Rapidity in laying the track on the first section was due to the fact that the line traversed an undulating plain where heavy works were not demanded. The climate for the most part was found to be analogous with that prevailing in Western Siberia, the mean temperature in summer hovering about 70 degrees, to fall to about -7.6 degrees in winter. In order that the workmen during the latter season might not be interrupted in their tasks of fashioning the stone-work for the bridges, special workshops were provided, heated with steam and stoves, and similar shelters were built over the sites of erection on the ice, where the workmen were enabled to lay the masonry in comfort. At the same time these measures permitted the cement to dry slowly instead of being frozen, only to fall to pieces with the approach of spring.
As the engineers pushed farther and farther away from the European frontier, the country was found to be more and more thinly settled. Along the line of the Central Siberian railway the average population was one person per square mile, and the majority of these people were colonists who had emigrated from European Russia to practise agriculture in the East, and they were settled for the most part along the postal road to Tomsk.
Under such conditions labour had to be brought from several hundreds of miles to the rear. Huge depots had to be established to house provisions and large camps formed for the employees. Furthermore, thousands of horses and hundreds of wagons were required in addition to sleighs. Roads had to be cut for the passage of these vehicles, and at various points stores of provisions and other necessaries had to be stored in deep pits dug in the ground, and covered with heavy tree-trunks to secure protection against bears and other marauders.
The penetration of the dark and matted primeval forests was terrible. The ground was swampy, and in order to facilitate the advance of vehicles the soft soil had to be rendered firmer by tree-trunks laid down to form a kind of timber road. The men engaged in this essential undertaking suffered extreme privations, not only bodily, but mentally as well. The terrible solitude preyed upon their minds, while the rainfall and entire absence of the rudiments of comfort told upon their constitutions.
In order to facilitate the transportation of the provisions and material from European Russia to the main depots along the line, the great waterways were utilised to the fullest extent. Boats of all descriptions took on these stores at convenient points near the Urals, such as Tioumen, and by traversing the various tributaries of the mighty Obi were able to gain numerous points along the location, where they discharged their cargoes. Thence the goods were dispatched to the scattered depots and camps by road.
When Irkutsk was gained, the first serious troubles arising from the mountains confronted the engineers. The survey showed that the line here would have to describe a huge detour to round the southern extremity of Lake Baikal, a sheet of water as large as England. The country was broken up to an extreme degree, and among other works of a heavy nature involved was a tunnel nearly 12,500 feet long through the Zyrkousounsk mountain chain, which towers to a height of 12,000 feet above sea-level. But the tunnel was only one obstacle which would have to be overcome, for heavy cuttings through rock and big fills to cross depressions were indicated on all sides. Some idea of the outlook was afforded from the estimated cost of this 182 miles of line which was ciphered at £2,700,000, or $13,500,000. As, after compassing the lake, the line swung sharply north-eastwards to gain Myssovaia, practically opposite the point on the west bank, a bold temporary expedient was suggested. This was the installation of a large vessel combining the features of an ice-breaker and ferry, which should carry the trains intact across the lake, a distance of about 45 miles. By this means construction from the eastern bank could be hastened, leaving the line around the end of the sheet of water to be built at leisure at a subsequent date.
The construction of this vessel was entrusted to Sir W. G. Armstrong, Whitworth & Co., Limited, who had undertaken the ice-breaker Ermak which had proved such a unique success in the Baltic Sea. It measures 280 feet in length and has a displacement of 4,200 tons. It is propelled by twin screws driven by triple expansion engines developing 3,750 horse-power. A third screw is placed in the front, which not only serves to assist propulsion, but also to crush the ice, the vessel, as it were, cutting its own channel.
Rails are laid upon the deck of this steamer so that the train, when it comes to the water’s edge on one bank, proceeds under its own power on to the steamer, and upon reaching the opposite bank of the lake runs on to dry land. In addition, there is accommodation for a large number of passengers.
The vessel was built on the Tyne and then dismantled, every part being numbered to show its relative position. It was shipped to St. Petersburg, and from that point dispatched to Krasnoiarsk. Here on the shores of Lake Baikal the parts were reassembled and the vessel was launched. This ship-building operation was no mean feat in itself, bearing in mind the remote situation of the lake and the complete absence of those thousand-and-one facilities which are to be found in a shipyard on the Tyne.
The vessel proved a complete success, and the authorities were so gratified at this solution of a difficult problem that they secured a second ice-breaker, together with a floating dock where these craft could be repaired and overhauled as occasion demanded, together with sufficient equipment for such work. The total expenditure upon this trans-Baikal marine work alone amounted to £684,190, or $3,420,950.
