The Railway Conquest of the World
As quickly the news flashed from Göschenen to the Airolo portal to cease work, since it was decided that the last blast tearing away the final thickness of rock should be the occasion of great jubilation. The whole country was excited. Officials hurried to the scene, and the countryside from far and near flocked to the two mouths of the tunnel. There was no sleep for any one in the constructional camps that Saturday night. The men were in a perfect state of frenzy. In the darkness the preparations for the culminating move were hurried forward. It was arranged that as the men on the Airolo heading had first pierced the last partition of rock, they should have the honour of blowing the gap which would afford access from one side of the mountain chain to the other through its base.
At seven o’clock on the Sunday morning a train started from each end laden with invited guests to witness the final operation. Amid many huzzas they disappeared into the dark, yawning mouths of the great bore. When each party reached the heading the machines were already at work. Only a foot of rock stood between those who had journeyed up from Airolo and the others who had travelled from Göschenen. The distinction of making the breach a thousand feet under the village of Andermatt nestling in the sunshine on the mountain slopes, and with the little lake of Sella 3000 feet above one’s head, was given to two Piedmontese workmen, Neccaraviglia and Chisso, who had toiled in the Cenis, and afterwards in the Gotthard, since its very commencement. The last charges were rammed home, and at 11.45 on the Sunday morning eight rumbling detonations heralded the piercing of St. Gotthard. Ere the smoke had cleared away the men sprang forward. There was the final breach, about three feet in diameter. Engineer Bossi sprang through the gap, and emotionally embraced his confrere on the other side, followed by his workmen, who shook hands with their comrades. It was a strange scene in the depths of the Alps, and the wild vivas of those assembled, to the memory of Louis Favre, reverberated weirdly down the shaft on either side.
The excavations of the works to the full dimensions and the lining up of the last section proceeded with great rapidity, and on May 22, 1882, amid great festivity, the tunnel was declared open. It had taken ten years to complete, but had Favre been left to his own devices, and had he not been exposed to financial harassing and intrigue, and had not his successor Hellwag been driven from his post, it would have been finished in the time the engineer contemplated. At that time Favre’s skill, pluck and unflagging devotion to his task were not appreciated, but recognition of his genius was afterwards extended by the erection of a monument to his memory at the Airolo entrance to the tunnel. It is safe to assert that it was due to his enterprise and grim determination in the face of adversity that the St. Gotthard tunnel became an accomplished fact, and resulted in the reduction of the journey between Northern Europe and Italy by thirty-six hours.
In addition to the tunnel, 172 miles of line had to be built to connect the Swiss with the Italian railway systems. From the body of this frowning clump 31,800,000 cubic feet of rock were torn by means of 2,200,000 pounds of dynamite.
The remaining sections of the railway named after the tunnel abound in interesting features from the technical point of view, the most notable, possibly, being the remarkable spiral tunnels to which reference has been made, and the successful application of which in this instance has been reproduced upon other railways where similar conditions prevail. The best examples, possibly, are those by which the Biaschina gorge is negotiated, since here there are two of these tunnels side by side, the railway almost describing a figure 8 in corkscrewing from one level to the other. Exclusive of the Gotthard, there are no less than 76 tunnels and galleries, aggregating 29 miles, as well as 1,384 other structures, 324 being bridges and viaducts over 39 feet in length. In one stretch of 7 miles, in skirting the south-eastern arm of the Lake of Lucerne, the railway passes through 9 tunnels, ranging from a mere 85-feet burrow to others 6,512 feet in length. Among the Gotthard fastnesses the railway work becomes bolder, the bridges are lofty, while the line zigzags in a remarkable manner. It is a case of tunnel, cut and bridge all the way. Up to 1880, when the railway was finished practically, constructional work provided regular employment for 10,757 men.
So rapidly did the volume of traffic upon the railway swell, however, that it became extremely difficult to handle it, as there was only a single line, except in the tunnel and at one or two other points. The provision of another track became imperative, and in 1886 it was commenced. This was not a simple matter, as the new work had to be carried out without interrupting traffic in any way—that is, so far as the main through service was concerned. With the exception of the Gotthard and four smaller tunnels, all the other structures had to be excavated out to carry the second pair of metals, while, similarly, all bridges had to be increased in width. In order to finish the work as rapidly as possible, the task was divided up into a number of small, separate contracts, each covering a few miles. Vehicles for the conveyance of constructional material were provided and supplies were hauled free of charge by the railway, while explosives for blasting were sold at cost price.
The most difficult works were carried out by the company itself by its own engineers and labour. In this comprehensive widening system over 100,000 cubic yards of rock which had been excavated from the St. Gotthard and dumped in the vicinity of Airolo were reclaimed, to be used in the building of embankments, revetments and retaining walls. The tunnel widening was carried out almost exclusively at night and on Sundays, since the smoke from passing trains would have impeded such work during the day. The quickest methods of widening were adopted, and in the approach to the Bristen tunnel an excellent expression of this is afforded. Instead of trimming back the mountain-side to provide space for the second pair of rails, a gallery was built projecting from the mountain and supported on heavy masonry pillars, giving the appearance of a colonnade.
