As tunnel-boring operations upon such a scale as this were in their infancy, this engineer-in-chief perforcedly had to break a great deal of new ground; to carry out considerable pioneer work. Hitherto, the usual tools at the service of the excavators were the pick-axe, shovel, chisel, and sledge-hammer; but such implements as these in a work of this magnitude were akin to forging a mighty crank shaft with a blacksmith’s hammer. New forces had to be created. The Mont Cenis had demonstrated this fact, and in the course of its realisation a new tool appeared. This was the mechanical percussion rock drill, operated by compressed air at a pressure of 112 pounds and upwards per square inch. To furnish the requisite energy to the tools elaborate air-compressing plants had to be laid down. These were designed by Professor Colladon, and they were capable of compressing 1,596 cubic yards of air to a pressure of eight atmospheres every minute, the power being stored in huge cylindrical reservoirs, not unlike mammoth steam boilers, from which the conduits extending to the working faces on either side were charged.

The scene in the tunnel was impressive in the extreme. At the working face a little gallery was bored, about eight feet wide by the same in height, at the roof of the tunnel. The drilling machines were mounted on travelling carriages, with their perforating chisels jutting ugly and business-like from the front. With the pent-up force of eight atmospheres behind them, they rapped against the solid rock and slowly but surely made a perforation. At frequent intervals there was a slight stop, the chisel point was withdrawn and a jet of water, drawn from a tender hauled up in the rear, was directed into the hole, when the chisel instantly resumed its monotonous round. At intervals, a chisel, with its cutting edge blunted from continual hammering at the iron-like mass, was taken out, thrown on one side, and another inserted in its place, to continue the attack on the rock. Progress was laboriously slow, or comparatively rapid, according to the nature of the material encountered. When the rock was of a granitic nature, then advance was only at the rate of an inch or two per hour; on the other hand, when soft, clayey material was tapped, then the chisels bored their way at the rate of as many feet in the same time.

THE COMPRESSED AIR LOCOMOTIVE WHICH HAULED WORKMEN AND ROCK BLASTED FROM THE MOUNTAIN IN THE CUTTING OF THE LOETSCHBERG TUNNEL

WHAT THE WORKING FACE IN THE HEART OF THE MOUNTAIN IS LIKE

The gang and drills cutting the path for the line through the Loetschberg Tunnel recently completed.

BORING A GREAT ALPINE TUNNEL

Photo by E. Goetz, Lucerne]

THE LOFTY AMSTEG BRIDGE, 184 FEET HIGH, SPANNING THE MADERAN VALLEY ON THE ST. GOTTHARD RAILWAY

Three men attended to each machine, and by means of levers and wheels the height of a drill could be adjusted to a nicety. Movement was difficult, for the space was cramped. In the murky gloom the outlines of the men could be faintly discerned. The fitful glimmer of the oil-lamp which each carried—electric lighting had still to be invented—fell upon their semi-nude bodies and swarthy faces. The streaming perspiration mingling with the grime and dust, which strayed over their skin in fantastic streaks, gave the men a fiendish appearance. The temperature was that of an oven. As the men drew nearer and nearer to the heart of old Gotthard, the heat rose until the men laboured in an atmosphere of 90° or more. The only sounds were those of the hammering of the drills as they bored into the rock, and the hissing of the escaping air after it had completed its allotted task in operating the chisels.

At long intervals there came a heavy silence. The holes had been bored to the requisite depth. The machine was drawn far back into the boring. Explosives were slipped into the holes and tamped home. From a safe distance the charges were fired. A dull, smothered roar, a rending and crumbling, and another gap was torn in the bowels of this monarch of the Alps. The excavators hurried forward, cleared away the tumbled debris, and brought the lumbering drill carriage up to the fresh working surface.

Day in and day out, week after week, month by month, this round continued. It was monotonous, and the work was hard. The stifling atmosphere and the conditions told severely on the physique of the workmen. Congestion of the brain, irregular action of the heart, anæmia, or one of numerous other obscure maladies, was the reward for their labour. Their faces assumed a deathly pallor; working in cramped positions gave them an unsightly stoop, and deprived their legs of movement, so they tottered rather than walked as they returned from the scene of their toil at the end of the shift.

The pay was wretched, ranging from half-a-crown to five shillings (from 60 to 125 cents) per day of eight hours, out of which they had to board themselves! Needless to say, but few Englishmen or western Europeans figured on the pay-roll, for none would accept such starvation pay for such terrible work. The labourers were Italians for the most part, and yet nearly one and all, by subsisting on miserable food, consisting for the most part of a kind of meal porridge, cheap and yet limited in quantity, saved a part of their earnings and sent it home to their needy families in sunny Italy. The average number of men employed was about 4000, half at either end, but at times it ran up to as high as 7000. The mountain claimed 310 lives, killed by accident alone, and 877 injured, before it was conquered; but, considering the conditions, it is remarkable that the casualty roll was not heavier.

