BY RAILWAY TO THE KLONDIKE—THE WHITE PASS AND YUKON LINE UNDER CONSTRUCTION

Laying the metals at the head of Lake Bennett, showing construction camp.

The engineer decided to keep his grades as easy as possible, but during the course of 15 miles through the mountains he found very quickly that this was no easy matter. He had to gain the summit of the pass, an altitude of 2,888 feet, in this distance, and it was found quite hopeless without a climb of 1 in 15. Much of the country lying in his path never had been trodden by man. Below the snow-line it was covered thickly with virgin forest, tangled undergrowth and dead-fall piled up to a tremendous height, through which the men had to axe their way at a snail’s pace. Above the line where timber ceased to thrive cliffs rose up sheer, with their faces so polished by the Arctic gales and weather as to be as slippery as ice and affording no foothold whatever. In order that the workmen might gain a purchase for the wielding of their tools, huge logs were slung down from convenient heights, held in position by massive chains attached to iron dogs driven into the rock, and on this flimsy foothold the men were compelled to prosecute their tasks as best they could.

THE DISMAL TRACT OF SWAMP AND RIVER THROUGH WHICH THE ALASKAN CENTRAL RAILWAY MAKES ITS WAY

One of the most complex difficulties was in regard to the bringing up of provisions and stores for the men, and the requisite material for the railway. The base of supplies was over 1000 miles away, every ounce of necessities having to be brought up by water from Seattle or Vancouver. The little army was cut off entirely from the outside world, news of which could be gleaned only when a boat called at Skaguay. The absence of telegraphic communication was a deficiency which was felt the most sorely. The post, intermittent and uncertain, as there was no regular service, was the sole vehicle of communication. Consequently extreme care had to be observed to preserve a continuous stream of the material required. The omission of this or that entailed a delay of anything from ten days upwards.

At one point a lofty granite tooth 70 feet wide and 20 feet thick sheered up in front of the engineer to a height of 120 feet. He neither attempted to go round nor through the obstacle. He brought up a squad of expert drillers, and soon they were engaged in honeycombing the base of the cliff with deep holes. Charges of explosives were rammed home, and when detonated the whole crag, a crumbling mass of rock, rattled down into the ravine. The pedestal of this cliff was then smoothed off, and thereon the sleepers and metals were laid.

By dint of prodigious effort, continued without intermission both day and night the whole week through, without even a respite for Sundays, the engineer succeeded in carrying the railway forward for a distance of 40 miles and over the summit of the pass in a single season. Such an achievement in the face of the abnormal difficulties encountered, in such a short space of time, was indeed memorable.

Satisfied with this result, the engineer called a halt. His men were in dire need of rest, and as there was no object in exposing them unduly to the rigours of the terrible winter now that the back of the task had been broken, constructional work was suspended for a few months. But it was not a period of complete inactivity. He had planned his work for the following summer, and during the winter months he pressed the snow-covered country into service for the erection of his constructional camps, the disposition of building material, provisions and stores at convenient points over a long distance ahead.

One cannot help admiring the perspicacity of the man identified with this peculiar enterprise. When he sought financial assistance to further his scheme he argued that directly the railway had negotiated the summit, remunerative traffic would develop. So it proved. Confident in these anticipations, the guiding hand had ordered considerable rolling-stock to be hurried to Skaguay while his graders were forcing their way to the summit, and when the pass was overcome a service was inaugurated.

Yet it is doubtful if the engineer scarcely expected the results that were experienced. The adequacy of his rolling-stock over the first 40 miles was tested to breaking point. The pack-trail over the pass was abandoned as quickly as a candle is extinguished by a gust of wind when the first train was announced. The miners braved the elements, pitiless cold and dazzling snow, no longer. From the railway to-day one can still see decaying evidences of a bygone bustle and activity attending the trek of the first prospectors and pioneers to the Klondike in the falling shacks and huts scattered along the trail, which before the advent of the iron horse were centres of life and revelry, but which to-day are wrapped in forlorn desolation. Scarcely a person enters or even passes their doors now.

So soon as the winter broke, the engineer brought his forces to the front once more. The line skirts Lake Bennett. White Horse, on the head waters of the Yukon, some 72 miles ahead, was the objective, and the engineer was determined to reach that inland terminus that season by hook or by crook. As the line skirts Lake Bennett, and this sheet of water is navigable, he decided to use it temporarily until White Horse was reached, the railway consequently being resumed from the head of the lake. This was a justifiable course, inasmuch as the building of the line along the waterside would have occupied considerable time owing to physical characteristics, while it was imperative that White Horse should be reached without delay.

