This was the Brandt rock-drill, a wonderful appliance which in one stroke displaced incalculable manual labour. The tool is operated by water pressure, and the drill ploughs its way into the rock under a rotary movement in much the same manner as an auger forces its way through a piece of wood. The water pressure brought to bear upon the drill is tremendous, ranging from 1,400 to 1,680 pounds per square inch, and even the hardest rock scarcely can resist its attack.
But, as may be supposed, at times the hard texture of the rock played sad havoc with the cutting edge of the drill. Occasionally three or four drills were put out of service with every yard of advance, and even then progress was painfully slow. When, however, soft rock was encountered the tool cleaved its way through very rapidly, the cutter biting half-an-inch or more into the material with every revolution. Then it was found possible to speed up the rotations to as many as seven or eight per minute, with proportionate increase of life for the cutting edge.
Precisely what this Brandt drill signified to the engineers in connection with this tunnel may be gathered from the fact that from the time drilling commenced, in 1880, only four years elapsed before communication was established between Bluden on the one and Innsbruck on the other side of the range. In this short period a passage 26 feet high by 23 feet wide was cut through solid rock for a distance of 6⅜ miles at a total cost of £1,500,000, or $7,500,000. In comparison with the two previous enterprises of the same character this was a magnificent achievement. The Cenis tunnel, 7½ miles in length, occupied some 13 years to complete, while some 8 years were required to drive 9¼ miles through the St. Gotthard. This was an achievement of which those engaged in the task were justly proud. Indeed, the Austrians hold a unique position in the rapidity with which they can drive these gigantic undertakings through the most formidable mountain chains.
The section of railway upon which this tunnel is situated sorely tried the ingenuity of the engineers up to the Paznaun valley. The line clings to the mountain-side, which is broken up by precipitous crags, and these either had to be pierced or blasted right away to provide a path for the railway. Gushing torrents pour madly down these slopes, and had to be spanned by noble and lofty viaducts or bridges. At some places the boiling waters are deflected from their bed into an artificial channel built of concrete; at others there are massive retaining walls to prevent the waterways from breaking bounds and sweeping the embankment away. One wide gorge is bridged by a single iron span 393 feet 8 inches in length. This is the Trisanna viaduct, below which the glacial brook tumbles over the boulders at a depth of some 262 feet. Elaborate precautions also had to be adopted to protect the line from the ravages of avalanches and landslides.
Years before the Arlberg line was contemplated, however, some distinctly noteworthy achievements in engineering had been placed on record by the establishment of railway communication between Vienna and Trieste on the Adriatic Sea. Certainly the line did not follow the shortest route between these two points, but it must be borne in mind that it was undertaken in the early ’forties, when Great Britain, “the home of the railway,” only possessed some 840 miles of line, and railway engineering was quite in its infancy. It is little wonder, therefore, that the engineers of the project in this wild corner of Europe followed a circuitous path, to avoid fearsome obstacles as far as practicable. They resorted to sharp curves and heavy banks, and the line doubled and redoubled in the most amazing manner. Bridges and tunnels were introduced very freely, some of the viaducts spanning deep clefts on the mountain flanks being very lofty.
By the most direct route of this system the journey from the Austrian capital to Trieste occupies nine hours. In that journey, comparatively no longer than that entailed in speeding over the greater distance separating London from Edinburgh, one passes through four distinct expanses of scenery. Vienna nestles in a broad valley flanked on all sides by the towering snow-topped Alps. The line, upon leaving the capital, first traverses the undulating foot-hills, then wends its way through the mountains to gain the richly wooded, verdant and beautiful country of Styria, and finally passes over a vast stretch of wilderness to descend abruptly to the coast.
In forging this link in the railway chain the engineers had to overcome the Semmering range, which is amongst the most tumbled in the whole of the Austrian Alps. How did they do it? By following the natural facilities open to them: a ledge here, a gallery there; passing from this slope to that by a viaduct or bridge; zigzagging up the mountain slopes; tunnelling through rocky eminences; following winding paths for miles merely to gain points only a mile or two apart in a straight line. No doubt if that line were built to-day it would have its length cut in half, for railway engineering has advanced by leaps and bounds since 1848, when this pioneer project was taken in hand.
In carrying their scheme to fulfilment these early engineers unconsciously achieved one notable distinction: they built the first mountain railway. What matter if banks did assume a rise of 132 feet or so per mile, and the line did wander in apparent aimlessness among the peaks? Speed then was not the vital consideration it is to-day, while traffic was comparatively light, so that the haulage facilities were not taxed severely.
