River and Canal Engineering, the characteristics of open flowing streams, and the principles and methods to be followed in dealing with them.
In order to be able to predict the time of the arrival of a flood at the lower station the reading of a gauge there, and also of that at the upper station, should be taken at frequent intervals. In the case of large rivers and distances of hundreds of miles, the interval may be six or even twelve hours, but in other cases it should be much less. If the readings are plotted, as in fig. 56, oblique lines can be drawn to connect the saliences and depressions, and the time taken by each change can thus be readily seen. When the upper part of the stream is formed by two or more important tributaries there should be a gauge in each.
As to what constitutes a flood, the gauge diagram of a river (fig. 56) is generally such that a line can be sketched as shown dotted. The rises above this line are floods. The maximum flood discharge of a Northern Indian river is estimated roughly as being 100 times the low-water discharge. Leslie’s rule for floods in the British Isles is that if all the daily discharges of a stream during the year are ranged in order of magnitude, the discharges of the upper quarter are considered to be floods.
In India it is sometimes arranged that a telegram shall, in the low-water stage of the river, be sent from the upper station when a rise of 2 feet occurs in twenty-four hours or any less period, with a further telegram for any such subsequent rise. The telegram states the exact reading on the gauge and whether the water is rising steady or falling. This is given as indicating the procedure that may be followed where the telegraph has to be used, but when long and frequent telegrams are not desirable.
The advancing end of a flood wave may, while the wave is rising and being formed, travel rapidly, but when the wave has been formed it travels at the ordinary rate of flow of the risen stream. The advancing end of a trough may, while it is being formed, travel rapidly, but after formation it travels at the ordinary rate of the fallen stream (Hydraulics, Chap. IX., Arts. 3 and 4). Thus the rate at which a change in water-level travels down a stream depends at first on the amount of the rise or fall, but afterwards on the water-level of the risen or fallen stream.
By taking the above facts into consideration and noting the actual times obtained from the diagram, it will be possible to arrive at the probable time that will be taken by any change. It will also be possible to predict the height of the flood. If it is worth while, an empirical formula can be got out. If there are tributaries, each with a gauge, the matter will be more difficult. Probably the floods in the tributaries will arrive at different times, but even in such cases empirical formulæ have been arrived at, especially in France, and are mentioned in various volumes of the Proceedings of the Institution of Civil Engineers.
In all cases predictions are liable to be more or less upset if rain falls in the tract between the upper and lower gauges. In very dry weather the speed of a flood wave may be somewhat reduced, and the height to which it rises will almost certainly be reduced.
The full effect of a change will not be felt at the lower station unless the change at the upper station is maintained for a sufficiently long period. A short wave or trough flattens out. Thus in any empirical formula or system of prediction, the time over which the change extends at the upper gauge must be taken into account, or else there must be several upper gauges and the readings of all of them be taken into account.
In mountainous districts landslips sometimes occur and block the valley of a stream which then forms a lake. The water gradually rises and eventually flows over the dam and sweeps it away causing a flood, which is of great suddenness and height but decreases very quickly in height as it travels down the valley. In a case which occurred in the Himalayas in 1888 the inhabitants of the valleys, from the dam to the point where the river debouches from the hills, were compelled by Government to vacate all habitations below the probable level of the flood, and no loss of life occurred. Similar floods, but on a smaller scale, may be caused by the bursting of ordinary reservoir dams. In some continental rivers ice may obstruct the stream and cause floods.
5. Prevention of Floods.—The extended use of field drains has, in recent years, done much to increase the severity of floods in England and other countries. One method of mitigating or preventing floods is the construction of reservoirs for storing the water. Reservoirs locally known as “washes,” formed by setting back the embankments, exist on the Fen rivers. One wash, on the Nene, below Peterborough, is 12 miles long and half a mile wide and is filled, in floods, to a depth of 7 feet and holds 1 inch of rainfall over the river basin, and this is found to be sufficient. Reservoir construction is, however, in most cases, impracticable owing to the expense. To store the water which is given by 1 inch of rain in the basin of the Thames, a reservoir would be needed 50 feet deep and covering about 7 square miles. It might cost £7,000,000.
The afforestation or reforestation of river basins (Chap. II., Art. 4) is also occasionally undertaken, but is not generally practicable. 20
The most practicable methods for preventing flooding are lowering the water-level of the stream and constructing embankments along it. These will be considered in the next two articles.
