The Railway Conquest of the World
The locomotive “Little Wonder,” despite its age, for it dates back from 1869, completely justifies its appellation, for it handles the above load on the steepest grades with ease, and attains a speed of 30 miles an hour where the physical conditions are suited to fast travelling. The work it has to fulfil is not to be despised by any means, for the country through which the line extends is amongst the most rugged in the country. In the course of the thirteen and a quarter miles it has to overcome a difference of 700 feet in altitude, which means a pull against the collar for the whole way from Portmadoc, though the gradients are of varying severity. Yet even the easiest climb is 1 in 186, while the steepest rise is 1 in 68.6; with a bank of no less than 1 in 36 on one of the spur lines. The curves likewise are startling in their sharpness and frequency, and at times when the engine is loaded to its utmost capacity the train may be seen writhing like a gigantic black snake along three curves at the same time.
The permanent way was originally laid in 1839, the enterprise having been carried out for the conveyance of slate from the quarries to Portmadoc. On the downward journey the laden trucks travelled by gravity, the empties being hauled back by horses. In the late ’fifties, however, the chief engineer, Mr. C. E. Spooner, realising the far-reaching advantages arising from the use of power, suggested that the tramway should be converted into a railway, and in 1863 his suggestion was adopted. In the early days travelling was exciting, for the bridges and tunnels were so low that the engine-driver, stoker and other officials on the line had to duck their heads when they reached these obstacles, since to stand upright in one of the vehicles was certain to court a violent end by collision with these structures. These, however, have been altered so that one need entertain no more apprehension concerning safety on this line than when travelling upon a standard-gauge road. Visitors, realising the fact that by its means they could be conveyed comfortably to some of the wildest and most beautiful corners of the Principality, sought its transportation assistance, and in 1864 passengers were first carried as an experiment, but free of charge. The Board of Trade did not decline to sanction its operation in the interests of the public, but possibly somewhat dubious of the wisdom of their action, hedged in the privilege with certain restrictions, the most important of which was limitation of speed. When, however, it was proved that there was no danger in travelling over this two-foot line at 30 miles an hour this latter ban was removed.
The line possesses several features of technical interest, and being a single track, is operated upon the staff system, with every device to secure absolute safety in operation in the form of signalling and telegraphing facilities. Moreover, travelling is comfortable, for although the gauge is less than two feet, the cars, designed by the engineer, are built on the bogie principle and have seating accommodation for fifty passengers. A trip over the line certainly constitutes an experience.
The complete success which attended the conversion of this railway from equine- to steam-power in 1864 stimulated the wider adoption of the narrow-gauge system, though as a rule this term is somewhat elastic, inasmuch as it signifies that such a railway has a gauge less than the standard width of 4 feet 8½ inches, and is particularly associated with the 39 inch or 42 inch gauge. Still several “two-foot” lines were laid down, especially in France and India, so that the Festiniog experiment has proved a very profitable “toy” to more countries than one. In fact, not far distant from the pioneer toy railway is another—the North Wales Narrow Gauge railway—which connects Dinas, near Carnarvon, with Snowdon Station.
These railway systems, however, are of short length, and when one remembers the broken character of the country which they serve, their raison d’être is obvious. But the application of the idea to a trunk line 360 miles in length appears quite impracticable. Yet it has been accomplished, and its realisation has opened up a corner of Africa which formerly was almost impassable, and which, but for its fulfilment, would have left the country traversed in the hands of hostile natives.
This “toy” railway upon a large scale is the Otavi Line, which connects Tsumeb, buried 368 miles in the heart of the wilderness of German South-West Africa, with the coast at Swapkomund. To-day it ranks as the longest narrowest gauge line in the world, the metals, as in the case of the Festiniog railway, being laid only 600 millimetres, or approximately two feet apart.
In the late ’eighties prospecting parties who had heard of the mineral wealth lying dormant in this inhospitable and inaccessible country, set out to ascertain whether rumour could be verified to a sufficient extent to ensure the riches of the rocks being exploited commercially. They suffered great privations and hardships in their toil across the waterless veldt, but when they gained the Otavi country they found that their journey was more than repaid by enormous discoveries of copper. They collected detailed information concerning the extent of these deposits, and when they returned to Europe it was decided to develop the new “Copperado” without further delay.
However, there was one critical point. How could the mineral, after being mined, be transported to the coast for shipment. The intervening country was among the most sterile to be found in the continent south of the Sahara. The mining companies concerned at once suggested a railway as the only solution of the problem. But they realised very readily, from the reports of their emissaries who had ventured to Otavi, that such an undertaking was beset with difficulties innumerable, while the construction of a line upon the standard gauge would prove ruinously expensive. In order to secure extrication from their plight the companies approached the firm of Arthur Koppel of Berlin. The latter company dispatched a corps of its own surveyors to the country to spy out the desert between the coast and the mines, in order to find the best location and to report generally upon the engineering features of the scheme.
