NO. 2, “THE TORONTO,” THE FIRST RAILWAY ENGINE BUILT IN CANADA BY JAMES GOOD IN 1853

Photo by courtesy of Pennsylvania Steel Co.]

THE NIAGARA CANTILEVER RAILWAY BRIDGE UNDER CONSTRUCTION

It was built round the suspension highway bridge so as not to interrupt communication between the two banks.

Yet in building this line the contractors set up an engineering monument which for years ranked as the “eighth wonder of the world.” Montreal was on the north bank of the St. Lawrence, while the link connecting the metropolis with the Atlantic seaboard followed the southern bank of the river. The two sections of line were interrupted by the rolling waterway, which at this point is nearly two miles wide. The spanning of this gap, so as to bring Montreal into direct railway touch with the coast, had been one of the great obstacles to the incorporation of the railway in the first instance, but Messrs. Peto, Betts & Brassey undertook to forge this link. At that time it was so formidable an undertaking as to be thought absolutely incapable of realisation. Indeed, when a suggestion for bridging the St. Lawrence at this point was advanced for the first time, it was laughed to scorn.

“THE EIGHTH WONDER OF THE WORLD”

The wonderful tubular bridge, 6,592 feet long, built by Ross and Stephenson across the St. Lawrence River to carry the Grand Trunk Railway into Montreal.

THE BRIDGE AS RECONSTRUCTED

The continuous tube carrying a single track was converted into an open truss girder bridge to take two sets of metals, tramway line, road and pavement.

However, its construction constituted a vital part of the contract. Accordingly, the contractors lost no time in attacking the undertaking when they secured a foothold in the Dominion. The river was surveyed minutely up and down for a considerable distance, while detailed soundings were made to discover the extent and nature of the foundations requisite for the piers. After infinite labour a suitable site was discovered, and a great measure of credit for the location is due to Alexander M. Ross, who was one of the engineers to the undertaking, George Stephenson acting as consulting engineer. Ross carried carefully prepared and detailed plans of the structure he had formulated to his coadjutator in England, and Stephenson admitted, when first submitted to his notice, that “the idea was certainly startling.” However, he complimented Ross upon his daring, and as the latter engineer had won his spurs in England before he departed to Canada on behalf of the group of capitalists financing the Grand Trunk railway, his work received greater consideration from the eminent engineer than might have been the case otherwise. The result was that when Stephenson went to Canada to consider the subject on the spot he concurred with Ross in the general scheme, and the design was elaborated conjointly.

When the location was settled definitely, the project was assailed vigorously by bridge designers in America, but this animosity was inflamed from the fact that they had prepared alternative proposals for bridging the waterway at a different spot. The rival engineers emphasised the danger from ice, and commented strongly upon the risk, in fact serious danger, arising from this cause, to the full brunt of which Stephenson’s bridge would be submitted. Some critics even went so far as to state that the structure never would be completed, or if so, would come down under the first packing of the ice. Stephenson, however, treated his American detractors with contempt, and, to the mind of the latter worthies, appeared to fly deliberately in the face of Fate by concurring with Ross’s recommendations. That was nearly sixty years ago, but the piers have given no sign of collapsing yet.

The resident engineer and superintendent of the constructional work, Mr. James Hodges, realising the monumental character of the undertaking—for it was a larger bridge-building scheme than ever had been attempted up to this time—spent many hours together wrestling with difficulties as they developed, for the unexpected confronted them at every turn. The ice was one of their greatest perplexities, because during the winter the river is frozen so solidly that it will support the weight of a train, and, indeed, a track has been laid across the waterway in winter to maintain communication between the two banks. When the ice broke up, the floes became jammed and piled against the temporary works around the piers in an inextricable mass to such an extent that it demanded unremitting vigilance to guard against a collapse of the dams under the enormous pressure exerted upon them.

The depth of the river and the current were two other factors which had to be taken into serious consideration, for some of the piers are sunk in twenty-two feet of water, while the velocity of the current is about seven miles an hour. The working season was very short, averaging about twenty-six weeks during the year, and during this period every available man had to be crowded on to the work. When construction was in full swing, between 2000 and 3000 men found employment.

Photo by permission of the Pennsylvania Steel Co.]

THE MAGNIFICENT SINGLE SPAN BRIDGE ACROSS THE NIAGARA RIVER BELOW THE FALLS

Length of span, 550 feet; height above 226 feet.

