Excavation of Foundation for the Lighthouse Tower on the Skerryvore Rock. The excavation of the foundation of the Lighthouse Tower was the first operation which engaged my attention at Skerryvore Rock, at the beginning of the season of 1839. It was commenced on the 6th of May, and was continued up to the last hour of our remaining on the Rock, on the 3d of September. A more unpromising prospect of success in any work than that which presented itself at the commencement of our labours, I can scarcely conceive. The great irregularity of the surface, and the extraordinary hardness and unworkable nature of the material, together with the want of room on the Rock, greatly added to the other difficulties and delays, which could not fail, even under the most favourable circumstances, to attend the excavation of a foundation-pit on a rock at the distance of 12 miles from the land. The Rock, as already noticed, is a hard and tough gneiss, and required the expenditure of about four times as much labour and steel for boring as are generally consumed in boring the Aberdeenshire granite.

After a careful survey of the Rock, and having fully weighed all the risks of injuring the foundation, I determined at once to enter upon a horizontal cut, so as to lay bare a level floor of extent sufficient to contain the foundation pit for the Tower. The very rugged and uneven form of the Rock made this an almost necessary precaution, in order to prevent any misconception as to its real state, for it was traversed by numerous veins and bands inclined at various angles, on the position and extent of which the stability of the foundation in no small degree depended. That operation occupied 30 men for 102 days, and required the firing of no fewer than 246 shots, chiefly horizontal, while the quantity of material removed did not greatly exceed 2000 tons. It was a work of some hazard; for the small surface of the Rock confined us within 30, and sometimes within a dozen yards of the mines, while its form afforded us no cover from the flying splinters. The only precautions we could adopt were to cover the mines with mats and with coarse nets, which I had caused to be made during the previous winter, of the old ropes of one of the Lighthouse Tenders, and in each blast to apportion very carefully the charge of powder to the work that was to be done. That was managed with great skill by Charles Barclay, the foreman of the quarriers, who charged all the bores, and, along with myself, fired all the shots. So completely did the simple expedient of covering the bores with nets and mats check the flight of the stones, that, except on one or two occasions, none of the splinters reached us, and all the damage done was a slight injury to one of the cranes. Perhaps, also, our safety may, in some measure, be attributed to a change which I introduced into the mode of charging the horizontal shots, by which all the risk of pushing home the powder in the ordinary mode with the tamping rod is avoided. That change consisted in using a kind of shovel, formed of a rod, armed with a hollow half-cylinder of sheet copper, which contained the powder, and being inverted by giving the rod half a turn round its axis, made the powder drop out when the cylinder reached the bottom of the bore. It was, in all respects, excepting size, the same as the charging-rod used for great guns. The amount of materials removed by blasting, as nearly as I could ascertain, was only about 1000 cubic yards; and, taking all the circumstances into account, it may be doubted whether there be any instance in modern engineering of an operation of so small an extent occupying so much time, and involving so great risk. The blasting of the Rock, however, was not the only difficulty with which we had to contend, for it also became necessary to remove the quarried materials, amounting to about 2000 tons, into the deep water round us, to prevent their being thrown by the waves upon the Rock, and so endangering the future temporary Barrack. That was rather a laborious work, and occupied two cranes, with temporary runs and trucks, during the greater part of the time we spent on the Rock. I am well aware that the quantity of materials which I have just mentioned, will be apt to produce a smile from those who have been chiefly conversant with the gigantic but simple operations which generally characterize the great railways of this country; but if it be remembered that we were at the mercy of the winds and waves of the wide Atlantic, and were every day in the expectation of a sudden call to leave the Rock, and betake ourselves to the vessel, and on several occasions had our cranes and other tools swept into the sea, the slowness of our progress will excite less surprise; and still less will those who duly weigh the dangers of our daily life, both in our little vessel and on the Rock, and who, at the same time, reflect on the many striking proofs which we almost every hour experienced of the care of an Almighty hand, be disposed to withhold their sympathy from the heartfelt expressions of gratitude which often went round our little circle in the boats, as we rowed in the twilight from the Rock to the ship. Isolation from the world, in a situation of common danger, produces amongst most men a freer interchange of the feelings of dependence on the Almighty, than is common in the more chilly intercourse of ordinary life.

With a view to lessen the dangers of blasting in such a situation, I had provided a galvanic battery on the plan proposed by Mr Martyn Roberts, but I used it less frequently than I intended. The attachments of the wires were very liable to be broken from various causes, where there were many men congregated in a small space; and as we could not venture to leave the apparatus on the Rock, the frequent re-shipment of it in a heavy sea was another cause of the derangement of its parts. I soon, therefore, laid it aside, and only had recourse to it when any work was to be done under water, or in cases where the simultaneous firing of several mines (for which it is admirably adapted) was of importance in effecting any special purpose.

