The first railway built in Western Australia was a short line from the coast to Northampton. This was completed in 1879. In those early days the finances of the country were at a very low ebb, and the engineer was forced to carry his track through the hilly country with the minimum of earthwork. The result was that curves so sharp as 88 feet radius were adopted.

The Upper Darling Range railway also deserves more than passing notice. It leaves Midland junction at the foot of the hills, and 10 miles from Perth. The precipitous character of the spurs so puzzled the engineer that he was driven to imitate the method of extrication from a difficulty of this description practised in New South Wales. He had to “zigzag” the line up the face of the bluff. Another feature of interest is on the spur from the eastern railway, known as the Smith’s Mill branch. A deep cut had to be driven through a hill, which the excavators, when they set to work, found to be a solid mass of pipe-clay!

Though the engineering trials on the railways in this State may not compare in calibre with those in other countries, there is one other difficulty which is far more significant from the railway’s point of view. I refer to the question of water supply. On the coast, where the rainfall varies between 15 and 40 inches per annum, this does not occasion any apprehension, but rain becomes scarcer and scarcer as the great interior deserts are approached. This condition prevails along a belt 150 miles or so wide, extending from Albany to Geraldton. When the discovery of gold at Coolgardie, some twenty years ago, sent a wave of excitement round the world, the miners and others who rushed to the El Dorado suffered terribly from the dearth of this indispensable commodity, and when the mines were set to work it hampered operations to a very pronounced degree. In the gold country the rainfall does not exceed six inches per annum, and consequently water had to be husbanded carefully.

The mining activity, however, brought about a remarkable expansion in the iron road, which pushed inland for nearly 600 miles. Then the water question became one of vital importance, because the locomotives required copious and frequent drinks to slake their tremendous thirsts. To bring this article up from the coast was costly. The scanty rainfall was collected so far as possible by impounding, but the water thus secured was found to be useless for the railway’s purposes. It became so heavily charged with deleterious substances, as it flowed over a salt-impregnated soil, that it set up heavy incrustation in the boilers.

This was a serious drawback, because it reduced the life of the engine’s internal organs very materially, and militated against the iron horse’s efficiency. To remedy this state of affairs, the earthen dams constructed at various points along the route, which formed small reservoirs, were supplemented by condensing plants. The most notable installation of this description was completed at Coolgardie. This plant was designed primarily to utilise the salt water from the adjacent mines. The Coolgardie condenser was capable of supplying about 60,000 gallons of fresh water per day, at a cost of 37s. 6d., or say $9 per 1000 gallons, and to furnish this requirement entailed an expenditure of £15,000, or $75,000, on the apparatus. A large distilling apparatus was set up also at Geraldton to supply the Northern railway running into the Murchison gold-fields, where the water question was also a serious factor.

THE ENTRANCE TO THE TUNNEL, 1,096 FEET LONG, THROUGH THE DARLING RANGE

This is the only tunnel on the West Australian Government Railways.

While this palliative met the situation up to a certain point, it was far from satisfactory. Consequently, a few years ago a huge project was evolved to supply the Coolgardie gold-fields with unlimited quantities of excellent water. A large dam was thrown across a rift on the western slope of the Darling range about 20 miles from Perth, whereby 4,600,000,000 gallons of water are banked up. The water is dispatched from this reservoir to the gold-fields 350 miles away through a pipe 30 inches in diameter, which is sufficient to ensure the inhabitants in the gold country receiving a steady and continuous supply of 5,000,000 gallons per day. At intervals along the line large intermediate tanks are provided, together with pumping plants. As the pipe-line runs alongside, and the pumping stations are situate beside the railway, the latter can now secure ample supplies of pure water, so that the Eastern Gold-fields railway is concerned no longer with troubles in this direction.

THE DEARTH OF SUITABLE WATER WAS THE SERIOUS PROBLEM IN THE EARLY DAYS OF THE COOLGARDIE GOLDFIELDS. AS THE RAILWAY COULD NOT HAUL SUPPLIES FROM THE COAST, THIS NOVEL CONDENSING PLANT WAS ERECTED

The above photograph shows one-half of the installation. In this way 60,000 gallons of fresh water were supplied per day at a cost of 37s. 6d., or $9, per 1000 gallons.

Great activity is being displayed now in opening up the country in suitable districts alongside the main line, where fruit-growing can be practised with distinct success. These agricultural roads are built lightly in the first instance to reduce capital outlay, the average cost being about £1,200, or $6,000, per mile, but these lines will be replaced by heavier metals as the land becomes settled.

