River and Canal Engineering, the characteristics of open flowing streams, and the principles and methods to be followed in dealing with them.
| Steep rocky hillsides | ·70 | to | ·90 |
| Ordinary hills | ·50 | ” | 75 |
| Undulating country | ·40 | ” | ·50 |
| Flat country | ·30 | ” | ·35 |
The figures can be increased when the surface is specially hard or frozen, and decreased when it is soft, sandy, covered with woods or vegetation, or cultivated.
Whether or not the above procedure is necessary in its entirety depends chiefly on the size of the proposed work and on the degree of inconvenience likely to arise from any wrong estimation of the discharge.
In designing syphons to carry torrents across the Upper Jhelum Canal in the Punjab, the discharge from a catchment area of ·79 square miles was found to be about 4000 cubic feet per second. This is at the rate of about 5000 cubic feet per second per square mile, and is equivalent to a run-off of 7·8 inches in an hour. The catchment area was among low hills, not far from the Himalayas, and the declivities of the rills were very steep. The superintending engineer, Mr R. E. Purves, states 18 that the discharge observations were reliable, and that falls of rain of an inch in ten minutes occur not infrequently, even though the fall in twenty-four hours might not exceed 2 or 3 inches. In order to account for the discharge in the case under consideration, it would at first seem to be necessary to assume not only that a fall at the rate of 7·8 inches per hour had occurred, but that the whole of it had run off. It is not, however, necessary to assume quite so much. The ground being saturated, the rain falling in a period of five minutes might be reaching the discharge site with little loss. A suddenly increased fall at the rate of 6 inches per hour might then occur, and the water travelling more quickly and with hardly any loss, would overtake that already passing the site. This case seems to show that for a very small catchment area the whole of the fall, and more, must be allowed for.
The Chief Engineer of the Punjab did not accept the above figures. 19 He remarked that observations taken under great difficulties as to time and place are liable to error, and he considered that an allowance of rainfall at the rate of 4·8 inches per hour—a rate which had been observed elsewhere—and a run-off of ·75 of the fall would be sufficient. He accepted a discharge of 2000 cubic feet per second for catchment areas of less than 5 square miles, assuming the run-off to be ·75 of the fall, but afterwards increased the figure to 2400 cubic feet per second. The chief engineer did not overlook the fact that in the designs for the drainage aqueducts a free-board of 5 feet had been allowed, and perhaps this led to an acceptance of an estimated discharge less than would otherwise have been accepted. It does not seem to be at all certain that the figure put forward by Mr Purves was far wrong. When the original project estimate for the Upper Jhelum Canal was framed, the irrigation engineers had had no experience of small and steep catchments, and no one had suspected that the discharge per square mile would be anything like the above. The sums of money provided for works for the passages of torrents had to be increased in ratios varying from 2·5 to 1 to 6 to 1.
The following statement shows the figures for other small catchment areas in the neighbourhood of the Upper Jhelum Canal:—
| Catchment Area. | Discharge per square mile. | Run-off. |
|---|---|---|
| Sq. miles. | Cub. ft. per sec. | Inches. |
| .79 | 5000 | 7·8 |
| 1·47 | 3825 | 5·82 |
| 2·96 | 2214 | 3·46 |
In the south-east of New South Wales flood discharges of 135 and 84 cubic feet per second have been found for catchment areas of ·91 and 2·5 square miles respectively in broken country.
3. Rivers.—It is possible to apply the methods of the preceding article to large catchment areas, but the results would be quite unreliable. If the calculations were made so as to err on the side of safety, the resulting discharges would often be enormous. The following table shows some figures based on actual flood discharges. None of the localities have excessive rainfalls, though most are liable to occasional very heavy falls. In mountainous districts in the North of England and in Scotland the flood discharges per square mile of catchment area have been found to vary from 64 to 320 cubic feet per second.
