DESCRIPTION OF PAGE ILLUSTRATION.

In fig. 27, F B represents the fire box or furnace; F D, fire door; D P, deflector plate; F T P, fire box tube plate; F B R S, fire box roof stays; S T P, smoke box tube plate; S B, smoke box; S B D, smoke box door; S D, steam dome; O S, outer shell; R S V, Ramsbottom safety-valve; F, funnel or chimney.

Fig. 28.

The crown plate of the fire-box being flat requires to be efficiently stayed, and for this purpose girder stays called fox roof stays are mostly used, as shown in the figure. The stays are now made of cast steel for locomotives. They rest at the two ends on the vertical plates of the fire-box, and sustain the pressure on the fire-box crown by a series of bolts passing through the plate and girder stay, secured by nuts and washers. Fig. 28 is a plan and elevation of a wrought-iron roof stay.

Another method adopted in locomotive types of marine boilers for staying the flat crown of the fire-box to the circular upper plate is shown in fig. 29—namely, by wrought-iron vertical bar stays secured by nuts and washers to the fire-box with a fork end and pin to angle-iron pieces riveted to the boiler shell.

Fig. 29.

The letters in this figure refer to the same parts of the boiler as do those in fig. 27, i.e., F B to the fire-box, etc., etc.

It was formerly the custom to make the tubes much longer than shown in the fig., with the object of gaining heating surface; but modern experience has shown that the last three or four feet next the smoke box were of little or no use, because, by the time the products of combustion reached this part of the heating surface, their temperature was so reduced that but little additional heat could be abstracted from them. The tubes, in addition to acting as flues and heating surface, fulfil also the function of stays to the flat end of the barrel of the boiler, and the portion of the fire box opposite to it.

In addition to the staying power derived from the tubes, the smoke box, tube plate and the front shell plate are stayed together by several long rods.

The Horizontal Tubular Boiler.—Fig. 30.

STANDARD HORIZONTAL TUBULAR STEAM BOILER.

TABLE OF SIZES, PROPORTIONS, ETC.:

Diameter
of
Shell.
Length
of
Shell.
Gauge
of
Shell.
Gauge
of
Heads.
Number
of
Tubes.
Diameter
of
Tubes.
Length
of
Tubes
Square
feet of
Heating
Surface.
Nominal
Horse
Power.
72in.19ft.4in.3⁄8in.1⁄2in.80  4in.18ft.0in.1,500100
72„18„4„3⁄8„1⁄2„86  31⁄2„17„0„1,500100
72„17„4„3⁄8„1⁄2„108    3„16„0„1,500100
66„18„4„3⁄8„1⁄2„74  31⁄2„17„0„1,35090
66„17„4„3⁄8„1⁄2„92  3„16„0„1,35090
60„18„3„3⁄8„1⁄2„78  3„17„0„1,20080
60„17„3„3⁄8„1⁄2„76  3„16„0„1,12575
60„16„3„3⁄8„1⁄2„77  3„15„0„1,05070
60„16„3„3⁄8„1⁄2„70  3„15„0„97565
60„16„3„3⁄8„1⁄2„64  3„15„0„90060
54„17„3„5⁄16„7⁄16„60  3„16„0„90050
54„17„3„5⁄16„7⁄16„56  3„16„0„82555
54„16„3„5⁄16„7⁄16„52  3„15„0„75050
54„16„3„5⁄16„7⁄16„46  3„15„0„67545
54„16„3„5⁄16„7⁄16„40  3„15„0„60040
48„17„2„5⁄16„7⁄16„50  3„16„0„75050
48„16„2„5⁄16„7⁄16„48  3„15„0„67545
48„16„2„5⁄16„7⁄16„42  3„15„0„60040
42„16„2„1⁄4„3⁄8„36  3„15„0„52585
42„15„2„1⁄4„3⁄8„32  3„14„0„45030
42„14„2„1⁄4„3⁄8„28  3„13„0„37525
36„14„2„1⁄4„3⁄8„36  21⁄2„13„0„37525
36„14„2„1⁄4„3⁄8„28  21⁄2„13„0„30020
36„13„2„1⁄4„3⁄8„20  21⁄2„12„0„22515
36„12„2„1⁄4„3⁄8„14  21⁄2„11„0„15010

Note.

In estimating the horse power by means of the above table, 15 square feet has been allowed for each horse power, and the number of feet in each boiler is given in round numbers. This table is one used in every-day practice by boiler makers.

THE FLUE BOILER.

The Two Flue Boiler.—Fig. 31.
The Six Inch Flue Boiler.—Fig. 32.

THE HORIZONTAL TUBULAR STEAM BOILER.

