During the period from 20th September 1908 to 10th October 1908 the quantity of silt in the canal above Chamkour (twelfth mile) decreased from 19,325,800 cubic feet to 12,477,600 cubic feet. The quantity scoured away was 6,848,200 cubic feet. During this period no silt entered the canal. The quantity which passed out of the reach in question in suspension was 4,183,660 cubic feet, so that 2,664,540 cubic feet of material must have been rolled along the bed. The rolled material was 64 per cent. of the suspended material. During this period the Daher escape, in the twelfth mile, was open, and the mean velocity in the canal just above the escape was about 4 feet per second, the depth of water being about 10 feet. The velocity near the escape was thus greater than the critical velocity for mixed silt (Chap. IV., Art. 6), and even a long way up the canal it would be in excess of the critical velocity. The water seems to have carried about 1/1800 of its volume of silt. Whether the above proportions of rolled to suspended matter would hold good in a fully charged stream flowing with the critical velocity it is not easy to say.

As silt deposits in the pond, the velocity of the water in it, along the course of the main current towards the canal, increases and eventually the water begins to carry coarse sand dangerous for the canal. In order to ascertain when this state of affairs has been reached, two methods of procedure are possible. One is to frequently test specimens of the water in the pond along the course of the main current and see when it contains more than 1/15,000 of its volume of coarse sand. This plan would be troublesome and liable to error, and is rejected by Kennedy, who suggests that the depth and velocity of the water in the pond be frequently observed along the course of the main current. As soon as the velocity exceeds the critical velocity for mixed silt, it is time to close the canal and open the under-sluices and scour out the deposit from the pond. The period in which most silt is believed to have been deposited in the canal is the spring and early summer, say from 15th March to 1st July. This is the time when the snows are melting and the river water is clear. It can then carry more sand than in the rains—1st July to 15th September,—when it is muddy.

Kennedy also suggests that some under-sluices should be provided at the far side of the river, i.e. at the right-hand side of the weir. It would then be possible, by opening them, to let floods pass without interfering with the pond.

The two spurs or groynes, shown in the plan, were constructed in 1897 so as to cause the stream to flow along the face of the canal regulator and not allow deposits to accumulate there. The depth of silt deposited in a great part of the pond amounted at times to 8 or 10 feet.

6. Protection of the Bed.—It is possible to afford direct protection from scour to the bed of a stream by constructing walls across it, but unless the walls are near together the protection will not be effective. An arrangement used in some streams in Switzerland consists of tree trunks secured by short piles and resting on brushwood. But as long as the walls are not raised above the bed they cannot entirely stop scour, unless extremely close together. If raised above the bed they form a series of weirs.

The weirs must be so designed that the depth of water in a reach between two weirs is great enough to reduce the velocity down to the critical velocity, or less. The fall in the water surface at each weir being very small, the discharge over the weir can be found by considering it as an orifice extending up to the downstream water surface, and the head being the fall in the surface at the weir.

To stop scour of the bed by direct protection without raising the water-level, the bed can be paved, a plan adopted in artificial channels with very high velocities. The paving can be of stones, bricks, or concrete blocks. The Villa system of protection, which has been used in Italy, France, and Spain, consists of a flexible covering laid on the bed. Prisms of burnt clay or cement are strung on several parallel galvanized iron wires, which are attached to cross-bars so as to form a grid a few feet square. The grids are loosely connected to one another at the corners, and the whole covering adjusts itself to the irregularities of the bed (Min. Proc. Inst. C.E., vol. cxlvii.).

The special protection or paving required in connection with weirs and such-like works is considered in Chap. X., Arts. 2 and 3.

CHAPTER VI WORKS FOR THE PROTECTION OF BANKS

1. Preliminary Remarks.—The protection of a length of bank from scour may be effected by spurs, which are works projecting into the stream at intervals, or by a continuous lining of the bank. A spur forms an obstruction to the stream (Chap. IV., Art. 1), and when constructed, or even partly constructed, the scour near its end may be very severe, even though there may be little contraction of the stream as a whole. If the bed is soft a hole is scoured out. Into this hole the spur keeps subsiding, and its construction, or even its maintenance, may be a matter of the greatest difficulty. A high flood may destroy it. If it does not do so, it may be because the stream has, for some reason, ceased to attack the bank at that place. A continuous lining of the bank is not open to any objection, and is generally the best method of protection. Spurs made of large numbers of rather small trees, weighted with nets filled with stones, have been used on the great shifting rivers of the Punjab which swallowed up enormous quantities of materials. The use of spurs on such rivers has now, in most cases, been given up. If L is the length of a spur measured at right angles to the bank, the length of bank which it protects is about 7 L—3 L upstream and 4 L downstream,—but the spur has to be strongly built, and its cost is, in many cases, not much less than the expense of protecting the whole bank with a continuous lining.

