A HUGE BLAST

35,000 tons of rock were dislodged by 10,125 lb. of explosives.

Accordingly the deviation was commenced. The surveys for the new line had been prepared by Mr. Henry Deane, M.INST.C.E., while engineer-in-chief for railway construction. He proposed a series of tunnels built on a gradient of 1 in 90 running through a number of spurs projecting from the main range, and although these were intercepted by gulches the latter could be filled with the rock excavated from the tunnel borings. The line in many places hugs steep precipices where the land falls away vertically for a distance of 1000 feet or so into the Kinambla Valley.

THE PUTTAPA GAP BRIDGE, 200 FEET IN LENGTH

THE HOOKINA CREEK BRIDGE

In the summer the watercourse is dry. Note the measures adopted to protect the piers from the force of the flood waters.

TWO VIEWS ON THE SOUTH AUSTRALIAN GOVERNMENT RAILWAYS

The task was commenced in July 1908 under the guidance of Mr. James Fraser, M.INST.C.E., the engineer-in-chief for existing lines, to whom I am indebted for this information, and in a short time 1000 men were engaged in boring the tunnels and making the deep, heavy cuts through the sandstone rock. All tunnels were attacked simultaneously, and the blasting assumed heavy proportions. In one case a shaft was sunk practically to formation-level. When completed it was charged with about 10,000 pounds of blasting powder and 125 pounds of gelignite. It was fired electrically, and the splitting force of the explosives dislodged 35,000 tons of rock. In another case 1000 pounds of blasting powder were tamped home in the face of a cliff, and 10,000 tons of rock were shivered to be used for embanking purposes.

In order to rush the work through at tip-top speed, special arrangements were made to facilitate the handling of the necessary supplies and men, as well as the operation of the tools. As the new line passed 350 feet below the old line, connection between the two at this crossing was effected by means of a funicular railway with a grade of 1 in 1.87. The material was brought by rail to the upper end of this temporary line, and from a special siding was dispatched direct on to the works. A small electric generating station was set up, and wires for the transmission of current for power and lighting were strung along the route from end to end to compress the air to drive the rock drills, for the motors actuating the ventilating fans and also the water-pumps.

The scheme as originally planned provided for the building of 6 miles 858 yards of new double track, which represented a saving of 22 yards upon the line that was being displaced, though the curves and grades were easier. It was estimated that the earthworks would involve the handling of 466,000 cubic yards apart from the tunnel borings. Eleven tunnels were planned, representing a total length of 2,991 yards, but during the work it was decided to cut out one tunnel as the rock was found to be shattered. Consequently it was converted into an open cutting, the sides of which are 132 feet high. Some idea of the speed with which the task was pushed forward may be gauged from the fact that in 11 months 410,000 cubic yards of excavation were completed, 1¼ miles of permanent way were laid with a single line, and 1,430 yards of the tunnelling were completed. The total cost of the work was estimated at £256,000, or $1,280,000. Its recent completion, although it relegates an imposing engineering achievement to the limbo of things that were, has resulted in the creation of another achievement equally as notable.

In building the north coast line which connects Sydney with the Queensland border, a feat of a totally different character from the zigzag was completed. This is the massive bridge, 3000 feet in length, which carries the track across the Hawkesbury River, 36 miles distant from the capital. It is divided into seven spans, each of which measures 416 feet in length, supported on substantial masonry piers.

The erection of this structure, which still ranks as the largest work of its type in Australia, occasioned considerable difficulty, both in regard to the piers and the setting of the steel-work into position. Indeed, it is doubtful as to which section of the work provoked the greater anxiety. The difficulty with the piers was the great depth to which the engineers had to descend to secure a foundation, because in mid-stream the 40 feet of water flows over a bed of mud ranging up to 120 feet in thickness.

The only practicable means by which this essential subaqueous work could be carried out was by sinking a huge steel cylinder filled with concrete. The bottom section of this huge tub, or caisson, as it is called, was closed, and after it was completed on shore it was towed out to the site where the pier was to be erected and sunk by the introduction of the concrete. The under side of the caisson was fitted with a knife edge, by means of which it could cut its way through the soft soil, the driving force for this purpose being the weight of the superimposed concrete. The mud over the area representing the superficies of the cylinder bottom was removed from the inside to enable the mass to settle down. The steel shell was built up continually from the water-level in rings, until a solid foundation was gained. When this was reached and deemed satisfactory the spaces through which the spoil from below had been withdrawn were likewise filled with concrete, so that the contents of the cylinder really form a huge pillar of concrete homogeneous from end to end.

