River and Canal Engineering, the characteristics of open flowing streams, and the principles and methods to be followed in dealing with them.

DocumentAdded to Pandi 6 November 2026
Reading progressPage 1 of 31

The Project Gutenberg eBook of River and Canal Engineering, the characteristics of open flowing streams, and the principles and methods to be followed in dealing with them.

This eBook is for the use of anyone anywhere in the United States and most other parts of the world at no cost and with almost no restrictions whatsoever. You may copy it, give it away or re-use it under the terms of the Project Gutenberg License included with this eBook or online at www.gutenberg.org. If you are not located in the United States, you will have to check the laws of the country where you are located before using this eBook.

Title: River and Canal Engineering, the characteristics of open flowing streams, and the principles and methods to be followed in dealing with them.

Author: E. S. Bellasis

Release date: April 3, 2018

eBook #56909

Language: English

Other information and formats: www.gutenberg.org/ebooks/56909

Credits: Produced by Chris Curnow, Wayne Hammond and the Online
Distributed Proofreading Team at http://www.pgdp.net (This
file was produced from images generously made available
by The Internet Archive)

*** START OF THE PROJECT GUTENBERG EBOOK RIVER AND CANAL ENGINEERING, THE CHARACTERISTICS OF OPEN FLOWING STREAMS, AND THE PRINCIPLES AND METHODS TO BE FOLLOWED IN DEALING WITH THEM. ***

RIVER AND CANAL ENGINEERING

By the Same Author

HYDRAULICS WITH WORKING TABLES. Second Edition. 160 illustrations, xii + 311 pp., 8vo (1911).

12/- net.

PUNJAB RIVERS AND WORKS. Second Edition. 47 illustrations, viii +64 pp., folio (1912).

8/- net.

IRRIGATION WORKS (in the press). 27 illustrations, vi + 130 pp., 8vo (1913).

6/- net.

THE SUCTION CAUSED BY SHIPS. Explained in Popular Language. 2 plates, 26 pp., 8vo, sewed (1912).

1/- net.

E. & F. N. SPON, LTD., LONDON

RIVER AND CANAL ENGINEERING THE CHARACTERISTICS OF OPEN FLOWING STREAMS, AND THE PRINCIPLES AND METHODS TO BE FOLLOWED IN DEALING WITH THEM BY E. S. BELLASIS, M.Inst.C.E. RECENTLY SUPERINTENDING ENGINEER IN THE IRRIGATION BRANCH OF THE PUBLIC WORKS DEPARTMENT OF INDIA 72 ILLUSTRATIONS
London E. & F. N. SPON, Ltd., 57 HAYMARKET, S.W. New York SPON & CHAMBERLAIN, 123 LIBERTY STREET 1913

TABLE OF CONTENTS
CHAPTER I
INTRODUCTION
ARTICLEPAGE
1.Preliminary Remarks1
2.Résumé of the Subject1
3.Design and Execution of Works3
4.The Hydraulics of Open Streams4
CHAPTER II
RAINFALL
1.Rainfall Statistics6
2.Available Rainfall9
3.Measurement of Rainfall13
4.Influence of Forests and Vegetation14
5.Heavy Falls in Short Periods15
CHAPTER III
COLLECTION OF INFORMATION CONCERNING STREAMS
1.Preliminary Remarks18
2.Stream Gauges19
3.Plan and Sections21
4.Discharge Observations21
5.Discharge Curves and Tables23
6.Small Streams24
7.Intermittent Streams25
8.Remarks26
CHAPTER IV
THE SILTING AND SCOURING ACTION OF STREAMS
1.Preliminary Remarks27
2.Rolled Material29
3.Materials carried in Suspension31
4.Methods of Investigation33
5.Quantity and Distribution of Silt35
6.Practical Formulæ and Figures37
7.Action on the Sides of a Channel40
8.Action at Bends42
9.General Tendencies of Streams45
CHAPTER V
METHODS OF INCREASING OR REDUCING SILTING OR SCOUR
1.Preliminary Remarks48
2.Increase of Scour or Reduction of Silting48
3.Production of Silt Deposit51
4.Arrangements at Bifurcations53
5.A Canal with Headworks in a River54
6.Protection of the Bed58
CHAPTER VI
WORKS FOR THE PROTECTION OF BANKS
1.Preliminary Remarks60
2.Spurs61
3.Continuous Lining of the Bank64
4.Heavy Stone Pitching with Apron71
CHAPTER VII
DIVERSIONS AND CLOSURES OF STREAMS
1.Diversions73
2.Closure of a Flowing Stream75
3.Instances of Closures of Streams80
CHAPTER VIII
THE TRAINING AND CANALISATION OF RIVERS
1.Preliminary Remarks84
2.Dredging and Excavating84
3.Reduction of Width85
4.Alteration of Depth or Water-Level88
5.Training and Canalising89
CHAPTER IX
CANALS AND CONDUITS
1.Banks92
2.Navigation Canals93
3.Locks96
4.Other Artificial Channels100
CHAPTER X
WEIRS AND SLUICES
1.Preliminary Remarks102
2.General Design of a Weir105
3.Weirs on Sandy or Porous Soil106
4.Various Types of Weirs111
5.Weirs with Sluices115
6.Falling Shutters121
7.Adjustable Weirs126
8.Remarks on Sluices128
CHAPTER XI
BRIDGES AND SYPHONS
1.Bridges132
2.Syphons and Culverts135
3.Training Works136
CHAPTER XII
DRAINAGE AND FLOODS
1.Preliminary Remarks141
2.Small Streams141
3.Rivers146
4.Prediction of Floods150
5.Prevention of Floods153
6.Lowering the Water-Level154
7.Flood Embankments156
CHAPTER XIII
RESERVOIRS AND DAMS
1.Reservoirs162
2.Capacity of Reservoirs167
3.Earthen Dams174
4.Masonry Dams181
CHAPTER XIV
TIDAL WATERS AND WORKS
1.Tides190
2.Tidal Rivers192
3.Works in Tidal Rivers196
4.Tidal Estuaries197
5.Works in Tidal Estuaries198
CHAPTER XV
RIVER BARS
1.Deltaic Rivers203
2.Other Rivers205
Appendix A. Fallacies in the Hydraulics of Streams209
Appendix B. Pitching and Bed Protection212
Index213