This mountain climb on the main line occurs between Gloggnitz and Murzzuschlag, the famous winter sporting centre in the Tyrol. The mountain crest is 4,577 feet above the sea-level, but the railway does not rise to that height; its summit is at 2,940 feet in the middle of a tunnel three-quarters of a mile in length beneath the Semmering Pass. But to gain that altitude from either side of the mountain entailed prodigious work. Pick, shovel, and gunpowder made heavy cuttings through projecting spurs, raised lofty embankments, filled gaping fissures, and cleaved galleries out of the solid rock. The two points on either side of the mountain are only fourteen miles apart in a straight line; by the railway it is more than twice the distance, the outstanding features which were necessary to render the undertaking un fait accompli being fifteen tunnels, and a score of viaducts and bridges. To construct the thirty miles over the Semmering cost a round £2,000,000, or $10,000,000, in money, and occupied between three and four years to complete.
THE WORKMEN CUTTING AND BLASTING A NARROW PATH ON THE STEEP MOUNTAIN SLOPES FOR THE KARAWANKEN RAILWAY
With the march of time, however, the traffic over this railway increased, hand in hand with the expansion of Trieste, to such an extent that it proved inadequate. A more direct route between the capital and the port, as well as accelerated communication with the great centres of Europe, was demanded by the commercial community. This agitation became so insistent that at last the government was compelled to move, and the engineer of the Imperial Railways was commissioned to survey the country for the purpose of devising some scheme which would satisfy the public outcry.
THE MASSIVE STEEL BRIDGE WHICH CARRIES THE RAILWAY ACROSS THE DRAVE RIVER TO APPROACH THE TUNNEL THROUGH THE KARAWANKEN RANGE IN THE BACKGROUND.
THE NORTHERN ENTRANCE TO THE KARAWANKEN TUNNEL.
Five miles in length, through the Karawanken mountain chain.
This was no easy task. Innumerable knots of mountains break up the country between Vienna and the Adriatic, and they are compressed so tightly together that the narrow valleys between offered but slight assistance towards the solution of the problem. Then, again, those three well-known mountain ranges, the Tauern, Karawanken, and Julian Alps, stood right in the way, disputing any possibly shorter route than that already in existence.
The prospect before the surveyors was not very promising. However, they braved the elements among the inhospitable peaks, suffered extreme privations and fatigue as they toiled up and down the rugged, wild mountain slopes with their instruments, for month after month. At last they succeeded in formulating a project which was submitted to Parliament. In this it was proposed to make avail of any favourable stretches of existing railways which intersected the valleys in all directions, and to connect them together, so that in the end a tolerably direct route might be obtained. At any rate this proposal would reduce the journey between the Adriatic and Munich by at least eleven hours. The scheme was divided into four broad sections. It was discussed thoroughly in Parliament, but in the end it was decided to carry out in the first instance the most essential parts of the project, because embarkation upon the undertakings as set forth by the engineers would have entailed the expenditure of a gigantic sum of money. Even that which was sanctioned represented a total financial commitment of about £30,000,000, or $150,000,000, for 211¼ miles of line.
The accepted enterprise was memorable because it entailed the piercing of three mountain ranges by tunnels 5¼, 5, and 4 miles in length respectively. Of the total mileage only 41¼ miles were to be level! The remaining 170 miles represented banks, with grades running as high as 132 feet to the mile.
The project as sanctioned was divided into three sections for constructional purposes. The first section is that known as the Pyrhn railway, which connects the main line between Vienna and Switzerland via the Arlberg tunnel at Linz. From this point a short branch line ran directly southwards through the Krems valley to Klaus, having been built for tourist purposes. It was decided to overhaul this spur to bring it into conformity with the conditions of a main line, and to build the new line onwards from Klaus.
From Auspoint, which is at an altitude of 1,563 feet, the line makes one continual climb, climb, to the Selzthal terminus, nearly 40 miles distant. The average rise ranges from 70 to 132 feet per mile to overcome the Pyrhn Pass, beneath which a tunnel nearly 3 miles in length was bored. This tunnel, however, is only one of many, for there are numerous short burrows through shoulders and crags. Nor are the bridges a whit less majestic. The Steyr River is crossed by a lofty single masonry arch, and again lower down by an iron suspension structure, while the Teichl is spanned by a single-span lattice steel bridge. The loftiness of these structures is an outstanding characteristic. The rivers at the points in question have cut their beds at a great depth below the banks which constitute the railway level. Swerving bends are also conspicuous, for the railway continually swings from one side of the valley to the other.
The construction of the Pyrhn railway, however, was simple in comparison with the other links of this chain of communication. At Klagenfurt, south-east of Vienna, commences the Karawanken railway, so named because it pierces the difficult mountain range of that name. The stretch is only 19 miles in length, but the country proved to be so broken that only 4 miles of level track could be introduced, and those in the vicinity of the stations! Throughout the remaining 15 miles the railway is really a gigantic switchback.