The Railway Conquest of the World
But the line, after leaving Lake Kivu, has to pass through Belgian territory, and as this location is inevitable unless it were decided to swing somewhat to the east to pass through German East Africa, an easier route has been offered through the Congo. The railway has been taken from Broken Hill to Elizabethville. The Belgian authorities are anxious that it should be extended from that point to Bukana on the Congo River. Boats could be used between this point and Congolo, where communication by rail would extend to Kindu, to be followed by another stretch of river as far as Ponthierville. The existing railway to Stanleyville would then be pressed into service, and from the last-named point the line would debouch to the north-east to gain the Albert Nyanza, and there link up with the railway that has been driven southwards from Cairo.
CHAPTER XII CECIL RHODES’ DREAM—FROM THE CAPE TO CAIRO II.—Southwards from Cairo.
While the southern arm of the great line has been pushed on energetically northwards from Cape Town, the northern limb has descended almost as rapidly down the Valley of the Nile to the great interior, so that the heart of the continent is being eaten into spiritedly from both ends. The two branches have been built under totally different auspices. Whereas the southern section was carried out by private enterprise, the northern division is the work of Government effort.
In the north the railway has made history rapidly, and its conquest has been of a complex character. It placed a unique weapon in the hands of the Government, and it wrested a vast track of Africa, aggregating 950,000 square miles, from barbarity and religious fanaticism in the form of Mahdism.
Owing to the impoverished condition of the country, the railway in Egypt has experienced a very chequered career. It commenced its pacific invasion promisingly enough, but it was found to be a highly expensive settling influence for a land whose coffers had been depleted almost to the extent of emptiness.
The early lines, when laid, were neglected, and consequently fell into a sorry condition. The majority of people who had regard for their lives and limbs preferred other vehicles of transport. Everything in connection with the iron road was conducted in a haphazard manner. Trains started without any one having the faintest idea as to where they were going or what time they would reach some destination. Lord Cromer relates that when he first went to the Land of the Pharaohs all the lines were single track. No staff or block system of any kind was in vogue, and there were no signals. A train started from a station on the off-chance that another train was not coming in the opposite direction. Needless to say, as he tersely remarks, “he avoided those lines.”
In the Sudan matters were even worse. The Khedive embarked upon a laudable enterprise when he decided to carry the iron highway southwards from Wadi Haifa. Khartoum was the objective, but nearly half a century passed before the iron horse appeared at the latter point, for when the Khedive’s railway got so far as Sarras, 33 miles south, funds became exhausted and the scheme was abandoned. Another attempt was made in 1885–6, on the occasion of the Nile Expedition, to resuscitate the scheme, and by great effort another 53 miles were tacked on from Sarras to Akasha. The life of the second section was short, for when the British forces retired the track was pulled up by the dervishes, and Sarras reverted to its position as the southern terminus.
When Lord Kitchener was deputed to crush the Mahdi for once and for all, he found 1,200 miles of sandy desert between him in the north and the seat of the fanatic’s power. The river was available for the movement of troops as in the previous campaign, but the latter had emphasised the disadvantages of that highway through hostile territory. He foresaw that only one agency would enable him to accomplish the desired end, and that was the railway. Among his officers was a Canadian engineer, Sir Percy Girouard, and he discussed the possibility of building a line across the desert to span that inhospitable gap in order to pour his troops against the Mahdi forces. The engineer realised the situation and undertook to carry the line southwards from Wadi Haifa.
The task was commenced in 1896, and railway construction was pushed forward with such spirited energy that Kerma, at the head of the cataracts, was gained in a short time. No great engineering difficulties were offered because the desert is tolerably level, and the sand provided a good foundation for the steel sleepers, or ties, with the minimum of ballasting. The greater question was to maintain the steady supply of requisite material southwards from Alexandria. Yet an average speed of two miles per day was maintained, the rails being laid for the most part by natives, assisted by both British and Egyptians, under the military engineers.
The objective was Abu Hamed, where the Nile describes a big elbow, and at that time this point was in the hands of the enemy. Its capture, however, by the Anglo-Egyptian troops resulted in a speeding-up in constructional work on the advancing railway, and the 80 miles of line into this town were laid in about two months. Clinging to the east bank of the river, it was driven southwards to Atbara, where a halt was called, and where the headquarters were established for the Omdurman campaign. Curiously enough, although the railway has reached the capital of the Sudan, Atbara has not yet lost its importance from the railway point of view, being the administration centre for the whole Sudan Government railway system.
At this place the Nile is swelled by the waters of the Atbara River, which flows in from the east. While the campaign was in progress communication between the opposite banks was maintained by means of a wooden bridge. As the river, however, is tempestuous when in flood, during which period it rises to a high level, a more permanent structure was demanded for the iron horse. The width of the waterway called for the erection of over 1000 feet of steel bridging. When the advance of the railhead was determined, it was decided to rush the railway across the river before it once more rose in flood. Tenders were invited, only to be received with dismay, because it was found that the structure required was of such an elaborate character that no English firm would undertake to complete it within two years.