The bridge consisted of a huge rectangular tube, similar to that spanning the Menai Straits, carrying a single track. From end to end it measured 6,592 feet by 16 feet wide, 18 feet in height, and weighed 9,044 tons. It was divided into 25 spans, 24 of which were of 242 feet each, while one was of 330 feet. The piers were built massively in masonry, the stone being obtained from quarries in convenient proximity. The ironwork was prepared in England, each piece being marked carefully for its position in the structure. The bridge had a gradual slope upwards from either bank to the centre, where the height from the bed of the river to the top of the tube was 108 feet. For its erection 2,250,000 feet of timber were required in connection with the temporary work, the piers and abutments demanded the use of some 3,000,000 feet of masonry, and 2,500,000 rivets were used to secure the component parts of the ironwork together. In addition to the bridge proper, some 2,500 feet of approaches on either side had to be fashioned, so that the total length of the work was 9,144 feet. The contracted price for the structure was £1,400,000, or $7,000,000, but it was completed for £100,000 ($500,000) less. Of this total the masonry and temporary work absorbed,£800,000, or $4,000,000, and the ironwork £400,000 ($2,000,000).

A VIEW OF THE IRON TUBE, 2,290 FEET IN LENGTH AND 23 FEET IN DIAMETER

THE 2000 H.P. ELECTRIC LOCOMOTIVES HAULING THE “INTERNATIONAL LIMITED” THROUGH THE TUBE

The “link that binds Two Great Nations,” the St. Clair Tunnel, under the St. Clair River.

While the work was in progress the railway company found increasing traffic, as the sections of completed line were opened, so emphasised the urgency of securing through communication across the river that the contractors were approached, and a bonus of £60,000 ($300,000) was offered to them if they would complete the work a year earlier than was stipulated in the contract. The engineers redoubled their efforts, and on December 17, 1859, the great bridge was opened, though the official ceremony took place five months later, when King Edward VII, then Prince of Wales, opened the Victoria Bridge, as it was christened, in the name of Queen Victoria, during his visit to the Dominion.

Stephenson died before his great work was completed. For a quarter of a century or more it constituted one of the sights of the North American continent. As the country became more settled and the volume of traffic flowing to and fro across the river increased, the railway experienced a very great difficulty in handling it over a single line. At last the inadequacy reached such a point that some improvement was imperative. A second bridge would have been too costly, and after considerable reflection it was decided to replace the tubular bridge by one of larger dimensions.

A minute examination of the existing structure was made, and it speaks volumes for the work of Stephenson and Ross, as well as of the contractors, that the bridge appeared as sound and as fit for another century or more as it did on the day it was first opened. The piers had been built so solidly that they did not show the slightest trace of the terrible buffetings and pressure to which they had been subjected by the ice during some fifty winters.

Consequently it was decided to remove the tubular structure and to erect in its place an open truss bridge, 66 feet 8 inches wide, carrying a double track, a roadway for an electric tram-line, space for vehicular traffic, and a pavement for pedestrians. The engineers designing the new structure came to the conclusion that the striking stability and condition of the masonry piers would carry the new bridge with but slight alteration. As a result of this conclusion it was decided to erect the new structure around the old bridge, cutting away the latter span by span, so that there was no interruption to the train service.

This appeared to be a simple expedient, but when the engineers commenced operations on Stephenson’s handiwork they found that it was built of far tougher material than they had expected. The rivets defied withdrawal, so excellently had they been driven home, and one of the engineers showed me one of these securing pieces, which he had preserved as a memento of British handiwork of some seventy years ago. As a matter of fact, as he related, it was far easier to build the new structure than it was to destroy the old, and the cutting away of the old tubular bridge span by span was found to be an exceedingly laborious task.

However, it was achieved, and there was not the slightest interruption in the traffic, which testifies to the skill and care with which the engineers laid their plans. Nor was it attended by any untoward incident, though what might have proved a terrible accident was averted very narrowly during reconstruction, as was related to me by one of the engineers. It was Sunday morning, and they were rebuilding the central part of the bridge. Special men had been stationed at each approach to the bridge, and elaborate instructions had been drawn up for controlling the passage of trains by flag-signalling. Sunday was selected for the most difficult portions of the work, as on that day the trains were few and far between.

On this Sunday morning the work had advanced so satisfactorily that the old tubular span had been removed, and there was a wide gap in the continuity of the ironwork carrying the metals, showing the murky river swinging along at a merry pace below. Everything was ready for completing the new span, when one of the engineers, happening to glance shorewards, observed a train entering the bridge and coming along at a brisk speed. Something had gone wrong; the flagman had misunderstood instructions or had given a wrong signal. The train was speeding to its doom, for there was the yawning gulf. But the engineer never lost his presence of mind. Realising the situation, he threw down his instruments, and ran along the track towards the advancing train waving his arms frantically and yelling like one bereft. The engine-driver, unlike the majority of his ilk on an American railway, concluded that something must be amiss, and applied his brakes sharply, pulling up a short distance from the brink of the abyss. It was a narrow escape; had the engineer hesitated a minute, disaster swift and sudden would have overwhelmed that train.