| Reference Number. | Country. | Locality. | Catchment Area. | Flood Discharge per sq. mile of Catchment Area. | Remarks. |
|---|---|---|---|---|---|
| Sq. miles | Cub. ft. | ||||
| 1 | India. | Upper Jhelum. | 5 to 10 | 1613 | |
| 2 | ” | Nagpur. | 6·6 | 480 | |
| 3 | South Africa. | Near Cape Town. | 34·5 | 78 | |
| 4 | ” | Near Port Elizabeth. | 35 | 640 | Estimated. |
| 5 | New South Wales. | South-East District. | 49 | 37 | |
| 6 | India. | Upper Jhelum. | 56 | 1000 | |
| 7 | ” | ” | 174 | 550 | |
| 8 | New South Wales. | South-East District. | 418 | 11·2 | |
| 9 | India. | Kali Nadi Stream. | 2593 | 51 or more | Estimated roughly. |
The tendency of the figures in column 5 of the table is to decrease as the catchment area increases. This tendency has long been known, and attempts have been made to found on it formulæ for calculating flood discharges. One such formula is Q = c M¾ where Q is the flood discharge in cubic feet per second and M is the area of the catchment in square miles. The formula is roughly correct, c being a constant for catchment areas of not dissimilar characters and with rainfalls not differing much. But for other cases there is no knowing how c may vary, and this renders the formula practically useless. The author of another such formula quotes cases Nos. 5 and 8 in the above table, and the two cases mentioned at the end of Art. 2 as agreeing fairly well with the result of his formula. The tendency just mentioned is due to the fact that every river is composed of tributaries which have their own small catchment areas but are, when measured to the general outlet or point where the discharge is under consideration, of very different lengths, to the improbability of heavy rainfall occurring over all these small areas at such times as to cause the different flood waves to arrive simultaneously at the outlet, and to the facts that in the case of the longer tributaries the flood waves flatten out (Hydraulics, Chap. IX., Arts. 3 and 4) so as to arrive more gradually, and that, unless rain is also falling all along their courses, these longer tributaries undergo losses from evaporation and absorption. But occasionally it happens that the various flood waves do arrive at the outlet more or less simultaneously, and that the rainfall continues so long and is so widely distributed—though not necessarily of the same intensity as that which caused the flood—that the flood waves do not flatten out and that losses in the channels do not occur. Floods can thus vary to an extraordinary degree in severity, and formulæ are quite useless. This is why floods occur surpassing all previous records, as, for instance, the recent floods in Paris. However severe a flood may be, it can never be said that the maximum has, even probably, been attained unless it can be shown that the rainfall has been so heavy, so long continued, and so distributed that anything worse is not likely to occur.
The best method of estimating the flood discharge of a large perennial stream is to ascertain, by local inquiry, the height to which it is known to have risen, and to take cross-sections of the channel and calculate the discharge (Chap. III., Arts. 4 and 5). In designing works, allowance can be made for a flood exceeding any known before. This method applies also to a case in which a river is formed by the junction of two or more large tributaries. It is possible that the tributaries have not, within the memory of man, been in high flood simultaneously. If so, the chances of this occurring are no greater and no less than if the stream was composed merely of a number of small affluents. Remarks regarding intermittent streams are given in Chap. III., Art. 7.
Since an acre contains 43,560 square feet, and a twelfth of this is 3630, it follows that a fall of 4 inches of rain, of which 1 inch runs off, in an hour, gives a discharge of 3630 cubic feet per hour, or about 1 cubic foot per second. This is 640 cubic feet per second for a square mile. The figures in column 5 of the above table show that the run-off was, in the cases quoted, generally far less than 1 inch. In case No. 4 it was 1 inch, and in case No. 2 it was ¾ inch.
In the case of the Kali Nadi (No. 9 in the table) an aqueduct to carry the Lower Ganges Canal over the stream was being designed. The flood discharge, estimated from the supposed flood-level and cross-section of the stream was (Min. Proc. Inst. C.E., vol. xcv.) 26,352 cubic feet per second. The discharge, estimated by assuming a fall of 6 inches of rain in twenty-four hours over the catchment area—then believed to be 3025 square miles—and a run-off of ·25 of the fall, was 114,950 cubic feet per second. This figure was rejected on the ground that the rainfall would not be continuous over so large an area as 3025 square miles. An allowance of 7 cubic feet per second per square mile was made and, a fresh survey having shown that the catchment area was only 2593 square miles, a discharge of 18,000 cubic feet per second was allowed for. The aqueduct was built, about the year 1875, with five arched spans of 35 feet each, the total area of the waterway being about 3000 square feet. The length of the piers and abutments was 212 feet, the width of the canal carried over the aqueduct being 192 feet. In 1884 the aqueduct was partly destroyed by a flood whose discharge was about 44,000 cubic feet per second. In July 1885 it was wholly destroyed by a flood whose discharge was estimated at 132,475 cubic feet per second, but was probably more. The discharge must have been more than 51 cubic feet per second per square mile. The aqueduct was rebuilt with a waterway of about 15,000 square feet. Below the aqueduct there was a bridge which had been standing for a hundred years. Its waterway was only 1146 square feet. It was not much damaged by the flood of 1884, but much of the water passed round it, breaking through the embanked roadway or pouring over it. It is understood that the bridge was destroyed by the flood of 1885.
This case shows the necessity for making every possible allowance in calculating flood discharges for important works. The smallness of the discharge, as calculated from the cross-section of the stream, was probably owing to its being dry when the survey was made, so that the velocity could not be observed, but it is probable that such a discharge as wrecked the aqueduct had never before passed down the stream.