In the handling of unavoidable night trains an elaborate protection system was adopted in connection with the tunnels, to prevent disaster to the trains themselves or to the working gangs. No trains were permitted to enter a tunnel until assurance had been made doubly sure that there was no constructional train standing on the only line to court collision, and that the workmen were safe. Each working squad was covered amply by electric and other signalling devices. Similarly, all metallic structures that required moving were handled on Sundays, when traffic was at its lowest ebb, between the scheduled movements of passing trains, so that the latter might not be delayed. It was estimated that this work would occupy nine years, but in reality it was accomplished in five and a half years, and the total cost of widening the whole mileage to a double line was only £500,000, or $2,500,000.
CHAPTER IV THE RAILWAY INVASION OF CANADA
The news of the victory of Stephenson’s “Rocket” in the historic railway locomotive contest at Rainhill on the Liverpool & Manchester railway in 1829 scarcely had filtered round the world, when the idea of transporting passengers and merchandise by steam power along two parallel rails occupied the earnest attention of enterprising spirits in Canada. They realised that the new method of locomotion was certain to play an important part in the opening up of British North America. As a result of deliberations, a small body of prominent business men in Montreal applied for a charter to construct a railway from La Prairie to St. John’s in the province of Quebec, which was granted in 1832 under the seal of William IV.
It was an unpretentious enterprise, for the projected line was only some fourteen miles in length. It was named the Champlain & St. Lawrence railway, the idea being to link Lake Champlain, whence New York could be reached by water, with the St. Lawrence. The first section of the line was opened in 1836, though it was not operated by steam. The rails were of wood, and the vehicles were hauled by horses. This system obtained for only one year, however. The first winter sufficed to demonstrate to those concerned with the enterprise that such primitive methods were far from satisfactory. Consequently the “wooden flanges,” as the rails constituting the track were called, were torn up to make way for iron rails, and the steamengine took the place of the animal motor.
A year or two later the objective of the promoters was attained. Lake Champlain was brought into communication with the St. Lawrence at Montreal by a railway some fifty miles in length, the inland sheet of water being tapped at Rouses’s Point at the head of the lake in United States territory. It is stated that Jay Gould, who afterwards became one of the greatest railway-builders and magnates in the United States, gained his first insight of the construction of railways upon this line, by being associated with the location survey. From this humble beginning was woven the huge railway network of Canada, which now gridirons the country in all directions, and aggregates some 25,000 miles.
Other projects were formulated in rapid succession for a comprehensive invasion of the eastern corner of the country. Foremost among these was the Grand Trunk Railway Company, conceived in 1852, to build a trunk road between the Atlantic seaboard and the Great Lakes, which at that time was practically the western commercial limit of the Dominion. It was an English enterprise, and, moreover, was strongly imperial from the sentimental point of view, for it was planned to thread Canadian territory entirely.
The famous firm of railway constructional engineers, Messrs. Peto, Betts & Brassey, fresh from their triumphs on the Continent, were willing to carry out the work. They had an extensive accumulation of plant lying idle, and at the time were seeking for fresh worlds to conquer. Canada presented just the opportunity they desired, and they were ready to provide all the railways that Canada would require for some years to come. The faith in this firm of constructional engineers was so great that British financiers were open to provide any amount of money that might be required.
The negotiations were prolonged, as rival interests opposed the scheme vehemently. The preliminaries passed through many vicissitudes, but the compact between the English financiers and the Canadian authorities was ratified and sealed, at last, for the construction of a main line between Montreal and Hamilton, a distance of about 373 miles, which the Provincial Government undertook to finance to the extent of £3,000, or $15,000, per mile. Hamilton was selected as the western terminal point because therefrom another line extended to the Lakes, while a railway was creeping up from Portland on the Atlantic coast to Montreal. By the construction of this central section, 964 miles of through continuous railway would be provided for the benefit of the population.
But the undertaking proved to be one of the most difficult that the engineers, despite their wide and varied experience, had been called upon to fulfil up to this time. The country traversed was very sparsely populated, the forests were dense, and in winter, under the combined adversities of snow, ice, and intense cold, the situation was terrible. Labour was scarce, wages were high, and material was found to be expensive. In the end it was found that the average cost per mile approximated £8,000, or $40,000, so that to link Montreal with Toronto entailed an expenditure of £2,664,000, or $13,320,000. Moreover, it was one of the largest contracts that the engineers ever had carried out, while the physical conditions harassed them to such an extent that when they balanced up their books they found they had incurred a loss of about £1,000,000, or $5,000,000. The wide gauge of five feet six inches was adopted, and this factor developed into as keen a bone of dissension in Canada as it did in Great Britain, and as in the latter country it was finally abolished, so in Canada it was abandoned in favour of the standard gauge of four feet eight and a half inches, though the conversion cost the Grand Trunk railway a matter of £1,000,000 ($5,000,000).