The coming of spring saw the graders regirding themselves for another wrestle with the rock and gravel. Before they had gone very far the edge of a lake was gained. Its banks were precipitous and did not lend themselves to a feasible track. An ingenious solution of the problem was essayed. The engineer decided to lower the level of this sheet of water by some 14 feet and to build his grade on a shelf which surveys showed there would be exposed. To this end he cut a small outlet. But as the vent was driven through soft soil and totally inadequate to resist the pent-up force of the escaping water, the latter widened the breach into such a deep and wide channel that the lake was lowered by no less than 70 feet! This result opened up a new difficulty, escape from which was only practicable by the erection of two large bridges spanning the rift left by the receding waters. As a result, the line does not run round the lake as planned originally, but cuts directly across its bed.

When at last the metals were laid into White Horse and the Yukon River was gained, the engineer retraced his footsteps to push ahead with the last link around Lake Bennett, so that through rail connection between the coast and the Yukon River might be possible that year. This was a heavy piece of work owing to the indentation of the lake-shore and the number of crags that dropped into the water. But by blasting away the faces of the promontories to fashion a narrow gallery upon which to lay the track, and by dumping the rock shivered by the explosives into the bays to form embankments, an easy alignment was secured.

Although the railway overcomes mountains running up to a height of 7000 feet, only one tunnel was found to be necessary. Curves are numerous and sharp, so that the line describes a sinuous route among the peaks. Although on the ascent of the mountains from a point 5 miles out of Skaguay grades of 1 in 25 were found unavoidable to gain the summit, the descent on the opposite side is much easier, for the difference in level of the White Pass summit and White Horse summit, 91 miles beyond, is only 808 feet. However, the line between these two levels is built for the most part on forced grades.

Bearing in mind the character of the country traversed, where lofty peaks and steep precipices alternate with deep gorges and wide clefts, it is obvious that such a railway as this could not be completed without recourse to heavy bridging. In all there are 11,450 lineal feet of such structures. There are seven steel bridges, one of which, just before the summit is gained, is 400 feet in length, with the centre 215 feet above the bottom of the gorge.

Taken on the whole, labour was not so difficult a problem in Alaska then as it is to-day, despite the remote situation of the constructional work, for reasons already explained. The enterprise found employment for about 35,000 men, and it speaks volumes for the care exercised in regard to their comfort and welfare, that only 35 men met their deaths through accident and disease, notwithstanding the high pressure with which work was maintained. The men for the most part were far more intelligent than those generally identified with such work.

To illustrate the extreme fascination that gold exercises over these prospector-navvies, one incident is worth relating. The men were driving the grade with great zest, quite contented with their lot, because the majority had tasted the bitterness of ill-luck at the Klondike. One day news trickled into the camp of the discovery of a new goldstrike not far distant in British Columbia. It galvanised the labourers like electricity, awoke all slumbering ambitions and re-erected all the castles in the air which Dawson had dispelled so ruthlessly. A solid phalanx of 1,500 men threw down their tools and clamoured round the pay-office of the engineers for their wages due to them forthwith. Not having received any premonitory warning of this development, the engineer inquired what was the matter, thinking that possibly a “strike” was being nursed. As the wages were paid the men stampeded off to see if Fortune could be wooed any more easily at Atlin than she could be won at Klondike.

As the railway was pushed through hurriedly while the Klondike gold fever was at its height, some of the work was of a temporary character, but once the communication was established the whole line was overhauled. Timber trestles and bridges were replaced by heavier substantial metallic structures, and the earthworks were strengthened. To-day the road compares with any to be found on the continent. The service is daily, except Sundays, and the line is patrolled regularly for boulders or avalanches which may have crashed down the mountain-sides, to come to rest on the track, and which form fearsome obstructions to a train. In winter it is kept open by means of the rotary snow-ploughs. This is no easy task, for the blizzards among mountains of the north are ferocious in their severity. Drifting snow often fills the cuttings to a depth of 35 feet or so. Two locomotives harnessed to one of these snow-clearers generally contrive to force a clean open passage through the fleecy mass, however. It may be pointed out that this railway possesses the largest type of narrow-gauge engines in the world, the engine and tender in working order turning the scale at 106 tons. Travel from our point of view appears somewhat expensive, since it averages 1s. or 25 cents per mile.

The total cost of constructing and building the railway amounted to £850,000, or $4,250,000. The most expensive section was that from Skaguay to the White Pass summit, this first twenty miles involving an expenditure of £400,000, or $2,000,000. In the first season after completion, however, its gross receipts were £800,000, or $4,000,000, 25 per cent. of which was absorbed by working expense.