In the wake of the small heading gallery came the other gangs. These rigged up the timber and other supports to the roof and excavated the small opening to the full dimensions of the tunnel. Last of all came the masons, setting the masonry lining, from 18 to 30 inches thick, in position, for the tunnel is lined throughout. In passing through the granite rock there was but little fear of a collapse of the roof, but in the treacherous clay advance had to be made warily, and heavy timbering resorted to, in order to prevent the soft soil caving in and burying all in its sticky embrace.

The material for the headings and lining, as well as the workmen and tools, were carried to and fro upon a small railway, the locomotives of which were driven by compressed air—steam was impracticable, because it would have fouled the workings; while on the short distance between the inner end of the railway and the working face haulage was done by horses. The privations suffered by the navvies was only equalled by those experienced by the animals, the mortality of which ran up to as high as twenty-five per cent. of the number employed.

Water was a constant menace, and at times retarded progress seriously. On the south side it was particularly troublesome. Time after time the drills or detonating charges would tap one of these subterranean streams, and the water would pour out in a cascade. These rivulets were of varying volume, but in one stretch, where the rock was extremely friable, it was considered too dangerous to use the mechanical drilling machine, so the men had to cut their way forward by hand. In so doing they released a vast underground pocket of water, which rushed out at the rate of over 3000 gallons per minute. At one spot it was only by superhuman effort that headway was made, for the men were half submerged in these torrential outbursts, escape from which was only possible by penetrating farther into the mountain.

In 1876 another terrible calamity overtook Louis Favre. It was discovered suddenly that the railway, far from costing the estimated sum, would approximate over £11,500,000, or $57,500,000. Somebody had blundered, and badly too. A deficit of over £4,000,000, or $20,000,000, appeared certain. What was to be done? The development of such a contingency never could have happened at a more inopportune moment. Times were hard; money was scarce; financial crashes loomed in every quarter of the Continent; and, to make matters worse, war was raging. Never in the history of engineering had such an extraordinary and unaccountable mistake been made in the estimates.

The discovery came as a thunderclap. The stock of the company ran down like a thermometer plunged into ice. Those who had supported the enterprise in the face of hostile criticism began to doubt the wisdom of their optimism. A gloom settled everywhere. It appeared as if the gigantic achievement would become numbered among the great unpaid; would be another contribution to those unfinished enterprises characterised as follies.

But Monsieur Favre kept going. There was the daily penalty staring him in the face if he did not finish within time. Any prolonged delay spelled ruin to him and to those who had financed his task. To make matters worse, the Swiss departments who had the most to gain from the completion of the railway steadfastly refused to extend the slightest assistance.

Matters reached a crisis. Either the money must be found, or that already spent must lie buried in the mountain. An International Conference was called to consider the situation, where, as prominent cities and railways who hoped to reap something from the completion of the tunnel promised support, Germany, Switzerland and Italy agreed to increase their subventions. Much of the projected work originally contemplated was postponed indefinitely in order to reduce the first cost.

This readjustment of the financial situation enabled work to be resumed energetically. But Favre was harassed sorely still. Payments for work became irregular, and every possible obstacle that could be placed in his way was forced to the front by intriguing opponents. Efforts were made even to create a rupture between him and the International Society, but Favre’s unflagging perseverance and determination resisted all such machinations, and he plodded along resolutely.

However, these worries and his feverish anxiety to succeed in his enterprise told upon his health. He never lived to see his great achievement completed. On July 19, 1879, while inspecting the progress of the work at the headings, he was seized with an apoplectic fit, to which he succumbed in a few hours. Literally in harness, this guiding spirit and clever engineer passed beyond the veil when the tunnel, the crowning effort of his life, was rapidly approaching completion.

His mantle fell upon his right-hand assistant, M. Hellwag, an accomplished German engineer, and he pushed forward the scheme with an energy characteristic of his late chief. But friction again rose. Swiss engineers were jealous of this appointment, and at last in sheer disgust the new engineer-in-chief threw up the work. He was hounded from his post, despite the fact that on another section of the railway he had overcome ingeniously the negotiation of sharp ascents within short distances, which otherwise appeared impossible, by the invention of a spiral tunnel, wherein the railway burrows into the mountain side, describes therein a complete circle, and emerges again immediately above the portal by which it entered.

On Saturday, the 27th of February, 1880, while the workmen on the Göschenen side were tearing the vitals out of the peak, they were surprised to find large masses of rock falling about their ears without any effort on their part. They stopped. The situation seemed uncanny. They listened intently, and then heard the familiar sound of a muffled roar, indicating blasting in the heading. The workmen on the Airolo side were upon them. Terrified lest the next concussion might bury them beneath a mass of rock, they hurriedly retreated and waited. Presently one espied the point of a chisel ploughing through the rock towards him. He grasped its extremity, but as quickly dropped it, for it was so hot that it burned his hand. Frantically these men rapped upon the last remaining wall of rock to inform their comrades on the other side that they were through. With lightning-like rapidity the news flashed through the Göschenen workings that the men from the Airolo side might be seen at any minute, and that the task of eight weary years was consummated practically.