CONSTRUCTION TRAIN ON THE WAY TO THE RAILHEAD CROSSING A TEMPORARY TIMBER BRIDGE
Photos by courtesy of A. L. Lawley, Esq.]
THE LONGEST BRIDGE IN AFRICA, 1,300 FEET IN LENGTH, ACROSS THE KAFUE RIVER
THE CAPE TO CAIRO RAILWAY
This upset official calculations severely, and accordingly fresh tenders for a simpler type of bridge were called. The task was thrown open to the world, and celerity of construction was the primordial condition. The British firms re-tendered, but to their disgust they were beaten hopelessly both in regard to the cost of the structure and the time in which it could be erected by the American engineers. The result was that the contract went to a Philadelphia firm. Five weeks after the receipt of the order the steel-work left New York, and within a further few weeks communication across the river was provided by 7 spans of steel, each 147 feet long, resting on cast-iron cylinders.
[See page 164
THE “HANGING BRIDGE,” ONE OF THE RAILWAY ENGINEERING WONDERS OF THE DENVER AND RIO GRANDE, IN THE ROYAL GORGE OF COLORADO
The most remarkable feature about this contract was the public outcry that ensued. British methods were held up in comparison with American hustle, much to the disparity of the former. British builders were assailed as lethargic, wedded to obsolete methods, and consequently had suffered the penalty of such conservatism by being beaten in a most hollow manner. The same critics, however, failed to shriek so loudly in acclamation a year later in appreciation of a British firm which accomplished a feat which even startled the Americans. This was in connection with a bridge of five spans, each 105 feet long, which was turned out of a Midland shop to replace the structure which had been destroyed by the Boers across the Tugela River in Natal. Both British and American engineers were invited to tender, and the American firms, despite their wonderful organisation, hustling methods, and their remarkable facilities for accomplishing quick work, were dismayed to find that they had been beaten by their British rivals as hollow as the latter had been vanquished some months before. The successful firm rolled 100 tons of steel, had it inspected, tested and passed by the Natal Government engineer in eight hours. It had undertaken to deliver the first span within six weeks of the receipt of the order—as a matter of fact, it was completed within nineteen days. The Americans themselves admitted that the British performance was wonderful, and that complete revenge had been taken for the Atbara contract.
As the railway pushed its way towards Khartoum, the ranks of the labourers were swelled by large numbers of dervishes, who had grown disheartened at the result of their resistance to the British advance on the northern borders of the Mahdi’s stronghold, had realised the impotency of their efforts, and consequently had decided to throw in their lot on the railway. The increased labour enabled the work to be prosecuted even more energetically, though a certain amount of time was lost in drilling this raw material into the mysteries of wielding the white man’s tools.
When the dervishes first saw the locomotive they marvelled. Steam was beyond their comprehension. They believed stoutly that the engine’s boiler was packed with animals, and when the driver blew his whistle many fled in complete terror. To them the agonising shriek of the animal on wheels was more terrifying than the hail of lead from a Maxim gun. Indeed, it is reported that one chief, when he saw a locomotive puffing along slowly and laboriously with its load of cars, went so far as to assail the British officers for their callous cruelty in making so small a beast pull such a heavy, long load!
The Atbara bridge, after fulfilling all requirements for eleven years, had to be reconstructed. It was not found strong enough to withstand the heavy loads of to-day, for on the Sudan railway weights, lengths and speeds of trains have increased strikingly during a decade. When overhaul became imperative, an English firm secured the commission to rebuild the American structure, and to-day there is nothing left of the bridge which provoked such acrimonious discussion at the time of its erection. Owing to the elaborate nature of the building operations a temporary bridge had to be thrown across the river to carry the railway traffic.
When Khartoum was gained another pause was unavoidable owing to the necessity to cross the Blue Nile in order to continue southwards to Sennar. This arm of the great Egyptian river is fickle, for in times of flood it rushes along at some 11 miles an hour. The contract for carrying the railway to the opposite bank was secured by the firm entrusted with the overhauling of the Atbara bridge, and it is a noble work of its class. The river being navigable, facilities had to be provided to permit vessels to pass up and down. This end was met by introducing an electrically operated rolling lift span working like a drawbridge. To enable railway construction to be carried on while the river was being negotiated a temporary timber bridge was thrown across the waterway. While this was in progress the power of the waters rushing through this tributary when in flood was emphasised in no uncertain manner. A considerable quantity of scaffolding intended for the support of the steel bridge during erection was torn up and hurried down-stream.