The great majority of stationary boilers are cylindrical or round shaped, because—

1. The cylindrical form is the strongest.

2. It is the cheapest.

3. It permits the use of thinner metal.

4. It is the safest.

5. It is inspected without difficulty.

6. It is most symmetrical.

7. It is manufactured easier.

8. It resists internal strain better.

9. It resists external strain also.

10. It can be stayed or strengthened better.

11. It encloses the greatest volume with least material.

12. It is the result of many years’ experience in boiler practice.

13. It is the form adopted or preferred by all experienced engineers.

It follows, too, that the horizontal tubular boiler, substantially as shown in fig. 30, is the standard steam boiler; engineers and steam power owners cling with great tenacity to this approved form, which is an outgrowth of one hundred years’ experience in steam production.

In the plain horizontal tubular boiler shown in cuts, the shell is filled with as many small tubes varying from two inches to four inches in diameter as is consistent with the circulation and steam space. In firing this type of boiler the combustion first takes place under the shell, and the products, such as heat, flame, and gas, pass through the small tubes to the chimney, although in the triple draught pattern of the tubular boiler, the heat products pass, as will hereafter be explained, a second time through the boiler tubes, making three turns before the final loss of the extra heat takes place.

The illustrations on pages 78 and 80 exhibit the gradual advances to the horizontal tubular by the two-flued boiler (fig. 31) of the six flues (fig. 32) and of the locomotive Portable Boiler (fig. 33). The vertical or upright tubular boiler is but another modification of the horizontal tubular.

The Locomotive Portable Boiler.—Fig. 33.

In parts of the vertical boiler there is very little circulation and the corrosion on the inner side is such as to wear the boiler rapidly. In the ash pit, ashes and any dampness that may be about the place also causes rapid corrosion. The upper part of the tubes and tube sheet are frequently injured; for instance, if the tubes pass all the way through to the upper tube sheet, providing there is no cone top, when the fire is first made under the boiler, combustion at times does not take place until the gases pass nearly through the tubes. The water usually being carried below the tube sheet there is a space left above the water line, where there is neither steam nor water, and the heat is so great that the ends of the tubes are burned and crystalized, and the tube sheet is often cracked and broken by this excessive heat before the steam is generated. The first difficulty is experienced in “the legs” of the Portable Locomotive boiler—hence the general verdict of steam users in favor of the round shell, many-tubed boiler.

PARTS OF THE TUBULAR BOILER.

The Shell. This is the round or cylindrical structure which is commonly described as the boiler, in which are inserted the braces and tubes, and which sustains the internal strain of the pressure of the steam, the action of the water within, and the fire without.

The Drum. This part is sometimes called the dome, and consists of an upper chamber riveted to the top of the boiler for the purpose of affording more steam space.

The Tube Sheets. These are the round, flat flanged sheets forming the two ends of the boiler, into which the tubes are fastened.

The Manhole Cover. This is a plate and frame commonly opening inwards and large enough to admit a man into the interior of the boiler. These openings are sometimes made on the top and sometimes at the end of the boiler. Manhole openings in steam boilers should invariably be located in the head of the boiler, except in rare cases that may arise, when circumstances require it to be placed in the shell. The manhole, so placed, will not materially reduce the strength of the boiler, and from this position it can more readily be seen that the boiler is kept in proper condition. The proper sizes for manholes are 9×5 and 10×16, according to circumstances. These are amply large for general use and no material advantage is gained by increasing them.

The Hand Hole Plates. These are similar arrangements to the manhole cover, except as to size. They are made large enough to admit the hand into the boilers for the purpose of removing sediment and they are also used for the purpose of inspecting the interior of the boiler. Two are usually put in each boiler, one front and one in the rear.

The Blow Off. This consists of pipes and a cock communicating with the bottom of the boiler for the purpose of blowing off the boiler or of running off the water when the former needs cleaning.

THE TRIPLE DRAUGHT TUBULAR BOILER.—Fig. 34.

THE TRIPLE DRAUGHT TUBULAR BOILER.

This boiler, which is extensively used by the manufacturers of New England, is, as will be seen by the illustration, of the horizontal tubular class, and is essentially different from the well known type only in the arrangement of the tubes. The method secures the passage of the products of combustion through the same shell twice; forward through a part of the tubes, and backwards through the remaining ones. The manner of accomplishing this result can be best described by explaining how a common tubular boiler may be remodelled so as to carry out this principle.

Fig. 35.

A cylindrical shell, as shown in Fig. 34—of sufficient size to encircle about one-half of the tubes, is attached to the outside of the rear head below the water line, and extended backward to the back end of the setting. The encircled tubes are lengthened and carried backward to the same point; the extension is closed in and made to communicate with the boiler proper; the inner tubes emerge to the flue leading to the chimney and the old connection from the smoke arch is cut off. With this arrangement, the outer tubes of the boiler—a cluster on each side of the supplementary shell carry the products of combustion forward to the front smoke arch, and the inner tubes carry them backward to the chimney.

Fig. 35 exhibits the boiler in half section and shows the course of the heat products through one of the outer tubes and returning through the boiler by one of the inner cluster.