All public Sources
Public document

Maxims and Instructions for the Boiler Room Useful to Engineers, Firemen & Mechanics; Relating to Steam Generators, Pumps, Appliances, Steam Heating, Practical Plumbing, etc.

DocumentAdded to Pandi 6 November 2026
Reading progressPage 15 of 52

RULES AND TABLES FOR DETERMINING AREAS AND CALCULATING THE CONTENTS OF STEAM AND WATER SPACES IN THE STEAM BOILER.

In order to ascertain the number of braces, which are necessary to strengthen that part of the boiler head, which is not stayed by the tubes, it is first necessary to know its area; the part to be stayed is a segment of a circle.

The length of the segment is measured above the top row of the tubes, and its height or width is equal to the distance from the top of the tubes to the top of the boiler shell.

Since, however, part of this segment is braced by the boiler shell, and also by the top row of the tubes, it has been generally agreed that the length of the segment should be measured two inches above the tubes, and the height or width, should be measured from a line, drawn two inches above the tubes, to a point within three inches from the top of the boiler shell, as shown in the illustration by the dotted line. Thus, referring to Fig. D, the length of the segment is equal to l, and the height is equal to h.

Rule. The area of a segment may be obtained, very approximately, by dividing the cube of the width (or height) by twice the length of the chord, and adding to the quotient the product of the width into two-thirds of the chord.

Example. If we suppose the height h of the segment in Fig. D to be equal to 18 inches, and the length l to be equal to 48 inches, we have

18³ ÷ (48 × 2) + (48 × 2⁄3 × 18) = 60.7 + 576.0 = 636.7 square inches.

Fig. C.Fig. D.

In order to calculate the contents of the steam and water spaces of a boiler, the same rule, as above, may be employed. The volume of the steam space may be readily obtained by the above rule, taking the distance from the water level to the top of the shell for the height, and the diameter of the shell, measured at the water line, for the length of the segment lines.

The area of the segment thus found, expressed in square inches, divided by 144, and multiplied by the length of the boiler in feet, is equal to the steam space, in cubic feet, this result is slightly reduced by the space occupied by the braces.

In order to find the volume of the water space, it is first necessary to find the total area of the boiler head, and this minus the area of the segment above the water line, is equal to the area of the segment below the water line. From this must also be subtracted the combined cross sectional area of the tubes.

Thus, the rule for finding the volume of the steam space in cubic feet.

1. Find the area of the segment of the boiler head, above the water line, in square inches.

2. Divide this by 144, and multiply the quotient by the length of the boiler in feet.

To find the volume of the waterspace in cubic feet.

1. Find the area of the boiler head in square inches.

2. Multiply the square of the outside diameter of one tube by .7854, and multiply this by the number of tubes, and add to the product, the area of the segment above the waterline.

3. Subtract 2 from 1, and divide the remainder by 144.

4. Multiply the quotient by the length of the boiler in feet.

To find the number of braces, necessary for the flat surface above the tubes.

1. Find the area of the segment of the boiler head, which is to be braced, in square inches.

2. Multiply the area, thus found, by the steam pressure in pounds per square inch.

3. Multiply the cross sectional area of one brace by the number of pounds, which it is allowed to carry, per square inch of section.

4. Divide product 2 by product 3, and the result is the number of braces, required for the head.

Table No. 1 gives the total area in square inches. No. 2, areas to be braced. No. 3, number of braces of one inch round iron required, allowing seven thousand five hundred pounds per square inch of section at one hundred pounds steam pressure.

Table No. 3 will be found of more practical use than Table 2, for it gives directly the number of braces required in any given boiler, instead of the area to be braced. It was calculated from Table 2. The iron used in braces will safely stand a continuous pull of 7,500 pounds to the square inch, which is the figure used in computing the foregoing table. A round brace an inch in diameter has a sectional area of .7854 of an inch, and the strain that it will safely withstand is found by multiplying .7854 by 7,500, which gives 5,890 pounds as the safe working strain on a brace of one-inch round iron.

In a 60-inch boiler, whose upper tubes are 28 inches below the shell, the area to be braced is, according to table 2, 930 square inches. If the pressure at which it is to be run is 100 pounds to the square inch, the entire pressure on the area to be braced will be 93,000 pounds, and this is the strain that must be withstood by the braces. As one brace of inch-round iron will safely stand 5,890 pounds, the boiler will need as many braces as 5,890 is contained in 93,000, which is 15.8. That is, 16 braces will be required. The table is made out on the basis of 100 lbs. pressure to the square inch, because that is a very convenient number.

Table No. 1. TOTAL AREA ABOVE TUBES OR FLUES.

(Square Inches.)

Height from
tubes to
shell.
DIAMETER OF BOILER IN INCHES.
36424854606672
15389      
16419      
17458526     
18 566620667   
19 608667720   
20 650714770824  
21  756824882  
22  808878937  
23   9309961059 
24   98210561121 
25   103711161184 
26   1090120912521324
27   1145123413161394
28    129113811465
29    135214451536
30    141415111608
31     15761674
32     16411746
33      1818
34      1896

Table 2. AREAS TO BE BRACED. (Square Inches.)

