Incalculable mineral wealth lies buried in the hearts of these peaks, and it was the discovery of this rich storehouse of Nature that led to the opening up of the country by the iron road. There was a gold rush in 1859, followed by a silver strike, and Leadville was one of the first towns to spring into existence in the wild scramble for sudden wealth. Though this locality nestles in the range some 70 miles distant, the pioneer miners braved perils and privations untold to gain this hub, and the town sprang up as if by magic. But the isolation of the situation, and the lack of transportation facilities soon became manifest to an acute degree. Every ounce of material had to be carried to and fro from the outside world by wagon, mule-pack, or manual effort, involving an exhausting, slow and expensive journey through deep gulches and over broken mountain trails.

The cry for a railway was raised, but it was difficult to find pockets sufficiently deep or capitalists so plucky as to finance such an undertaking. However, constant agitation maintained for years bore its fruit. A small company was formed, and the Pueblo & Arkansas railway was commenced. The promoters shrank somewhat from the project, fearing that construction would run into such a prohibitive figure as to bring ruination in its wake, so they resolved to spend the minimum amount of money on the scheme. To this end they decided to follow the easiest route available, and suggested the course of the Arkansas River from Pueblo into the mountains, and then at a convenient point to strike into the range to make the ascent to Leadville. Yet those half-hearted financiers had visionary dreams, and were spurred on by a certain amount of ambition. They did not intend to come to a dead-end at Leadville, but once they had gained the higher level, to push right across the Continental Divide to Salt Lake City, and thence to the Pacific Coast. Some thirty years passed by, however, before the latter part of the project was completed.

Though the course along the Arkansas River was selected as the cheapest and easiest route, the preliminary surveys sufficed to demonstrate that even that location would offer difficulties out of the ordinary. The 9½ miles run through the Royal Gorge, one of the natural wonders of North America, promised a heavy struggle. This defile at places is 2,700 feet deep, and the walls rise up so perpendicularly as to defy the slightest foothold to a chamois, let alone a railway. The bottom of the gulch was found to be occupied by the turbulent waters of the river, which in times of flood lapped the base of the mountain wall on either side, though at normal level a narrow shelf was exposed at the foot of one cliff.

The engineer responsible for the building of the line, Mr. A. A. Robinson, decided to seize that shelf. It could be made just wide enough to carry the line and no more, while it could be raised sufficiently to escape the ravages of high water. The river was kept within bounds by a wall of rough, heavy masonry carried to a point well above the highest watermark, and on this the track was laid upon a bed of rock ballast hewn from the mountain slopes.

However, when the eastern portal of the ravine was gained a serious obstacle loomed up. The ledge which the engineer had pressed into service up to this point disappeared abruptly into the water, and did not reappear for some distance beyond. The two sides of the canyon, towering up to nearly 3000 feet, come closer together, leaving only a narrow vent barely 30 feet wide. As a result the river channel is constricted, and the water thunders over the boulders through the wedge-shaped defile with the velocity of a cataract.

The engineer was brought to a full-stop. How was he to span that gap? The character of the torrent absolutely prevented any possibility of sinking piers in the waterway to carry a bridge across the breach in the ledge. Nor could a path be carved out of the mountain-side to carry the line around the obstacle, because the maximum gradient had been attained already on either approach to the gap.

As Mr. Robinson related, the first solution that occurred to his mind was to tunnel the shoulder, and thus to avoid the difficulty completely. But the bogey of expense stood in his way. There were scarcely sufficient funds available to build a surface line, and, under these circumstances, tunnelling was quite out of the question. Moreover, it would have required considerable time, and the public was clamouring wildly for the completion of the line.

He haunted the gorge for days, and spent much midnight oil in the hope of discovering some simple, quick and cheap means of solving the problem. But the quest seemed hopeless. Then suddenly it occurred to him that, as he could not hope for assistance from the river-bed, why not force the walls of the ravine to his aid? In short, why not sling a bridge from the cliff faces on either hand?

Thereupon he evolved a plan to throw heavy iron girders in the manner of rafters across the gulch, to anchor their ends to the solid rock, and then to suspend the bridge carrying the metals from this structure in such a way that one side abutted against the wall. The more he pondered, the more convinced he became of its practicability, despite the fact that it was something entirely new to railway engineering.

Being intimately acquainted with the late Mr. C. Shaler Smith, who at that time was one of the foremost consulting bridge-engineers in the country, he communicated his plans to him. The consulting engineer was interested, and arranged to accompany the designer to the site to judge the feasibility of the scheme at first hand, and after acquainting himself with the prevailing conditions. As a result of this investigation, Mr. Smith concurred in the method of spanning the gap, and there and then the arrangements for carrying out the work were commenced.

