The Railway Conquest of the World
From the Government’s strict point of view the Canadian Pacific was not completed until about two years ago, although trains have been running between the Atlantic and Pacific for some thirty years. The authorities pointed out that the grade was an essential part of the contract, and yet, in order to pass through the Kicking Horse Pass, the company had exceeded that grade to a very considerable extent. Consequently eight miles of line was non-existent so far as the Government was concerned, and it declined to contribute any subsidy to that short length of the railway. Two years ago compliance was made with the Government’s agreement. The route through the Kicking Horse Pass was re-aligned. This piece of work was carried out by the late J. E. Schwitzer, and from its daring nature it will always stand as a monument to his engineering ability. He cut out the “Big Hill” entirely. Where previously a bank rising 1 in 22¼ existed for 4.1 miles, he provided a stretch of line double the length and of one-half the gradient, so that the engines only have to overcome a climb of 1 in 45½.
In order to ease the grade the line swings from one side of the narrow valley to the other. Travelling westwards it disappears into the flank of Cathedral Mountain, describing a curve in the tunnel to emerge into the valley about 40 feet below the point where it enters the mountain side. It then strikes across the valley to enter the slopes of Wapata Mountain, where another tunnel on a curve like a corkscrew lowers the level of the line for another 40 feet. Once more it crosses the valley, the meanderings being so bewildering as to form a perfect maze. It recalls the wonderful spiral tunnel-work on the St. Gotthard railway where a similar difficulty had to be overcome, and, indeed, the conquest of the Kicking Horse Pass in this manner was based evidently upon the great work in Switzerland. Still, it marks the first application of this ingenious solution of a trying problem to the American continent.
To bring the Kicking Horse Pass section of the line within the recognition of the Government, however, entailed the expenditure of some,£300,000, or $1,500,000, and found employment for about 1000 men for twenty months. Train-load after train-load of dynamite was brought up in order to enable the path to be hewn through the mountain flanks, and by the time the task was completed over 1,500,000 pounds of explosives had been used—something like,£50,000, or $250,000, had vanished literally in smoke to tear down the rock. But the outlay will be recouped well. Where four engines were required formerly two now suffice to handle a 700-ton train, and they can rattle through the Pass at a steady 25 miles an hour, whereas previously a bare six miles could be notched.
Emerging from the Rockies the engineers were confronted by another towering obstacle—the Selkirks. This range was to be dreaded more than the barrier just left behind, for there was a trail through the Rockies to guide the engineers, whereas the Selkirks had never been threaded. The Indians and Hudson’s Bay voyageurs, after emerging from the Rockies, turned sharply south to follow the Columbia River.
The first task, therefore, was to discover a rift through the Selkirks through which the metals might be carried. It was shorter to go through the mountains than to go round them if any pass could be found to exist. Major Albert B. Rogers, an American engineer, accordingly saddled his horse and with a supply of provisions set off to search for a “Pass.” He wandered up and down the range without success for week after week, and then, just as he was despairing of success, his eye alighted on a narrow breach between two serried lines of snow-clad peaks. He spurred forward, traversing territory on which the feet of neither white nor red man had been planted, climbing and toiling arduously among the crags, until at last he gained an altitude of 4,351 feet, from which the opposite sides of the range sloped down once more to the Columbia River Valley.
THE STEEL ARCH BRIDGE ACROSS STONEY CREEK IN THE SELKIRK MOUNTAINS
This graceful structure replaced a wooden bridge supported on timber towers 200 feet in height.
Rogers’ Pass, as this defile through the Selkirks was named in honour of the discoverer, was followed. It did not offer any great difficulties from the grading point of view. The greatest enemy was snow and avalanche. The snowfall among these mountains is the heaviest along the line, while the avalanches are of terrible frequency. Consequently the absorbing question was how to keep the line intact after once it had been laid. It was impossible to avoid the defined paths of the snow movements entirely, and in these cases huge sheds had to be erected to carry the avalanche harmlessly over the track to expend its violence in the gulch below. The extent of snow-shedding through the Selkirks is amazing, and it has proved terribly costly.
THE RAILWAY TRAVERSING THE TUMBLED THOMPSON RIVER CANYON
When the engineers attacked this country, as the laying of the track was the paramount requirement it was pushed forward with all speed during the short summer, and parties of men equipped with meteorological instruments, and vehicles for movement during winter, and supplies of stores, were left at different points to study the snow question, so as to collect data for the situation of the snow-sheds. There was no difficulty in determining this latter point, for the avalanches appeared to rain down upon the track from all sides. The question was not so much where to introduce the sheds, but where they could be omitted. It appeared as if the line would have to be carried almost continuously through a wooden tunnel to ensure its safety.