6. Lowering the Water-Level.—The water-level of a given length of stream can be lowered by lowering the bed, widening the channel or straightening the channel. The efficiency of these processes is in the order named. As stated in Chap. I., Art. 4, the alteration to the channel must in any case be continued to some point downstream of the reach under consideration. Let the channel be supposed to be of “shallow” section with sloping sides. Let W be the mean width, D the depth, and S the slope. Let it be required to lower the water-level by an amount equal to D/5. This can be effected by lowering the bed by about 25 per cent. of D, or by increasing the width by about 50 per cent., or by increasing the slope by about 100 per cent. If the bed is lowered, V is not affected, and the mean width is reduced. Increase in W reduces D, and therefore reduces the hydraulic radius and the velocity. Hence the large amount of widening necessary. When S is increased the velocity, if R remains the same, is affected only as √S (Hydraulics, Chap. VI., Art. 2), but the depth of water is reduced and R therefore reduced. Dressing the sides of a channel, so as to make it smoother, produces the same effect as a slight widening.
It does not, of course, follow that lowering the bed is always the best plan and straightening the worst. Any one of the processes may be more or less impracticable because, for instance, of the hardness of the material to be removed, or the expense—including compensation—of removing obstructions.
A particular kind of widening consists in digging a new channel and keeping both the new and the old channel open.
If a channel contains a weir, or a local raised portion of bed forming a kind of submerged weir, or a contracted place or narrow bridge, the upstream water-level can be lowered by simply removing or reducing the obstruction. The lowering of the water-level will be greatest at the site of the obstruction, and will be zero at some point far upstream (Hydraulics, Chap. VII., Art. 5). If the raised portion forms a long shoal, its removal—supposing its height above the general bed to be the same—will have more effect than if it were short. If the height of the raised portion is small compared to the depth of water, or the amount of contraction small compared to the width of the stream, the removal may have much less effect than might appear (Chap. I., Art. 4).
In soft soils one advantage of the straightening system for lowering the water-level is that short-cuts can be dug to a small section, and left to enlarge themselves (Chap. VII., Art. 1).
Another advantage is that after any diversions have enlarged themselves to the size of the rest of the channel—or have originally been so excavated—the whole channel may scour, and the water-level continue to fall. This, of course, should be allowed for if likely to occur.
The same thing may occur in the case of the removal of a weir, shoal, or contracted piece of channel. The scour will act at first close to the site of the obstruction, but it may work upstream.
In widening or deepening a channel for the purpose of mitigating floods, it is a good plan to begin work at the downstream end, because the lowering of the water-level will extend upstream beyond the reach in which work is done, and this may facilitate work further upstream. As regards any tendency for a widened reach to silt up again, any such silting is not likely to be great in a short period of time, and need not prevent the carrying on of work in various reaches, if this is convenient.
7. Flood Embankments.—A flood embankment may be close to the edge of the river or it may be set back. If set back it need not follow all the windings of the stream. The setting back of an embankment gives an increased waterway to the stream during floods, and therefore a lower flood-level, but the effect of this is trifling in cases where the depth of the water on the flooded land is small, especially if such land is covered with vegetation, or is otherwise much obstructed. Setting back is generally necessary in cases where the stream is liable to erode the banks to any considerable extent. In such a case the embankment should not be so near to the river as to be in much danger from erosion, but the ground, as already stated (Chap. IV., Art. 9), generally falls, in going away from the river, so that when an embankment is set well back it is in lower ground, more expensive and more liable to breach. The most suitable alignment is a matter of judgment, and depends largely on the extent to which the river is likely to shift.
Embankments should, where possible, be made in straight or properly curved reaches. A flood embankment, at least at its upstream end, should terminate in ground which is above flood-level. The top of an embankment should be, in the case of a large river, 2 or 3 feet above the high flood-level of the river. It should, of course, be graded parallel to the general high flood-level, but neither the gradient nor the height of the flood is usually known with accuracy (Chap. II., Arts. 1 and 2). There is generally a record or mark of some high flood, and this is taken provisionally as the flood-level. Or the level is calculated approximately from the flood readings on the nearest river gauge. If experience shows that the embankment is too low, it is raised. The cross-section of an embankment depends on the soil, on the extent of damage which results if a breach occurs, on the funds available, and on the value of the land which the embankment has to occupy.