as to wrench the metals apart; then only the jagged, twisted ends jutting mournfully into the air on either side of the new river channel were the sole remnants of the track.
The engineers tried innumerable expedients to preserve the line from these erratic attacks, but without any material success for some time. At last they decided to provide the river with an artificial embankment, and to lay the track well back from the waterway. Trainloads of huge masses of stone were brought to the vulnerable points and pitched at the foot of the embankment, which was raised to a height well above flood-level. Thousands of tons of stone were dumped in this manner, and it was found that it afforded complete protection, because the water could not dislodge the masonry pitching to eat its way into the soft earth beneath. The artificial dyke solved the problem of how to keep the rushing, boisterous Mendoza within bounds.