In crossing the prairie stretches the railway constructional forces were indebted appreciably for their support to the buffalo, which roamed the plains in tens of thousands. The slaughter of this animal was tremendous to provide fresh meat for the camps, and hides for the clothing of the workmen against the blasts and severe cold of winter. Their existence was providential, especially when the Indians succeeded in capturing and destroying the supply trains bringing up provisions. Water often was a serious problem. For stretches of over a hundred miles at a time not a drop could be obtained from the parched land, and specially-built cars had to be pressed into service to transport this indispensable commodity.

Some idea of the solitude of the country may be gathered from the fact that during a continuous 600 miles not a single white man or homestead was seen. Before the line was completed a pony express plied between Sacramento and Salt Lake City, and the journey under normal conditions occupied three and a half days. To-day the distance is covered in about one-third of the time.

In the course of a few years the traffic on the Overland Route assumed such proportions as to be beyond the capacity of the ill-laid track. The grades were too heavy and the curves too sharp, while rails and bridges were too light. Extensive reconstruction was taken in hand. Banks were abolished, curves were straightened, bridges were rebuilt, the permanent way was re-ballasted, short sections were cut out here, or introduced there, to reduce the mileage—in short, the whole line was rebuilt practically at an expenditure of millions to bring the great highway up to the model of present-day practice.

One of the most important of these improvement works was that known as the Lucin Cut-off. This was a daring piece of engineering forced upon the railway by rival lines, which, possessing easier grades and a better-alignment, could haul heavier loads at a speed beyond the capacity of the pioneer road. This adverse factor was experienced very severely around the north end of Salt Lake, where the line plunges into the rugged and broken Promontory Range, to overcome which such heavy grades had to be introduced as to reduce the speed of trains to a crawl of 12 miles per hour.

At first it appeared impracticable to ease this situation, but the chief engineer was called in and urged to find a means of extricating the company from the predicament. After several months’ survey around this sheet of water he prepared plans which he submitted to his directors. They were extremely audacious. He suggested the abandonment of 373 miles of the old line completely, as it was beyond improvement. In its place he proposed 326 miles of new track, which not only showed a saving of 57 miles in distance, but gave no ruling grade exceeding 21.12 feet per mile. At one point he was baulked by the configuration of the country in the Pequop range, where a grade of 74 feet to the mile was found unavoidable. Moreover, he showed a saving of over half-a-mile in vertical height, the climb on the westward run being cut down from 4,550 feet to 1,535 feet, and on the eastward journey from 4,456½ feet to 1,444 feet.

The salient feature of the scheme, however, challenged particular attention. Instead of running around Salt Lake he advocated a route across it, giving a line as direct as the bird flies from shore to shore, supported on earthen embankments where such could be erected, and in other places upon a timber viaduct. Some idea of what this scheme represented may be gathered from the construction of a bridge from Dover to Calais—a project that has been promulgated—for the distance was about the same.

The engineer was prompted in his belief as to the practicability of the suggestion from his personal investigations. Popular fancy had clothed this stretch of salt water in many legends, one of which was that its depths were unfathomable. This fallacy was scattered to the winds when soundings were taken, for the water was found to be comparatively shallow at the point it was contemplated to cross the lake. Collis P. Huntington hesitated from embarking upon the scheme when it was first unfolded, partly on account of its estimated cost, but more because of its unusual character.

However, when E. H. Harriman secured the control of the line, he entertained no qualms. His engineer said it was feasible, so it must be done to avoid that laborious haul over the hills to the north. Work commenced forthwith, and was pursued with great vigour. When the bank of the lake was gained, the engineer pushed the earthen embankment as far into the water as he could, so as to reduce the extent of the trestling. The distance from shore to shore was 27 miles, but as he took advantage of a peninsula which juts well into the water from the north bank, four miles of the line were built on dry land.

To commence the embankment from the water’s edge an ingenious expedient was adopted. Heavy planks loaded with weighty bags of sand were floated out on the proposed location, and upon this novel permanent way the temporary rails for the ballast cars were laid, and the spoil dumped into the lake until the embankment appeared above water-level. Then the section of floating track was pushed still farther ahead, and the same cycle of operations repeated until the limit of the earthwork was gained. As the embankment grew in height the light rails were replaced by a heavier type, over which rumbled cars carrying 40 tons of ballast apiece, and which was pitched pell-mell into the water on either side. The embankment was then left for a while to permit settling to take place. In time it became as solid as a jetty.

The trestle section proved the most trying, not so much on account of the technical questions involved, but owing to the difficulty in obtaining timber. The wood had to be brought hundreds of miles from the forests of Texas and the north-west. Extensive stretches of trees were purchased and saw-mills were erected to cut the logs to the desired dimensions on the spot. Upon arrival at Salt Lake the wood was dumped into the water, large log booms being formed, so that the material might become seasoned thoroughly.