PREFACE

The object of this book is to describe the principles and practice adopted in the Engineering of Open Streams. If the book seems to be somewhat small for its object, it will, it is hoped, be found that this is due to care in the arrangement and wording.

Sources of information have been acknowledged in the text, but special mention may be made of lectures given by Professor Unwin at Coopers Hill College, of Harcourt’s large work on Rivers and Canals, of the papers 1 by Binnie on rainfall, by Shaw on the closing of the river Tista, by Harcourt on movable weirs and on estuaries, by Strange on reservoirs, and by Ottley and Brightmore, Gore and Wilson, and Hill on the stresses in masonry dams; of the articles by Bligh 2 on weirs with porous foundations and by Deacon 3 on reservoir capacity, of the Indian Government paper by Spring on “River Control on the Guide Bank System,” and of the Punjab Government paper containing Kennedy’s remarks on silting and scour in the Sirhind Canal. The two papers last mentioned are not easily accessible, and they contain matter of great interest. The important points, often obscured by masses of detail or figures, have been extracted. 4

Silting and scour (Chap. IV.) had already been dealt with in Hydraulics, 5 but some further information has since come to light and the subject has been treated afresh and the matter re-written.

E. S. B.

Cheltenham, 1st May 1913.

RIVER AND CANAL ENGINEERING

CHAPTER I INTRODUCTION

1. Preliminary Remarks.—River and Canal Engineering is that branch of engineering science which deals with the characteristics of streams flowing in open channels, and with the principles and methods which should be followed in dealing with, altering, and controlling them. It is not necessary to make a general distinction between natural and artificial streams; some irrigation canals or other artificial channels are as large as rivers and have many of the same characteristics. Any special remarks applicable to either class will be given as occasion requires.

2. Résumé of the Subject.—Chap. II. of this book deals with the collection of information concerning streams, a procedure which is necessary before any considerable work in connection with a stream can be undertaken, and often before it can even be decided whether or not it is to be undertaken. Chap. III. deals with rainfall, and describes how rainfall figures and statistics can be utilised by the engineer in dealing with streams.

Chap. IV. explains the laws of silting and scouring action, a subject of great importance and one to which the attention ordinarily given is insufficient. The general characteristics of streams, being due entirely to silting or scouring tendencies, are included in this chapter. Chap. V. describes how silting or scouring may be, under some circumstances, artificially induced or retarded.

Chap. VI. deals with various methods of protecting banks against erosion or damage. Chap. VII. treats of diversions or the opening out of new channels, and with the opposite of this, viz. the closing of channels, a feat which, when the stream is flowing, is sometimes very difficult to achieve. This chapter also deals with dredging and excavation.

Chap. VIII. discusses the subject of the training of streams, a class of work which is generally undertaken in order to make them navigable or to improve their existing capacities for navigation, but may be undertaken for other reasons. The main features of this kind of work are the narrowing and deepening of the stream, often the reduction of the velocity and slope, and generally the raising of the water-level. In this kind of work a channel may be completely remodelled and even new reaches constructed. Chap. IX. deals with artificial channels of earth or masonry, and includes navigation canals. 6

In Chaps. X. and XI. the chief masonry works or isolated structures—as distinguished from general works which extend over considerable lengths of channel—are dealt with, and those principles of design discussed which affect the works in their hydraulic capacities. General principles of design applicable to all kinds of works, such as the thicknesses of arches or retaining walls, are not considered; they can be found in books on general engineering design.

Chap. XII. treats of storm waters and river floods, and shows how works can be designed for getting rid of flood water and how floods can be mitigated or prevented, one of the chief measures, the widening of the channel and the lowering of the water-level, being the opposite of that adopted for training works. Embankments for stopping flooding are also dealt with. Chap. XIII. deals with reservoirs, including the design of earthen and masonry dams.

Chaps. XIV. and XV. deal with tidal waters, river mouths and estuaries, and works in connection with them, viz. the training of estuaries and the methods of dealing with bars, the object being in all cases the improvement of the navigable capacities of the channels.

3. Design and Execution of Works.—After obtaining full information concerning the stream to be dealt with, careful calculations are, in the case of any large and important work, made as to the effects which will be produced by it. These effects cannot always be exactly foreseen. Sometimes matters can be arranged so that the work can be stopped short at some stage without destroying the utility of the portion done, or so that the completed work can be altered to some extent.

In works for controlling streams there is, as will appear in due course, a considerable choice of types of work and methods of construction. In practice it will generally be found that there are, in any particular locality, reasons for giving preference to one particular type or kind of work or, at all events, that the choice is limited to a few of them, either because certain kinds of materials and appliances can be obtained more cheaply and readily than others, or because works of a particular type have already been successfully adopted there, or because the people of the district are accustomed to certain classes of work or methods of construction. In out-of-the-way places it is often undesirable to avoid any type of work which cannot be quickly repaired or readily kept in order by such means as exist near the spot.