The conditions prevailing also compelled each span to be completed near the bank upon a pontoon, the steel-work being supported upon a heavy scaffolding. The pontoon was somewhat shorter than the span of steel which projected an equal distance over either end of the former. When all was ready, and when the tide was approaching its highest point, the pontoon, with its ungainly load, was towed and was warped gently between two adjacent piers, in such a way that the ends of the span were brought into their relative positions upon the masonry. The pontoon was then made fast, and the actual settling of the steel-work was left to the movement of the tide. As the river fell, carrying the pontoon with it, the span descended until in due course the ends rested on the masonry. The water still falling, the scaffolding presently dropped below the steel-work, leaving the latter clear in position. Finally, when the tide had fallen still more, the pontoon was cast off and drawn away, leaving the two piers connected by the steel.

Such methods demand extreme care, unerring judgment, and a readiness to meet any emergency on the part of the engineers. The American bridge-builders who carried out this undertaking had several exciting incidents. The most thrilling and anxious was when one of the pontoons got out of control with its precious freight and became stranded on the bank, where it had to remain in a dangerous listing condition until the tide rose again, to enable it to be floated off and towed to its destination.

In comparison with the New South Wales railways, the lines of the other States lack outstanding features, yet their work has been attended with peculiar difficulties. In South Australia, where settlement has not proceeded so rapidly as in the adjacent State, the policy is to build the lines with the minimum of cost to meet the demands for cheap railways to connect communities scattered over a large area. That this is a remunerative practice is borne out by results. Although the wide gauge of 5 feet 3 inches is adopted on what may be called the trunk lines extending from Adelaide to the eastern border, to effect junction with the Victorian railways, thereby securing through railway communication between Adelaide and Melbourne without change of carriage, the greater part of the railway system is the narrow gauge of 3½ feet.

The railway thus acts as a pioneering campaigner in the fullest sense of the word, and in this way it has been possible to push the iron road towards the heart of the rich inland country so far as Oodnadatta. Queensland is practising the same principle, three lines having been forced slowly towards the eastern boundary of that State in three roughly parallel lines from three different points on the coast—though the latter in turn are connected. In due course the inland ends of these lines will be joined up, and there will be a complete circle from which spurs can be driven to meet development.

Railway construction in South Australia is noticeable because of the cheapness with which it is carried out in the first place, with an accompanying economy in maintenance. The whole of the work is effected for the most part by the Government department, small contracts for construction only being let on rare occasions. This policy, combined with the application of every modern appliance which can establish reason for its utilisation, has been eminently satisfactory from every point of view.

At the present time the tendency is to anticipate the settler, and thus, by the provision of transportation facilities, to attract the farmer into the district. The reverse is generally the method adopted—the farmer establishes himself on the land, and then when there is an agitation for transport the railway is advanced. In this State, however, the railway creates the situation, and in this manner a large area of good agricultural land has been opened up for cultivation. This is the policy which Mr. James J. Hill followed in the western United States, and its soundness in the course of time is demonstrated conclusively from the enormous traffic which flows over his systems.

In order that this pioneering may not saddle the South Australian Government with an unremunerative heavy debt, the line in the first instance is of the lightest possible description. As the country traversed develops and more traffic accrues to the road, rendering improvement advisable, the track is overhauled and relaid with heavier metals, the lighter rails being shipped to another point to enable the pioneering process to be continued.

This is an elastic system eminently adapted to such a country as South Australia, which is still in its infancy, and where the demand for railway communication is confined almost entirely to agricultural requirements and to the transportation of farming produce, especially in the more remote up-country districts.


CHAPTER XV THE IRON HORSE IN AUSTRALASIA II

Whereas the Southern Australian and Queensland railways are called upon to meet the demands of agriculture, the roads of Western Australia, on the other hand, have been laid out to satisfy the extensive mining movements along the western shore of the island continent. The engineers, however, have not been called upon to face particularly stern grapples with Nature, owing to the country traversed being, for the most part, of a give-and-take character, and to there being an entire absence of high mountains and wide, rushing rivers. There is only one chain of hills of any magnitude that has to be crossed by the lines. This is the Darling range, which runs parallel with the coast from near Geraldton to the southern extremity of the country.

In order to gain the gold-fields around Coolgardie, as well as the eastern and southern stretches of the State, the difficulties confronting the engineer in connection with this low ridge were not so great as those prevailing in New South Wales. For instance, only one tunnel, 1,096 feet in length, has had to be bored. Indeed, the engineer seized the opportunity to build the line cheaply to such an extent that the lowest watermark in this respect, bearing in mind the configuration of the country, may be said to have been attained. True, the grades and curvature are heavy, the former running up to as high as 1 in 50 (2 per cent.), while the curves are of 266 feet radius. Some of the most difficult spurs in this range are traversed by the line which taps the extensive coal-fields in the Collie district—the bulk of the coal used in the State is obtained here—where sharp curves of 176 feet radius, and banks rising 1 in 40, have been introduced.