CHAPTER III THE BORING OF THE GOTTHARD TUNNEL

The little country of Switzerland, as is well known, is a tumbled mass of snow-clad mountain ranges. On the Italian frontier, however, this natural barrier becomes more rugged and defiant, some of the peaks towering 10,000 feet or higher into the clouds. For centuries this frontier chain so successfully walled in the Helvetians that they could not pass into Italy without making a wearisome detour. Travelling from one country to the other before George Stephenson demonstrated the possibilities of the steam engine running on rails, therefore, was a journey not to be lightly undertaken, for it occupied weeks. An effort to ease this situation was made so far back as the thirteenth century by the blazing of a footpath over the St. Gotthard, but it was a mere dangerous and dizzy trail. Little wonder, therefore, that it was not favoured by other than the more adventurous.

It was not until about a century ago that the first vehicle lumbered over this rugged hump. Then the demand for closer communication between the two countries prompted the ambitious Helvetians to embark upon a costly and momentous enterprise—the building of a postroad over the mountain. They cut a roadway 18½ feet wide, with an average grade of 10 per cent. to a height of 6,936 feet up the flanks of this snow-topped giant, with its deep rifts, rushing rivers, and faced the terrors of the avalanche. It is a striking piece of work, for at places the road clings, limpet-like, to perpendicular walls, describes sharp twists and turns sudden corners. Although the people could ill afford the expense of the undertaking, they carried it to completion, confident that untold benefit would accrue from its provision.

They were right in their surmise. That mountain road changed completely the direction of the stream of traffic flowing between Switzerland and Italy. The novelty of the route, the magnificent panoramas unfolded from every foot of its length, appealed to the tourist and traveller and they bravely essayed the “pass.” To-day that mountain road is trodden but seldom. It has fallen into desuetude; the railway has killed its utility.

So soon as the iron horse invaded the little country it was sought to carry it into Italy via the St. Gotthard; not over the mountain crest, but through its base. Every engineer nursed the ambition to overcome that frowning knot with the steel highway. For years brilliant minds lived, dreamt, and died obsessed with this one great idea. Even in 1846, when the first railway was opened from Baden to Zurich, preparations were made to carry the line onward through the mountain chain. To the Swiss people, boring through a mountain for nine miles or so appeared no more difficult than burrowing through a hillock for as many yards. It was only a question of time and expense.

An “Alpine tunnel fever” set in with terrible malignancy, and there was fierce rivalry and jealousy created between the various railway companies, cantons and towns as to who should have the honour of completing this remarkable link. Fortunately the Government itself preserved a cool head, turned a deaf ear to entreaties, refused concessions, and discouraged any possible hope of financial aid. The last-named factor proved the greatest stumbling-block, but there is no doubt that if the money could have been obtained for such an enterprise an attempt to tunnel the Alps would have been made in the ’fifties.

Though the ambition was scotched it was not killed by any means, for a few years later the same scheme was revived and more keenly discussed than ever. The French and Italian nations resuscitated the project by co-operating in the effort to pierce the Col de Fréjus, popularly known as the Mont Cenis tunnel. The first stroke of the pick-axe upon this momentous enterprise was made in August, 1857, and the two chief engineers, Grattoni and Sommeiller, pledged themselves to complete the task with the assistance of the French and Italian governments. In the face of the most terrible difficulties that could be conceived, equipped with tools which appear puny and futile in comparison with those used for such work to-day, they cut, blasted, and excavated their way through 7½ miles of dense rock. Boring from either end, the rock-hogs broke down the last wall of rock on Christmas Day, 1870, and in September of the following year a shorter and more direct route between the two countries was opened to traffic.

The progress of this tunnel was watched with the closest interest by the Helvetians. This piercing of an Alpine mountain was something new in railway engineering. The wiseacres croaked that it would never be completed; that Nature would spring some sudden surprise upon the engineers in the depths of the mountain which would arrest the whole enterprise. But as the two headings slowly but surely approached one another, and the engineers broke down their obstacles as they arose with commendable pluck and determination, the sceptics became silenced.

THE GÖSCHENEN ENTRANCE TO THE ST. GOTTHARD TUNNEL

Work was commenced at this point on June 4, 1872. The huge task was completed and the line opened for traffic on May 22, 1882.

The pride of the Swiss was wounded. If the French and Italians could accomplish such a herculean and apparently impossible task, why was a similar idea beyond their powers? The “conquest of the Alps” broke out with renewed vigour. It became more than a personal issue; it blossomed into one of economic, political and commercial importance. Consequently, before the Cenis Tunnel was opened for traffic, the preliminary arrangements for burrowing through the St. Gotthard had assumed concrete shape. But it had been a wearisome enterprise. The promoters had to battle against intrigue and jealousies innumerable on the part of private individuals, companies seeking for the same concession, towns and departmental governments. But the project became one of even more than national importance; it became an international question. The provision of such a route would bring northern Europe into closer touch with Italy and her ports on the Mediterranean. That fact was realised, and when the company incorporated to carry out the work announced that the task was far too risky for private resources, the governments of the countries most intimately interested in the fulfilment of the project promised tangible assistance in the form of substantial subventions.