Work was delayed considerably by the lack of supplies of timber, from storms which swept this inland sea, and which at times wrought considerable damage. At one or two places, although careful soundings were taken, the lake bed proved fickle. When the pile-drivers were set to work, banging the massive uprights into the solid earth, progress would be painfully slow for a time, and then suddenly the pile would descend with uncanny rapidity. The cause was discovered readily. The lake bed is covered with a thick crust of salt and soda deposits, the accumulation of centuries, packed so hard as to give the semblance of being solid rock when sounded. Yet it was only a shell or crust covering unstable soil below. Driving the piles broke up this rind, and then a solid foundation could not be found.

Attempts to remedy this state of affairs were made by pitching rock into the water to provide a solid floor to support the timber uprights. This method proved so slow and expensive that the engineer devised another solution of the difficulty. He ran out a light trestle and dumped rubble overboard around its foundations until the woodwork was buried completely, and a solid earthen embankment was produced to carry the rails.

The actual extent of timber trestling aggregates 12 miles, and this erection spans the lake practically at its narrowest central part. Some of the pile-drivers were carried on floating pontoons, while others were mounted on the track above, the permanent way being pushed forward as rapidly as the timber work was completed. Owing to the depth of the water, some of the upright members are as much as 110 feet in length. They are disposed in rows of five at right angles to the track, and connected by massive longitudinal members, on which is laid three-inch planking, superimposed with a layer of ballast. It was while building the timber work that the greatest depth of water was reached—from 30 to 34 feet.

The trestle was erected with striking rapidity, the record being the completion of no less than 5,317 feet of track in six working days. Had it been possible to bring the timber up more quickly, a greater length of line could have been laid in the time. At rail-level the viaduct is 16 feet in width, and the track is so smooth and solid that the “Overland Limited” can hurtle along at full speed without producing the slightest vibration.

By the time the viaduct was completed, 38,256 piles had been used. This represented no less than 2,824,700 lineal feet of timber which had been torn from the forests. If these logs had been placed end to end they would have formed a continuous line for nearly 535 miles.

So straight did the engineer plot and build the Lucin Cut-off, that even if he had complied with Euclid’s definition of a straight line, it would have been necessary only to have deducted 1,708 feet from the 102.91 miles of track which he laid. In addition, he abolished 3,919 degrees of curves. To understand what this means it is only necessary to remember that each degree represents a segment of the circle. By dividing the above total by 360, the number of degrees to the circle, a result of 11.88 circles is obtained. In other words, on the old route between Lucin and Ogden, the train not only traversed the distance between the two points, but described nearly 12 circles as well. For 36 miles the track is dead level and for another 30 miles the rise is so slight that one has to walk half-a-mile to rise his own height. By the time the task was completed a round £1,000,000, or $5,000,000, had been expended. It appears a huge outlay to reduce working expenses and to increase revenue, but it affords a striking illustration of the boldness of guiding railway spirits in America.


CHAPTER VI THE LONGEST “TOY” RAILWAY

The Principality is a land of many surprises to the visitor, for it possesses innumerable attractions. Yet it is doubtful whether any feature arouses more interest in North Wales than the strange little railway which runs from Portmadoc for a distance of 13¼ miles among the mountains. Certain it is that no tourist would think of omitting a journey over what is known colloquially as the Festiniog “Toy” Railway, for it is one of the great sights of North Wales.

For several years it held a unique position among the great systems of the world as the narrowest gauge line in operation. The metals are laid only 23¼ inches apart—less than half the distance between the rails forming the roads of the greater proportion of steel highways bounding the globe—and yet it has a traffic which many a more important railway would have just cause to envy. Visitors disembarking from the London & North-Western express at Portmadoc, and seeing the diminutive engine and trucks drawn up alongside on their own road and completely dwarfed by the towering rolling-stock of the standard-gauge line, cannot repress a smile, for the engines, cars, trucks and wagons are no larger than are used upon the larger-sized model railways devised to-day for the amusement and education of the young.

Yet it is a complete pocket edition of the familiar railway, and its capacity is amazing. The engine provokes interest, for it is no taller than an average-sized person. Its coupled wheels are only 28 inches in diameter, while the cylinders measure but 8¼ inches in diameter and have a stroke of only 13 inches. The cars and wagons are on the same scale, and the first impression of the diminutive iron horse awakens doubts as to whether it is safe to trust oneself to its care. But see that self-same engine busy at work hauling a train of 7 passenger coaches, a guard’s van, 10 goods wagons and 100 or more empty slate trucks, stretching out for a length of 1,200 feet and representing a total load of 110 tons, out of Portmadoc, bound for the quarries, and disdain gives way to complete admiration.