There was one benefit accruing from the empire-builder’s dream—he gave the engineers of South Africa elbow-room in which to display their ability within certain limits. It might be said that he inaugurated a new railway-construction policy so far as South Africa was concerned. The railway-builders had an extensive territory to cover, and they appeared to cherish the belief that the best means by which this conquest could be achieved was upon the most expensive lines possible. Thus, for instance, the railway network in Natal, the Transvaal and Orange Free State cost about £15,000, or $75,000, per mile, and those of Cape Colony about £10,000, or $50,000, per mile—sums out of all proportion to the railway needs of the time, and which served to commit the countries to a heavy capital outlay and interest charges. When Cecil Rhodes outlined his project he set himself to a limit of about £5,000, or $25,000, per mile.

Such a line was a pioneer road in the fullest sense of the word, but it would suffice to meet the demands of the country for many years to come, and could be improved as circumstances demanded. The time will come, doubtless, when a standard-gauge road from the waters of the Mediterranean to the southern end of the continent will become imperative, but a few decades will have to pass before the line of 3 feet 6 inches gauge becomes inadequate.

The Cape to Cairo is remarkable in many respects: in fact, it might be described as a string of record-breaking feats in railway engineering. In the first place it was the first trans-continental road ever to be driven longitudinally through a continent—the coast to coast lines in other parts of the world cut across the continent from east to west. When completed it will be the longest continuous trunk iron road ever built. In its length are comprised both the highest and longest bridges in Africa, in its realisation the highest speed in track-laying has been recorded, and it has been driven steadily forward under conditions such as never have attended the realisation of any comparative project—war, plague and famine.

When the scheme was commenced the railways of the southern colony had penetrated 647 miles up-country from Cape Town to the diamond mines at Kimberley. Consequently, Diamondopolis was selected as the starting-point for the northward advance, through the hinterland now known as Rhodesia. The first rail out of Kimberley was laid in 1889, and by October, 1894, it had gained Mafeking, 223 miles beyond.

While this part of the work was under way the colonisation of Mashonaland had proceeded, and had progressed so favourably that the railway’s advance became an urgent necessity, especially as the Matabele under Lobengula were giving signs of trouble, and it was essential that the latter should be subdued. So in 1896 the dull, grey snake resumed its tortuous crawl to the north. Further trouble was experienced at this juncture, and retarded operations to a material degree. The deadly rinderpest broke out, and swept off the settlers’ cattle like flies. Transport was paralysed, and the engineers were called upon to perform a superhuman task to pour supplies and material forward. As animals were unavailable, traction engines had to be brought up-country to ply between the point where the locomotive stopped and the construction camps strung out ahead.

However, Rhodes decided that the rails must reach Buluwayo before the end of 1897. Seeing that 492 miles divided the railhead from the latter point, this was no mean order; but Messrs. Pauling & Co., the contractors, promised that his wishes should be fulfilled. Large forces of natives were whipped up, and by superhuman effort the apparently impossible was achieved, the 492 miles of metals being laid in 500 working days.

As might be supposed from the low cost of the line (£4,500 or $22,500, per mile), the engineering work was not of an elaborate character. Rapidity of construction, combined with low cost, were the two governing considerations that had to be borne in mind, for the sooner railway transportation was provided, the earlier settlement would take place. The terms governing construction demanded that the line should be of such a character as “would be capable of effectually conveying traffic at a speed of twelve miles an hour on completion, and that grades and curves were not to be sharper and heavier than generally prevailed upon a line of this gauge.” Ballasting was only to be used on such portions of the line as was necessary to ensure the safe running of the trains during the rainy season.

In laying the road very little regard was paid to formation, and wherever the surface of the ground was even it was followed, the steel sleepers being packed with the minimum of ballast to give a moderately smooth running top. The shallower streams and rivers were not bridged, but the railway was carried across over a ford. If the water rose above the track a few inches, a thrilling spectacle was offered when a train crossed. It would creep carefully down the bank and crash full tilt into the water, sending up a column of spray which entirely obliterated the front of the engine from view. Later, the line was overhauled and brought into conformity with modern requirements, bridges of steel being introduced to span all obstructions of this character. Timber was impossible, owing to the ravages of white ants, though creosoted wood was found to offer a substitute for the metal for a short period, and was adopted sparingly.

Buluwayo lies at an altitude of 4,400 feet, and from this point the line falls steadily until it gains the Gwaai River, 1,200 feet lower. Crossing this waterway, the line makes a straight cut across the flat, sandy and wooded country for 71 miles as the crow flies, to enter the Wankie coalfield.