Height from
tubes to
shell.
DIAMETER OF BOILER IN INCHES.
36424854606672
15206      
16235      
17264297     
18 331365396   
19 316404439   
20 401444483519  
21  485528568  
22  526574618  
23   620668714 
24   667720769 
25   714772825 
26   761824882937
27   809877940998
28    9309981061  
29    9831056  1124  
30    1037  1115  1187  
31     1174  1252  
32     1234  1317  
33      1382  
34      1447  

Table 3. NUMBER OF BRACES REQUIRED, AT 100 LBS. PRESSURE.

Height from
tubes to
shell.
DIAMETER OF BOILER IN INCHES.
36424854606672
153.5      
164.0      
174.55.0     
18 5.66.2  6.7   
19 6.26.9  7.5   
20 6.87.5  8.2  8.9  
21  8.2  9.0  9.6  
22  8.9  9.810.5  
23   10.511.312.1 
24   11.312.213.1 
25   12.113.114.0 
26   12.914.015.015.9
27   13.714.916.016.9
28    15.816.918.0
29    16.717.919.1
30    17.618.920.2
31     19.921.3
32     21.022.4
33      23.5
34      24.9

In Table 2 this calculation has been made for all sizes of boilers that are ordinarily met with. The area to be braced has been calculated as above in each case, the two-inch strip above the tubes, and the three-inch strip around the shell being taken into account. As an example of its use, let us suppose that upon measuring a boiler we find that its diameter is 54 inches, and that the distance from the upper tubes to the top of the shell is 25 inches. Then by looking in the table under 54″ and opposite 25″ we find 714, which is the number of square inches that requires staying on each head.

BOILER TUBES.

Table.

Dimensions of Lap Welded Boiler Tubes.

Size outside
diameter.
Wire Gauge.Weight per
foot.
1inch.15  0.708
11⁄4„15  0.9    
11⁄2„14  1.250
13⁄4„13  1.665
2„13  1.981
21⁄4„13  2.238
21⁄2„12  2.755
23⁄4„12  3.045
3„12  3.333
31⁄4„11  3.958
31⁄2„11  4.272
33⁄4„11  4.590
4„10  5.320
41⁄2„10  6.010
5„  9  7.226
6„  8  9.346
7„  812.435
8„  815.109
9„       71⁄2  
10„       61⁄2 

The above is the regular manufactures’ list of sizes and weights.

Note.

Boiler tubes are listed and described from the outside diameter. This should be noted, as gas-pipe is described from the inside diameter. Thus a 1-inch gas-pipe is nearly 11⁄4 outside diameter while a 1-inch boiler tube is exactly one inch. Another difference between the two consists in the fact that the outside of boiler tubes is rolled smooth and even; gas-pipe is left comparatively rough and uneven.

When the boiler tubes are new and properly expanded there is a large reserve or surplus of holding power for that part of the tube sheet supported by them, this has been proved by experiment made by chief engineer W. H. Stock, U. S. N., as shown in the following

Table of Holding Power of Boiler Tubes.

Outside diameter
of end of tube
where fracture
took place.
Area of cross
section of
body of tube.
Thickness of
tube plate.
Strain in
pounds. Mean
result.
Method of Fastening.
Inches.Sq. ins.Inches.Pounds. 
25⁄8.9817⁄1622650

Expanded by Dudgeon tool, end riveted over.

25⁄8.9817⁄1622150

Expanded by Dudgeon tool, end partly riveted over.

23⁄8.9813⁄825525

Expanded by Dudgeon tool, end riveted over.

23⁄8.9813⁄829675

Expanded by Dudgeon tool, ferruled, not riveted over.

23⁄8.9813⁄813050

Simply expanded by Dudgeon tool.

Mr. C. B. Richards, consulting engineer at Colt’s Armory at Hartford, Conn., made some experiments as to the holding power of tubes in steam boilers, with the following results: The tubes were 3 inches in external diameter, and 0.109 of an inch thick, simply expanded into a sheet 3⁄8 of an inch thick by a Dudgeon expander. The greatest stress without the tubes yielding in the plate was 4,500 pounds, and at 5,000 pounds was drawn from the sheet. These experiments were repeated with the ends of the tubes which projected through the sheet three-sixteenths of an inch, being flared so that the external diameter in the sheet was expanded to 3.1 inches. The greatest stress without yielding was 18,500 pounds; at 19,000 pounds yielding was observed; and at 19,500 pounds it was drawn from the sheet. The force was applied parallel to the axis of the tube, and the sheet surfaces were held at right angles to the tube axis.

Note.

When the tube sheet and tube ends near the sheet become coated with scale or the tubes become overheated, the holding power of the tubes becomes largely reduced, and caution must be used in having the tube ends re-expanded and accumulated scale removed.

Continue reading
Page 15 of 52