It was realised that the task was somewhat delicate, and Mr. Robinson accordingly entrusted the preliminary operations to Mr. J. O. Osgood, who was appointed Division Engineer on this section of the railway. Mr. Osgood carried out the whole of the surveys for his chief personally to facilitate the accurate design and details of the whole structure.

THE RAILWAY TWO MILES ABOVE THE SEA

The Denver and Rio Grande at the summit of Marshall Pass. The sinuous route of the line may be followed for miles.

The surveyor related to me that when he first entered the canyon no one had ever traversed the gorge at that point, except on the ice, for the simple reason that it was impassable. Nor could one get across by clambering along the rock face where the line was to go, as it was too steep. The situation was first reconnoitred from all practicable points of vantage. Then, in order to complete the essential preliminary work, he caused a narrow pathway—nothing more than a ledge, from 12 to 18 inches in width—to be hewn in the cliff above the site, from which he made his final surveys.

A “DOUBLE-HEADER,” CLIMBING THE CLIFF OF ANIMAS CANYON ON THE DENVER AND RIO GRANDE RAILWAY

The cutting of this path in itself was a tedious task, and gave some idea of the labour that would have been involved in tunnelling the rock. This narrow shelf, however, proved of inestimable value in handling the heavy overhead members of metal and setting them into position. The dimensions and weight of the latter had to be kept as low as possible to facilitate handling under the peculiarly cramped conditions. Actual erection was exciting and hazardous. The men had to be lowered by ropes and had to ply their tools while swinging in mid-air or when clinging to precarious footholds. However, the cumbrous overhead pieces were successfully set in position, the ends were bolted to brackets sunk deeply into the cliff faces, and from these girders the track floor was suspended, the ends resting on the solid edges of the rocky ledge, while one side was bedded against the wall.

Such is the story, as communicated to me by the engineers, of the origin and erection of what ranks as an unparalleled novelty in engineering. The “Hanging Bridge” was built in the Royal Gorge nearly 30 years ago, and although the first structure has been replaced by one of larger and heavier dimensions to accommodate weightier trains, the fundamental principle is precisely the same as conceived by Mr. Robinson.

Yet the “Hanging Bridge” is but one of many engineering wonders to be found on this railway. Go where one will over its 1,800 miles of track among the Rockies, and some striking and daring work confronts one at every turn. Here the railway threads its way through a winding abyss, there it passes over the crown of a towering peak, or toils laboriously up the side of a sheering cliff. No two miles are alike. In all it traverses five yawning canyons, each possessing a strange individuality, and crosses the mountain backbone by which the continent is split in twain by three different passes. Level sections are practically unknown. It is one continuous up-hill pull up the one, with a long coast down-hill with steam shut off, on the other, side—a switchback upon a stupendous scale.

Let us take the route over the Marshall Pass. At Poncha, on the Atlantic side, the line is at an altitude of 7,480 feet. The summit is six miles away by the iron road, but in that distance the train has to climb steadily at 211 feet to the mile over an extremely meandering route. The mountains become wilder and more broken as the summit is approached. The engineer took advantage of every natural facility that opened up to him. In turn the rail crawls along ledges cut in the mountain flanks, over lofty embankments, spidery trestles, doubling and redoubling upon itself in the most amazing manner. The occasional presence of snow-sheds draws attention to the fact that the metals are above the snow-line, and the many terrible dangers to which the track is exposed from avalanches and landslides.

Two huge engines are required to negotiate the heavy ascent, and at last, when the top is attained, the train is 276 feet in excess of two miles above the Atlantic on the eastern, and the Pacific on the western side, respectively. The tortuous path of the iron road is revealed below in a graphic manner. It may be seen in no less than four separate terraces, rising in steps one above the other, the lowest being almost invisible, connected by huge loops, until it finally winds away and is lost in the dim haze of the horizon. The descent is a replica of the ascent—the same gradient prevailing, viz. 211 feet to the mile. No steam power whatever is needed to drive the train. It is travel by mere gravitation alone, held in check by the powerful air-brakes.

Yet the railway is crossing the Divide at another point some miles to the north rises twice to an altitude exceeding 10,000 feet. This is on the extension of the original line from Pueblo to Leadville, where, after leaving the mining town, there is a tedious climb to Fremont Pass, where the track is laid 11,330 feet above the sea. A few miles to one side the line attains its maximum altitude, with 11,522 feet, at Ibex station, on a short branch road. After negotiating the Pass there is a sharp descent to Leadville junction, where another locomotive has to be hitched on to haul the train up a bank, rising 211 feet to the mile, to the summit of Tennessee Pass, lying at 10,240 feet, the highest point being gained in a tunnel, one mile in length, bored through the mountain peak.