That the snow-fiend is no mean enemy was brought home forcibly some three years ago. While a snow, train was climbing up the western slope, clearing away the accumulated mass of snow and debris deposited by a slide upon the track, another avalanche swept down upon the little band working so desperately to cut a path for the mail. Over 100 men were on the train when the terror of the mountains struck them and swept the whole into the gulch below, the locomotives and plough weighing over 50 tons being bowled over and over like an india-rubber ball as they were hurtled down the steep slopes. Over fifty lives were lost in that catastrophe, and it was but one of many which have happened since the Selkirks were first gridironed by the railway.
But snow-shedding, while securing the safety of the line, has its drawbacks. If a structure is made too lengthy it becomes filled with suffocating smoke which obscures all signals, and deadens all sounds. In summer another danger exists. The district threaded is one ravaged heavily by forest fires, and the danger from this enemy was only too vividly apparent. At this juncture Mr. W. C. Van Horne came to the rescue of the engineers, as he had done on many previous occasions, to extricate them from their difficulty. He suggested that the maximum length of a single shed should be 3000 feet, and where the conditions demanded a long continuous length of this protection, that it should be broken up into units with wide, clear intervals of open line between.
To prevent these “breaks” becoming filled with debris he resorted to an ingenious expedient. Up on the mountain side he built what is known as a “split fence.” This is a triangular erection, with the apex pointing towards the mountain top, of heavy massive construction and filled and banked with masonry. The descending slide strikes this obstruction, becomes split in twain, one half is deflected so as to roll over the roof of the snow-shed on one side, and the other half caused to glance off in a similar manner on the other side. If one of these constructions did not secure the desired end, then another was planted above it higher up the mountain side. The success of this system has been remarkable, and it has enabled the company to reduce the lengths of the sheds very appreciably.
Shortly after the line was opened the protective handiwork of the engineers was subjected to trying tests. The winter of 1886–7 was one of excessive severity even for the Selkirks. In less than a week 8½ feet of snow fell, and the blizzard raged continuously for three weeks. Slides were of daily occurrence, the silence of the mountains being broken by the continuous roar of the avalanche. The snowfall on the summits exceeded 35 feet, and the white mantle was piled upon the roofs of the sheds to a depth of 50 feet. The slides were of terrific fury, some rattling down the slopes with such force and speed as to rebound 300 feet or so up the opposite mountain side. Thousands of tons of rock, some pieces as large as a small villa, were caught up in their frantic rushes, while tall, thick trees were snapped off like matches and tossed about like straws. Yet with one exception the sheds withstood the terrible bombardments to which they were subjected. The solitary case had the roof torn off completely to be thrown well above the track on the mountain side.
Mud-slides were another visitation which had to be respected, for time after time a cutting had to be cleared of a viscous mass which had slipped into the excavation. These movements are produced by a kind of sand, which, when it becomes saturated with water, slips and slides in all directions in an amazing manner, carrying everything with it. In winter, when under the grip of frost, the soil looks perfectly safe and stable, but when the weather breaks innumerable springs come to life, and in a short time the whole mass commences to move like a lava stream.
In addition to resorting to extreme protective measures against the avalanche where these could not be avoided, some magnificent pieces of bridge-work were carried out at other points to avoid them. In the first instance several were erected in wood to save time, to be replaced by permanent metal structures at a later date. In many cases, however, iron, and in others masonry, had to be adopted in the first instance.
There was one gully which perplexed the engineers sorely. It was just a cleft in the perpendicular mountain cliff. The engineers called it the “Jaws of Death,” and the name was appropriate. They had to cross this couloir, and a temporary timber bridge was built by dint of tremendous effort. The engineers congratulated themselves upon their success, but their gratification was short-lived. A constructional train ventured to cross and the structure collapsed under its weight. Here was a dilemma. Work was brought to a standstill and there was grave deliberation. Mr. Van Horne heard of the accident, and hurried to the front. He surveyed the gully, and there and then decided to throw an arched masonry bridge across the breach. It was built, and what was more to the point, it stood; the constructional gangs could get forward.
At Stoney Creek there was another trouble of a like nature. The V-shaped ravine was deep and wide, and it was recognised that something different from what had been done in bridge-building up to this point was imperative. Two wooden towers were built on either side to a height of 200 feet, and these supported a single span of 172 feet over the gulch, which was carried out in wood also. From end to end the bridge measured 490 feet, and for years it ranked as the highest wooden bridge on the continent. The timber structure, however, has long since made way for a noble arched steel bridge springing from the rocky sides of the gulch, and it constitutes one of the most graceful bridges on the whole of the system.