When the surveyors returned to civilisation they unhesitatingly recommended a light narrow-gauge railway, such as they had built in several parts of the world where similar conditions prevailed. They advocated the 600 millimetre or two-foot gauge because it not only would meet all traffic requirements for many years to come, but its initial cost would be so much cheaper, and it could be built so much more quickly than a wider or standard gauge. The recommendation was debated at great length, and after discussing the relative estimated capital and operating costs of lines of different gauges, the overwhelming advantages presented by the “toy-line” gauge were found to outweigh any arguments that could be raised against it. The mining companies merely demanded the line as a link between the copper country and the coast for their own purposes. The country lying between the coast and the mines held out no attractions for any economic development, so that all the requisitions likely to be made by the mining companies could be met adequately by such a railway. Consequently the recommendation of the engineers was accepted, and they were entrusted with the completion of the undertaking.
BUILDING THE OTAVI LINE THROUGH THE GERMAN SOUTH-WEST AFRICAN BUSH
Hereros, Ovambos and Italians working side by side.
When the mining companies expressed their decision they did not anticipate the extraordinary traffic which the railway would be called upon to fulfil a little later. These were duties which not only taxed the capacity of the diminutive railway to a supreme degree, but were of a character which justified the confidence of the engineers and practically saved the colony to the German Empire.
THE PASSAGE OF THE FIRST TRAIN, GAILY DECORATED FOR THE OCCASION, OVER THE “TOY-LIKE” OTAVI RAILWAY
This reproduction of the Festiniog toy railway was commenced without loss of time. In 1903 constructional engineers with a boat-load of constructional material were dispatched to South Africa, and the grade was commenced from Swakopmund, at a point 40 feet above the sea-level, the location extending in a north-easterly direction to Otavi, 300 miles distant in the interior.
The first sod was turned in October, and the constructional engineers bent to their task with great zest. But scarcely had they got into their stride when the Hereros rebellion broke out. This was an unexpected development, and as the natives had been recruited in large numbers to build the permanent way, the engineers were faced with a grave situation. At the first signs of the insurrection the greater majority of the natives threw down their tools and stampeded from the line to their towns and villages to take up arms. The Governor of the colony strove to arrest this wholesale desertion by recourse to drastic measures—he seized as many men working on the grade as he could and placed them safely under lock and key. The result was that the little band of white engineers was left with scarcely a navvy to assist them.
However, they struggled on as best they could, but progress was painfully slow. At first the insurrection was belittled—regarded as a flash in the pan—and the engineers anticipated confidently the early return of their workmen. But these illusions were dispelled rudely when it became realised at last that the country was up in arms from end to end. There was only one way out of the desperate situation, and that was to import labour from Europe. Such a step upset the preliminary estimates for the undertaking to a pronounced degree, for the native labour had been taken into the calculation when framing the cost of the work. To bring white labour from Europe increased the capital outlay very appreciably. However, there was no alternative, and accordingly an Italian contractor arrived on the scene with a small army of 300 Italians, and work resumed its former busy aspect.
However, peace did not reign for long. The Italian workmen saw that they held the advantage over the engineers, that there was no competitive labour, and accordingly they struck for higher pay. The engineers, caught on the horns of a dilemma, had to surrender, and the Italians picked up their tools. Then another cause of dissatisfaction manifested itself. The workmen concluded that they were being driven too hard, so they declined to perform a full day’s labour. They held the whip-hand and emphasised its potency so frequently, and the friction between employers and employed became so keen, that it appeared more than once as if the contract would have to be suspended until the rebellion was quelled.
While these disputes and continual bickerings were at their height further complication was provoked. The German military authorities, finding the subjugation of the Hereros a far heavier task than they had anticipated, wished to penetrate into the heart of the country so as to strike a supreme blow upon the enemy’s stronghold. They had their own line extending from Swakopmund to Windhuk, but owing to its heavy grades and light construction it had broken down completely under the strain of the heavy military traffic. The authorities strove to alleviate this situation by utilising bullock-carts to transport troops and commissariat up-country, but this alternative failed lamentably. This service was so slow, and the absence of water by the wayside was felt to a serious degree. In their extremity the German Government appealed to the engineers of the Otavi line. They besought them to spare no effort to drive the railway forward speedily, first to Ouguati, 109¾ miles from the coast, and then to Omaruru, 145 miles beyond the former point. As an inducement the builders were offered a heavy premium.