The line around the shore of the lake, however, has been completed, providing through continuous railway communication across Siberia. Passengers can still enjoy the lake trip if they desire or are in a hurry, as the steamers are still in service, not only for this special purpose, but also to serve various other points along the shores of Lake Baikal, thereby bringing a great territory within easy reach of the railway.
The forging of the link around the lake, however, proved the most difficult part of the whole undertaking. Bridges across yawning deep gulches had to be introduced freely and projecting spurs had to be tunnelled. Heavy gradients and sharp curves could not be avoided owing to the configuration of the country, and at many places the work is extremely daring. Despite the difficulties with which the engineer had to grapple, this trying section was completed two years before the anticipated date, a result in the main due to the energy and initiative of one man—Prince Khilkoff.
This scion of one of the oldest and most noble families in Russia was an extraordinary man, and probably the most famous railway engineer that Russia has produced. His career was as extraordinary as his character. When a young man he determined to see things for himself. For several months he worked at a bench in Liverpool in order to become familiar with the trade of a mechanic. Then when one of the early trans-continental railways was being driven across the United States, he proceeded to that country and joined the navvying gangs at the railhead, becoming acquainted in turn with the difficulties of penetrating the mountains, railway-building and a thousand-and-one other details pertaining to such operations in a new country of a diversified character. In this way he gained valuable first-hand knowledge from practical experience. Afterwards he turned his attention to the operating side, serving first as stoker and then as driver. Still climbing the ladder, he became traction manager and was responsible for the running of the line. Few men ever have gained such an all-round knowledge of the intricate art of controlling a railway as did Prince Michael Ivanovitch Khilkoff, and one of his most treasured possessions was an old certificate of character that was given to him by his superior when he severed his connection with an American railway, in order to facilitate his securing another post.
The knowledge he thus acquired stood him in valuable stead when he returned to Russia, where the development of various means of communication throughout the empire was in a state of transition. On account of his wide and varied experience he was appointed to the directorship and control of various railways, and soon brought them to a high state of efficiency. He achieved the topmost rung of the ladder when he was appointed minister of all the roads, canals, rivers and railways of the empire.
The Trans-Siberian road thus came under his control, and he set to work energetically upon the completion of this tremendous enterprise. His influence was demonstrated on every hand. Lackadaisical methods made way for strict business routine, and in a short time the whole organisation was running with the precision of a clock. His subordinates when in a quandary never hesitated from seeking his advice and assistance, which were granted always with sympathetic interest; and when the obstacle assumed more than normal proportions he did not attempt its negotiation from an arm-chair thousands of miles away, but hurried to the spot to study it at first-hand, and to recommend and assist himself in the breaking down of the difficulty. He had become so saturated with American railway methods that he travelled up and down the line continuously; no detail, no matter how slight, missed his eye. At the time the Circum-Baikal line was in progress he scarcely ever left the railhead, as it was just one of those complex and exasperating fights with Nature in which he revelled. At seventy-five he was as active and as keen as ever, and it was a distinct misfortune for Russia that he was struck down by a paralytic stroke from which he never recovered. Still, he left a host of recommendations for the improvement of the Trans-Siberian and other railways, including the double tracking of the great trans-continental steel way, which are now being fulfilled.
When Lake Baikal was crossed, the engineers experienced a grim struggle for supremacy through every foot of the way. There is an up-hill pull from the shore of the lake over the Yablonovoi range, where the railway attains its highest point on the continent, viz. 3,412 feet above sea-level, and then makes a descent to gain the valley of the Amur. The country traversed is of a varied character, and was found to be tightly in the grip of frost, for the winter is terribly severe. The land, in fact, may be described as eternally frozen, for in summer, although the temperature rises to about 62 degrees, it does not thaw the ground to a depth of more than 7 feet below the surface. In the forested parts where the branches shut out the genial rays of the sun, ice is found at about 20 inches below the surface in midsummer.
Under these circumstances advance was trying. The top-soil was as hard as rock, and could not be displaced except by dynamite, so that in the deep cuttings in mid-summer it was just as arduous to cut a way through the frozen loam as through the solid rock. The rivers, although they flow with a fierce velocity, freeze up quickly, and the ice assumes a great depth—a train can cross on the congealed surface with perfect safety.
In this country, strange to say, it was found to be easier to work during the winter, notwithstanding the extreme cold, than during the summer, for a higher rate of advance could be maintained when the country was frost-bound. There is an almost total absence of snow, but, on the other hand, during the summer the rainfall is tremendous. The wet season lasts continuously for nearly two months—from the middle of June to the middle of August. The downpour is so terrific that floods are precipitated on every hand, and the resultant situation, as may be surmised, is of the most miserable character. In 1897 the effect of this deluge was experienced to an abnormal degree, for several villages were overwhelmed, and widespread misery was inflicted among the peasants. The railway did not escape, for large stretches of line were washed away and large quantities of material were lost.