Whatever method is adopted, a plan, large enough to show all irregularities, should always be prepared, and the line to which it is intended that the bank shall be brought marked on it.

Fig. 7.

Sometimes natural spurs exist as, for instance, where a tree projects into a stream or has fallen into it, and the holes between the spurs may be deep, so that a continuous protection would be expensive. Or there may be trees standing in such positions that, if felled, they will be in good places for spurs. In cases such as the above, spurs may be suitable even in a stream with a soft channel.

Regarding the use of spurs or groynes for diversion works or for reducing the width of a stream, see Chap. VII., Art. 1, and Chap. VIII., Art. 3.

2. Spurs.—A spur may be made of—

(a) Loose stone, which may be faced with rubble above low-water level (fig. 7).

(b) Layers of fascines weighted with gravel or stones.

(c) Earth or sand closely covered with fascines.

(d) A double line of stakes with fascines or brushwood laid between them (fig. 8).

(e) A single line of stakes with planking or basket work on its upstream side, or with twigs or wattle laid horizontally and passed in and out of the stakes, as in fig. 20.

(f) A single tree with the thick end of the trunk on the bank and with stakes, if necessary, to prevent the current from moving it.

(g) A number of small trees heaped together and weighted with nets full of stones.

(h) A layer of poles and over them a layer of fascines on which are built walls of fascine work so arranged as to form cells or hollow rectangular spaces which become filled with silt.

(i) Large fascines running out into the stream and having their inner ends staked to the bank while the outer ends float, other fascines being added over them and projecting further into the stream, and the whole eventually sinking.

Fig. 8.

Combinations of the above are also used, for instance, (d) or (e) may be used for the upper portion, the foundation being (a) or (c).

Fig. 9.
Fig. 10.
Fig. 11.

Instead of running out at right angles to the bank a spur may be inclined somewhat downstream. This somewhat reduces the eddying and scour round the end. The ends of a system of spurs should be in the line which it is intended that the edge of the stream shall have (fig. 9). The tops of short spurs are usually above high flood level. Sometimes spurs are made to slope downwards (fig. 10), and they then cause less disturbance of the water and less scour than if built to the form shown by the dotted line. Such spurs are sometimes combined with a low wall running across the bed of the stream, the whole forming a “profile” of the cross-section to which it is intended to bring the channel. Regarding such walls, see Chap. V., Art. 6. When a spur is long it may have small subsidiary spurs (fig. 11) to reduce the rush of water along it; or its end may have to be protected in the same manner as the advancing end of a closure dam (Chap. VII., Art. 2).

The following is a curious case of misconception of the action of spurs. In 1909 the river Indus was eroding its right bank and threatening to destroy the town of Dera Ghazi Khan. A clump of date palms formed a promontory and resisted erosion to some extent. A suggestion was made—by an engineer of eminence who had formerly been consulted in the case—to the effect that the date palms be removed, the reason given being that they caused disturbance and scour. On this principle spurs would have to be made not to protect a bank but to cause it to be eroded.

3. Continuous Lining of the Bank.—The lining or protection of a bank may be of stone or brick pitching (figs. 12 and 13), loose stone (fig. 14), fascines (fig. 15), turfing, plantations, brushwood, or of other materials laid on the slopes. Before protecting a bank it is best to remove irregularities and bring it to a regular line. This can generally be done most easily by filling in hollows, but sometimes it is done by cutting off projections. It is also necessary to make the side slope uniform. Where the slope is as shown by the dotted lines in figs. 12 to 14, filling in can be effected, but cutting away the upper part of the slope is also feasible. Such cutting away has been proposed as a remedy in itself in cases where the steep upper part of the slope was falling in, but it is not much of a remedy.

Stone pitching may rest, if boats are required to come close to the bank, on a toe wall of concrete, as in fig. 13, 9 or otherwise on a foundation of loose stone, as in fig. 12. When concrete is used the bed is dredged to such a depth as will provide against undermining by scour. Sloping boards attached to piles are placed along the front face and the concrete is thrown in under water. The slope of stone or brick pitching is usually from 2 to 1 to 1 to 1, but it may be as steep as ½ to 1. The earth behind the pitching must be well rammed in layers. In order to prevent the earth from being eaten away by the water which penetrates through the interstices of the stone or brick, a layer, 3 to 6 inches thick, of gravel or ballast is placed over the earth and rammed. When loose stone is used, dredging is not necessary, but the stone is allowed to gradually sink down and more is added at the top. A certain proportion of the stones should be of large size.