The Western Australian railways now extend for about 2,500 miles through the State, and, in addition, private enterprise is represented by the Midland Railway Company, which runs from a point 10 miles out of Perth northwards for 276 miles to Walkaway, whence Geraldton is reached by a Government line. In addition, there are numerous short roads belonging to companies working the resources of the country, especially of timber, but one and all have adopted the narrow 3½ feet gauge so as to secure uniformity and intercommunication. Bearing in mind the undulating and easy nature of the country, railway constructional costs have not been heavy. On the trunk lines outside the Darling range the cost has varied from £3,000 to £4,000—$15,000 to $20,000—per mile, according to the distance from the coast. The heaviest expenditure was incurred in traversing the Darling Mountains, where the expenditure ranged between £4,000 and £7,500—$20,000 and $37,500—per mile.

During the past few years the question of building an Australian trans-continental railway has been brought to the fore, the idea being to link up the railways on the eastern, with those on the western, sides of the continent. Such a railway would be of far-reaching strategical importance, and Lord Kitchener, during his visit to the Antipodes, urged its necessity. The proposal comprises the connection of Kalgoorlie in the Coolgardie district with Fort Augusta in the neighbouring State of South Australia, whence Adelaide, Melbourne, Sydney and Rockhampton on the Queensland coast could be reached by rail from Perth. To complete such a scheme would entail the crossing of the edge of the Victoria desert, but as the physical character of the country does not offer any great difficulties, it is estimated that the 1,070 miles of line could be built for £5,000,000, or $25,000,000.

When the States were federated, Western Australia, feeling that it was cut off from its sister States, concluded that if it co-operated to form a homogeneous commonwealth, the construction of a trans-continental highway would follow as a matter of course. This anticipation caused the western state to throw in its lot with the other territories. Western Australia for a long time previous had cherished the idea of connecting itself physically with the east by means of the iron road, but it was not financially in the position to undertake the project unaided. Still it authorised one of its engineers, Mr. John Muir, to run through the country it was intended to traverse, and to report generally upon the feasibility of the scheme.

The journey undertaken by this engineer gives an interesting sidelight as to the task of surveying a new road in Australia, especially in the lesser-known hinterland. Mr. Muir organised a small party, with camels as the vehicles of transport. The beasts numbered twelve in all, five being utilised for riding purposes and the remainder as pack-animals, carrying the restricted requirements for the little party. They set out from the most easterly point to which the Western Australian railways had penetrated in the requisite direction. Leaving the gold-field country, they entered the great Victoria Desert. Water was the one difficulty they apprehended, for they knew from the experiences of various explorers in this arid belt that this commodity could be found only here and there. The camels, consequently, were restricted to short rations—one drink every five days, the party carrying sufficient of the liquid to meet its own needs during the intervals. The animals evidently did not appreciate these strict regulations, because the party, whenever they left a water-hole, had the greatest difficulty in persuading the camels to continue the journey, and even when they did resume the trail the beasts frequently stopped to turn their heads longingly in the direction of the last water station.

This small party covered 1000 miles, collecting valuable data, which, upon return, was investigated searchingly and compared with the information that other travellers had gathered when piercing the country at different times. As a result a comprehensive scheme was drawn up, and the possibilities of such through communication were revealed in no uncertain manner.

Some years later the Commonwealth sanctioned the completion of a more exhaustive survey, Mr. H. Deane, M.INST.C.E., formerly engineer-in-chief to the New South Wales railways, being placed in charge of the whole undertaking. The enterprise was divided into two sections, the Federal Government undertaking to complete the task from Coolgardie to the eastern frontier of Western Australia, while South Australia decided to complete the work so far as it affected its own territory. Mr. John Muir, who had been through the country previously for the Western Australian Government, was selected by the chief engineer as first lieutenant on the former division, and he enrolled four other surveyors.

For this task no less than 91 camels were acquired. Of this total 36 animals were deputed to haul three team-wagons, a like number were subdivided into three strings of pack-animals, three carried stakes for locating the line, while the others were used for various purposes. An important task was the distribution of stores to the extent of 18 tons along the route for the survey party, together with ample supplies of water for both man and beast, the water stations being spaced at intervals of 7 miles.

To plot the route the chief surveyor set out ahead of the main party. He ran the line by the aid of a compass, and checked his work by means of stellar observations. The last camel in his train was required to haul a heavy bullock-chain, the free extremity of which was knotted, and as this dragged over the ground it left a trail which could be picked up and followed easily by the main party following in the rear. The latter measured the distance by chains and took levels at frequent points, and these were checked constantly. This survey party moved forward at the rate of 6 miles per day, and it covered the Western Australian section of 455 miles in 89 days.