In this district the surface run could not be continued, and consequently heavy cuttings and embankments had to be carried out over a distance of 59 miles.

Beyond the Wankie coal territory, and 282 miles north of Buluwayo, the line ran up against the first serious physical difficulty, but one of such proportions as to make amends on the part of Nature for the easiness of the grading hitherto. This was the Victoria Falls on the Zambesi River, and the location of the line compelled a crossing of this magnificent waterway just below the cataract, where the water, after tumbling over the ledge, is forced through a deep, narrow gorge 400 feet in depth.

The situation demanded the consummation of some monumental piece of work. The Niagara gorge had been bridged, but the task of spanning that chasm was mere child’s play in comparison with that confronting the engineers below the Victoria Falls. The cliffs are sheer practically, for the canyon through which the water rushes for some 20 miles is but a fissure in the earth’s crust.

The surveys, which were carried out with great difficulty, showed that the break would have to be bridged in a single span about 500 feet in length from brink to brink, with the rails over 420 feet above low water. For purposes of comparison, it may be mentioned that, although the structure of the same type thrown across the Niagara gorge to carry the Grand Trunk railway from Canadian to American soil has a main span 50 feet wider, while the bridge itself is almost twice as long, the rails are laid only a little more than half the height above the water—226, as compared with 420 feet.

One early difficulty was the establishment of communication with the opposite bank, to avoid a long detour of about ten miles in order to cross the river. First, in order to bring the camps perched on each cliff closer together, a telephone wire was thrown across the ravine. This frail connection was completed in an ingenious manner. A thin string was tied to the stick of a rocket which was fired across the gorge. The opposite party secured the stick and end of the stout twine, and by its means hauled across a thicker length of string, which in turn was followed by one still stouter, with which the telephone wire was hauled across. In this way the opposite camps were brought as closely into touch with one another as if they were side by side on the same bank. Previously, attempts had been made to fly a string across by means of a kite, but the upward rush of eddying air from the vortex of the water caused the kite to become the sport of the wind and to play sorry pranks, without gaining the opposite bank. The complete success of the rocket caused a similar cycle of operations to be repeated, only in this case, instead of hauling a telephone wire across the gorge, a marked wire was handled, the idea being to measure accurately the width of the gap, a spring balance being introduced at one end to compute the extent of the “sag” of the wire for the purposes of calculations.

The result of these investigations served to countercheck the surveys, which were found to be strikingly correct, and the design of the bridge was taken in hand immediately by Mr. G. A. Hobson.

Actual construction was commenced without delay, the task being undertaken by the Cleveland Engineering & Bridge Building Company of Darlington, who, by the successful completion of this task, once more emphasised the predominance of the British bridge-building engineer. The main span is a graceful curve of steel springing from the cliff-face on either side, the latter being excavated for the purpose of securing the foundations. As construction was possible only on the cantilever principle from either side, facilities had to be provided for the transportation of material as it was brought up by the railway, from the south to the opposite cliff, and for this purpose an overhead cableway was slung across the gorge. This vehicle of transport was employed not only for the building of the bridge, but also for the conveyance of other necessities for the railway, as the latter was pushed ahead from the north bank while the bridge was being erected. Workmen were also slung across the gorge by this means in a little cage, and occasionally visitors who were anxious to experience a new sensation made the trip at a cost of 10s., or $2.50 per head.

Photo by courtesy of Cleveland Engineering & Bridge-Building Co., Darlington]

THE GREATEST BRIDGE IN THE WORLD

The steel link springing in a single span of 500 feet from one cliff to the other over the Zambesi River just below the Victoria Falls. The trains pass across the gorge 420 feet above low water. Observe the net which was suspended below to catch falling tools and workmen.

One feature of the undertaking was the extreme care taken to protect the workmen from certain death in the river below if they slipped from their precarious perches in mid-air. A heavy, strong net was slung across the chasm beneath the actual working point to catch “boys and tools should they inadvertently drop.” The two ribs of steel were pushed outwards from either bank, and finally met in the centre, where the final bolts, securing first the two sections of the bottom members together, were slipped in without any untoward incident. At the point where the maze of steel springs from the cliff-face the bridge measures 105 feet from the bottom to the top member, while at the crown of the arch the depth is 15 feet. The width at the rail-level is 30 feet, while the bottom curved steel ribs, at the point where they are secured to the rock, are about 54 feet apart.