It is worth while to recall that it was on the low-level part of this section to Petropolis that the iron horse made its first appearance in South America. The short length of line, representing about 13 or 14 miles, between Maua and Raiz da Serra was the first stretch of railway to be laid and used on the continent south of the Equator.

A STEEP BANK SHOWING THE CENTRAL RACK RAIL

TRAIN ON THE RACK SECTION OF THE PETROPOLIS DIVISION, SHOWING THE CURIOUS TYPE OF LOCOMOTIVE ADOPTED

HOW THE LEOPOLDINA RAILWAY OVERCOMES HEAVY GRADES

On another part of the system—the line running inland from Nictheroy, on the eastern side of the bay of Rio de Janeiro—the Brazilian engineers were compelled to overcome one of the most searching problems in railway engineering in the world. After traversing forty miles of the level country, the mountain ridge barred their way. They realised that it could be surmounted only by some exceptional system, and the local authorities seized a unique opportunity. The Mont Cenis tunnel, connecting Italy and France, had been bored successfully, and this new steel highway through the heart of the range displaced the construction railway operating on the Fell system which had been laid over the crest of the Cenis range. The Brazilian engineers thereupon approached the Swiss authorities for the purchase of this abandoned stretch of mountain line, and their offer was accepted. Thereupon the Mont Cenis “Fell” railway was torn up, transported to South America, and pressed into service to help the Brazilian engineers over the obstacle that confronted them.

REBUILDING A BRIDGE ON THE LEOPOLDINA RAILWAY

The masonry structure had to be built beside the original iron structure so as not to disturb traffic.

The solution proved completely successful, and the engines fulfilled their task upon the eight per cent. grades with perfect satisfaction for several years. Then the Baldwin Company, of Philadelphia, undertook to eliminate the special locomotives required on the “Fell” system, and to convert the railway to adhesion working. Recalling the fact that for every twelve and a half feet of advance one makes a vertical rise of twelve inches, such a conversion appears remarkably daring, but the experiment justified the transformation, for the adhesion locomotives, notwithstanding the extreme severity of the gradient and the sharpness of the curves, which have a minimum radius of seventy-five feet, have accomplished the work formerly completed by the “Fell” locomotives with equal success. The result is that this represents the steepest length of line upon a trunk railway to be worked by adhesion traction in the world.

The locomotives weigh forty tons, and they are capable of hauling a train weighing forty-five tons on the drawbar up this bank. In comparison with such climbs the “Big Hill” which worried the Canadian Pacific railway engineers for so many years, appears insignificant. The disadvantage of the grade on the latter system was the frequency with which trains ran away down the declivity to enter one or other of the switches or catch-points, which deflected the train or locomotive from the main track and piled it against a bank of earth. Such accidents on the “Big Hill” were nothing to what have occurred on the Leopoldina line. The great difficulty is not in regard to ascending the grade with a load, although there is a possibility of the engine failing to take the hill, and to let its driving wheels spin round idly on the metals without forging a foot ahead. The traffic destined for the interior is comparatively light. The heaviest loads are brought from the highlands to the coast, and consequently the question is to hold the train in check as it descends. Ordinary braking is useless, as, although the wheels may be locked, the whole train is liable to toboggan down the metal slide almost as furiously as if the wheels were running freely. The situation has been met by firstly reversing the engines and letting a small amount of steam into the cylinders sufficient to act as a break, and by retaining the centre rail of the Fell system and to grip it by means of a strong scissors brake. Inasmuch as the engineers are extremely careful when descending the hill, runaways are few and far between.

A FLOOD ON THE LINE

The track is submerged by the torrential rainfall.

A DERAILMENT CAUSED BY THE TRAIN COLLIDING WITH A COW!

CURIOUS TROUBLES EXPERIENCED ON THE LEOPOLDINA RAILWAY

Now and again, however, a train gets out of control, especially when the rails are wet and slippery. To meet this condition of affairs the driver, of course, makes liberal use of sand, but here again the fates are against him, for owing to the sharp curves it is no easy matter to induce the sand falling from the engine’s sand-boxes to drop on the face of, and not between or outside, the rails. When a train does get out of hand on the descent the driver has to trust to luck to gain the bottom of the bank in safety, or to regain control of his charge. Sometimes he succeeds and sometimes he fails. In the latter case derailment generally ensues, with more or less disastrous results. Mr. Dickson had a narrow escape from this danger himself one day. He was carrying out his periodical inspection of the line from his special carriage coupled to a locomotive. In coming down the bank something went wrong, and the train got away. The engineer-in-chief admits that he had an uncomfortably anxious few minutes. He felt the train gather speed, and suffered violent oscillation as the train swung round the bends. Just as he was wondering what would be the end, there was a jump and a crash. The engine had left the track, rolled over, and his car was astride the overturned locomotive. He crawled out of the wreck, badly shaken and bruised, but otherwise little the worse for his adventure, though the unfortunate driver was killed.