When the floor had been roughly levelled I again carefully surveyed the Rock, with the view of fixing precisely the site of the foundation-pit, and of taking advantage of its form and structure to adopt the largest diameter for the Tower of which the Rock would admit. In some places I found that parts of the Rock, apparently solid, had been undermined by the constant action of the waves, to the distance of 13 feet inward from its face; but none of those cavernous excavations reached the main nucleus, so that, after much deliberation and repeated examinations of all the veins and fissures, I was enabled to mark out a foundation-pit 42 feet in diameter, on one level throughout. That was a point of no small importance; and although it had cost great labour at the very outset, much time was saved by it in the subsequent stages of the work. Not only was the labour thereby avoided of cutting the rock into separate terraces, and fitting the blocks to each successive step, as was done by Smeaton at the Eddystone; but the certainty that we had a level foundation to start from, enabled us at once to commence the dressing of stones without regard to any irregularities in the surface of the Rock; and the building operations, when once commenced, continued unimpeded by the necessity for accommodating the courses to their places in the foundation-pit, so that the Tower soon rose above the level, at which there was the greatest risk of the stones being removed by the waves before the pressure of the superincumbent building had become great enough to retain them in their places.

The outline of the circular foundation pit, 42 feet in diameter, having been traced with a trainer on the rock, numerous jumper-holes were bored in various places, having their bottoms all terminating in one level plane, so as to serve as guides for the depth to which the basin was to be excavated. The depth did not exceed 15 inches below the average level, already laid bare by the cutting of the rough horizontal floor which has just been described; and before the close of the season of 1839, about one-third of the area of the circle had been cleared, and was ready for the final pick-dressing which prepared it for the reception of the first course. The excavation of this circular basin was conducted with the greatest caution, and few shots were permitted to be fired lest the foundation should in any place be shaken by the action of the gunpowder on any of the natural fissures of the Rock. The work was chiefly done by means of what are called plugs and feathers, the form of which has already been shewn in the woodcuts (No. 12, p. 115). In that part of the work the bores were nearly horizontal, and the action of the plug and feathers was to throw up a thin superficial shelf or paring of rock of from 6 to 12 inches in depth, and not more than 2 feet square. By that painful process an area of about 1400 superficial feet was cleared. The chief trouble connected with that operation was cutting, by means of the pick, a vertical face for the entrance of the horizontal jumpers or boring rods; and wherever advantage could be taken of natural fissures it was gladly done. Another considerable source of labour was the dressing of the vertical edges of the basin, as that implied cutting a square check, 15 inches deep and about 130 feet long, in the hardest gneiss rock; and the labour attending which, can only be fully estimated by a practical stone-cutter who has wrought in such a material. The plan employed was to bore all around the periphery of the circle, 1⁵⁄₈ inch vertical jumper-holes, 6 inches apart, to the required depth, and to cut out the stone between them. The surface thus left was afterwards carefully dressed, so as to admit vertical and horizontal moulds, representing truly the form of the masonry which the check was intended to receive. The experience of the labour attending that operation gave me great reason for congratulation on having adopted a foundation on one level throughout, instead of cutting the rock into several terraces, at each of which the same labour of cutting angular checks must necessarily have been encountered. The cutting of the foundation occupied 20 men for 217 days in all, whereof 168 days were in the season of 1839, and the rest in the summer of 1840.

The minute details given in my account of the destruction of the first Barrack, have entirely superseded the need for any particular description of the fitting up of the second Barrack on the Rock; and I shall therefore confine myself to a brief notice of the work in the chronological order in which it occurred. Fitting up of the Second Barrack on the Rock. On the 1st of July, after the level floor for the foundation of the Tower had been roughly cleared, and all risk of injury from the firing of mines was past, the boring of holes for the fixtures of the second Barrack was begun; and so great were our exertions, that in the short period of fourteen days, the pyramidal frame-work on which the Barrack-house was to stand (see Plate V.), consisting of 13 beams, of about 50 feet in length, with all their braces, ties and stancheons, and the malleable iron cap which secured their union at the top, was firmly fixed on the Rock. After the pyramid was completed, the Barrack-house (which had previously been removed from North Bay, where, as already noticed, it had served as a temporary abode for the men who opened the quarries there), was transported, piece-meal, from Hynish to the Rock as required; for it was not considered prudent, after the experience of last year, to trust, even in the finest part of the season, a great quantity of timber to lashings on the Rock. The fitting-up of the Barrack-house was completed on the 3d September and occupied only eleven days; so that the whole work extended to only twenty-five days, a remarkably short time for such a work, in such a situation. That despatch, indeed, was only obtained by working (as we did both during the excavation of the foundation and the erection of the Barrack), at all times when the weather would permit, from four o’clock in the morning till eight, and even nine in the evening, with an interval of only half-an-hour for breakfast and the same for dinner. The erection of the Barrack was a work of great difficulty and anxiety; for, as every thing depended on the exact union of all its parts, the slightest error in any dimension would have stopped the work until it could be remedied, a delay which, in such a situation, would, at certain stages of its progress, have proved fatal to the whole structure. Sudden death of George Middlemiss. I cannot, therefore, omit this opportunity of paying a tribute, in passing, to the memory of the late Mr George Middlemiss, the foreman of the carpenters who fitted up the Barrack, whose zeal for the completion of the work was very conspicuous. Poor Middlemiss died very suddenly at Hynish, about a fortnight after the completion of his labours on the Rock. He had received some instructions from me, so late as 11 o’clock, on the night of the 20th September; and when one of the men went to call him next morning at 6 o’clock, he was found dead, and in such a state as led Mr Moxey, the surgeon attached to the works, after a careful examination, to conclude, that he had died of paralysis of the heart, about three hours before he was found, or not more than four hours after I had seen him, to all appearance, in perfect health!