THE WONDERFUL WASSEN LOOP ON THE ST. GOTTHARD RAILWAY, SHOWING THREE TIERS OF TRACK

The path of the tunnel through the heart of the mountain was plotted by Mr. M. O. Gelpke, C.E., and this in itself was a great achievement. Fifteen stations were scattered over the mountain slopes for the manipulation of the survey instruments, and many of these were situated unavoidably in positions very difficult, and often impossible, of access. Borings were made to ascertain the rock strata which would have to be pierced by Professor Fritsch of Frankfort, and from the result of these essential investigations it was computed that the work, including the necessary railway line on either side of the great tunnel, could be completed for a sum of £7,480,000, or $37,400,000. The money was raised by guarantees of £1,800,000 ($9,000,000) from Italy, £800,000 ($4,000,000) from both Germany and Switzerland, and by the issue of shares and mortgage bonds to the extent of £2,720,000, or $13,600,000. As a further contribution to the task, the Swiss Government undertook to supervise actual construction.

The financial arrangements completed, the company had to search for a man to bore the tunnel. For this purpose tenders were sought for the whole contract. The terms of the latter were severe, as were also the technical conditions. The tunnel was to carry a double track, to have a height of 19.68 feet to the crown of the arch, and a maximum width of 26.24 feet, with a minimum width of 24.93 feet. The tunnel was to be quite straight, with the exception of a slight curve at the southern end, where, for a distance of 474 feet from the entrance, a curve of 984 feet radius was to be introduced to gain Airolo station. The rise from the northern entrance was to be about 1 in 172 to the summit level 3,781 feet above the sea, followed by a drop of 1 in 1000 to the southern end. These gradients falling on either side from the centre were necessary for drainage, and were estimated to be just sufficient to ensure the water flowing to the portals.

Seven tenders were submitted for the enterprise, the lowest being that of L. Favre, a well-known engineer of Geneva, who had completed many notable railway works in Europe. He undertook to complete the tunnel for £2,000,000 ($10,000,000) within eight years. His nearest competitor, an Italian company, wanted twenty-five per cent. more, but would not guarantee completion within less than nine years. Monsieur Favre was supported by a body of influential capitalists, and the contract was awarded to him.

Having sanctioned the project, the Government was determined that it should be completed, and resolved that the engineer should be held to his self-appointed time limit. The penalty it stipulated was exacting. For every day over the ninth year Favre was to forfeit £200, or $1000, for six months, and then double that penalty per day until completion. A year was thus allowed over and above what he demanded to cope with any unforeseen contingencies that might arise during the progress of the task. Similarly, M. Favre was to receive a premium of £200, or $1000, a day for every day he was in advance of the stipulated period. His Italian competitor, while agreeable to the forfeit, stipulated that it should not be enforced until after the eleventh year, which terms the authorities refused to entertain. To ensure securing the forfeit money should the engineer be late, Favre was compelled to deposit a sum of £320,000 ($1,600,000) with the Government before a stone was moved.

No undertaking of such a magnitude as this tunnel, although protected adequately by severe restrictions, ever has been carried out in the face of so many vicissitudes; no engineer ever has been so harassed as was M. Favre. From the moment the tender was signed and sealed troubles commenced, some incidental to the task, others purposely thrown in his way by jealous outside interests. In the first place, the Government undertook, according to the terms of the contract, to have the approaches to the tunnel completed so that he could commence operations without delay. This was not done. Further opposition was then encountered from another and unexpected quarter, which assumed such proportions as to jeopardise the whole scheme. Italy, having contributed about a sixth of the cost, and who therefore had an important voice in the matter, demanded that half the work should be granted to the Italian engineers who had been engaged upon the Mont Cenis tunnel. This was a bitter question, and it took M. Favre two weary months to adjust it.

These hindrances at last settled satisfactorily, work was commenced on the northern side of the Alps at Göschenen on June 4, 1872, and at Airolo, the southern portal, on July 2 of the following year. The preliminary preparations were of a gigantic character. Though M. Favre had sublet the constructional contract for the tunnel itself, he was primarily responsible and nursed it as the engineer-in-chief. Huge plants had to be installed at either end for supplying the various demands for power for a thousand-and-one purposes. At the northern end water turbines were laid down, driven from the river Reuss, a head of water of 279 feet being available. At the Airolo end a similar installation was established and operated under a water head of 541 feet from the Tremola. Subsequently, it was found that this latter supply was inadequate. But M. Favre was a man of infinite resource. He promptly built a viaduct 12,000 feet in length, tapping the Tessin River, and thus overcame the water power difficulty. Small towns sprang up at either end around the respective portals to house the machinery, the workmen, and innumerable other details.