AN INTERESTING ENGINEERING ACHIEVEMENT

This 160-feet bridge span had to be erected and pulled into position over rollers.

BRIDGE OVER THE PARAHYBUNA RIVER, SHOWING HEIGHT OF RIVER IN FLOOD AND FORCE OF WATER SURGING ROUND THE PIERS

THE LEOPOLDINA RAILWAY IN BRAZIL

In order to negotiate the third mountain range another solution of the difficulty was adopted. The precipice was so steep that the engineers could not introduce the loops requisite to carry the line continuously from one level to the other. So they had recourse to the switch-back, wherein the line runs down-hill for a short distance to a dead-end. This brings the engine of the descending train to the rear, and by giving the latter a slight push it is sent down another similar switch-back to another dead-end, where the engine is brought once more to the front of the train. In this manner, alternately pulling and pushing, the train gains the bottom or top of the level of the line, according to the direction in which it is travelling. In reality it is a zigzag, similar in character to that which was used for so many years upon the New South Wales railways, as described elsewhere.

Although on the eastern side of the continent the engineer is spared the ravages of snow and avalanches, he suffers from other disturbing elements which perhaps are more to be dreaded. These are floods, wash-outs and landslides. The rainfall in this territory averages between 90 and 100 inches during the year, and when the rainstorms break the downfall is tremendous. The rivers are converted into roaring cataracts, huge cavities are torn in the flanks of the mountains, and enormous quantities of debris are released. Should the line be in the way of such a visitation it suffers severely. It is no uncommon circumstance for a huge gap to be cut in the railway, showing where the tearing water or descending mass of earth has crashed through the track, sweeping everything before it. Nothing can withstand the force of these onslaughts, and although heavy retaining walls of masonry may serve to check their fury, they are not completely successful. The result is that when the rains are expending their violence, the engineer-in-chief is prepared for some heavy repairing work, for possibly 100,000 tons or more of earthen embankment may be demolished.

Then the engineer hurriedly completes a new survey, and replaces the track around the scene of the accident, because reconstruction, as a rule, is more economical and quicker than attempting to repair the injury inflicted.

This, at times, and in a cramped valley, is no easy task, for the curvature has to be borne in mind. Consequently the destruction often precipitates a pretty engineering problem, extrication from which depends upon the engineer’s resources and ingenious ability entirely. There is no doubt that the control of a South American railway, where such conditions as these prevail, imposes a supreme task upon a man’s capacity. Wash-outs and landslips will find the engineer out more quickly than any other emergency, because he is called upon to keep the track going at all hazards, and when a breach does occur, his own enterprise and initiative alone determine the length of the period of interruption to traffic. On such a line as the Leopoldina railway this is a serious factor, because there is a constant heavy volume of produce, especially coffee, maize, tobacco and sugar, pouring towards the coast. During a recent year floods, wash-outs and landslides cost the railway no less than, £24,500, or $122,500. This was a year of abnormal disaster in this direction, but the item generally approximates between £12,000 and £14,000, or $60,000 and $70,000, in the course of the twelve months.

THE BRIDGE OVER THE PARAHYBUNA RIVER AT CAMPOS UNDER CONSTRUCTION

THE PARAHYBUNA RIVER BRIDGE COMPLETED. TOTAL LENGTH 1,113½ FEET

The crossing of this waterway by the Leopoldina Railway created a riot in Campos.

The replacement of the decrepit bridges occasioned Mr. Dickson no little perplexity, but this work became all the more urgent, as the original structures could not withstand the heavier locomotives and trains that were introduced by the British company. One of the most difficult undertakings of this character was the erection of a massive masonry arch bridge in three spans upon the rack system of the Petropolis branch. Each span is of 50 feet, and the work was complicated by being on a curve of 80 metres, or about 266 feet radius. It had to replace a trestle bridge, and reconstruction had to progress without interfering with traffic. Another notable piece of work which he completed successfully was the erection of a single steel girder bridge of 160 feet span across the Parahybuna River. Owing to the velocity of the current and the great depth of water, false-work was quite out of the question, so the steel-work had to be erected on shore, rolled out, and launched into position, being held in check by cables, which proved a trying ordeal owing to the current. When brought into position between the abutments, the steel-work was lifted by means of jacks, the temporary nose was dismantled, and the span lowered until it rested in the desired position upon its supports.