Account of the Skerryvore lighthouse
From this book
On the day on which I received this discouraging intelligence, I requested a special meeting of the Committee, for the purpose of deliberating as to the best course to be pursued, when I received instructions to proceed to the Rock, and for that purpose to hire a steamer at Glasgow. Proceed to Skerryvore. I accordingly started that very evening for Skerryvore, with the intention at the same time of removing such of the men from Tyree as were not to be employed during the winter. I left Greenock in the steamer Tobermory, accompanied by Mr Macurich of the Lighthouse tender, at midnight of the 14th November, after some delay in repairing a leak in the boiler, which was discovered in time before starting, and reached Hynish at 11 on the forenoon of the 16th, having got a good passage round the Mull of Kintyre. The weather was, however, in every other respect most unfavourable for the purpose; and having merely touched, in passing Tyree, at the workyard at Hynish, to inquire whether any thing farther had transpired, and to take on board Mr Charles Barclay, who had visited the Rock after the loss of the barrack, we at once proceeded and reached Skerryvore about 4 o’clock in the afternoon. The sea ran very high, and there was not the most remote chance of landing, but, having got into the boat, I approached near enough to the Rock to enable me to survey State in which the Rock was found. the melancholy remains of our labours, which seemed to be in the same state in which they were described by Mr Hogben. The beam which lay back on the inclined ledge still kept its place, having been firmly lashed by Mr Charles Barclay to a ring which was near it when he landed on the 10th November; and I could see the remains of some of the stancheons and of the crabs which the sea had left. After waiting, in the hope of a change in the state of the sea, until it was nearly dark, we again turned towards Tyree, in all the gloom of a stormy night, and depressed by mingled disappointment and sad forebodings, occasioned by the fate of our intended asylum from the waves. Owing to the heavy sea, and a strong gale against us, we hung for a long time off Hynish Point, and did not reach the Bay till midnight. Next morning about 7, we came off Hynish, in order to take in the men who were to go home for the winter. The ground was deeply covered with snow, which made the embarkation of so many persons and so much baggage a tedious and uncomfortable operation; and when we sailed, we experienced all the inconveniences of a strong gale and a heavy sea, with the concomitant of a deck covered with passengers, all very sick and much dispirited. Many of the men, indeed, seemed to be as deeply concerned for the loss we had sustained as I myself was. To add to our difficulties, the vessel, under the care of a native pilot, had touched slightly on a rock off Hynish Point, and gave some indications of leaking. We, however, reached Oban in safety.
No. 10.
Various conjectures were made as to the cause of the destruction of the barrack. Those who saw it erected were so confident of its stability, that they could not avoid connecting its failure with some injury received from the wreck-timber, which had come ashore on the island of Tyree, two days after the supposed date of the accident. In this opinion they were strengthened by the total destruction of the cranes and other objects on the rock, forgetting that the timber of the barrack itself, when once let loose, must of necessity have proved even a more powerful agent of destruction than the driftwood of the wreck. But whatever doubt may exist as to the Cause of the destruction of the barrack. first cause of the injury, there seems good reason to suppose that the dismemberment of the parts of the structure had commenced with the removal of the horizontal braces, and that the beams, having thus more liberty for play and tremor, had gradually shaken loose the fixtures at the top, which consisted of straps c c, passing right over the tops a a, of the beams and b b, the hexagonal quoin of hardwood already noticed at p. 88, which were secured by means of a central bolt d, and finally girt outside by a ring, e e, as shewn in the annexed woodcut (No. 10.) The moment this dismemberment occurred, the beams would be free to work their own destruction; and the enormous leverage which they exerted, when dashed to and fro by the breakers, would soon snap the iron stancheons at the base, and throw all loose to the waves. The only remaining beam was that which was supported against a ledge of rock, and which had received the sea from the opposite direction to that in which it was found lying. That beam, however, although firmly lashed to the rock by the men who first visited it after the accident, along with Mr Charles Barclay, also disappeared in the course of the winter. As a proof how severely these beams had been dashed by the waves, I may state, that the only remaining part of a beam which I saw attached to the iron stancheons, when I landed in the following spring, was so thoroughly riven and shaken as to be quite like a bundle of lathwood.
No. 11.
These circumstances by no means shook my belief in the suitableness of the plan adopted for obtaining a temporary dwelling on the rock; but they induced me, as soon as I received authority from the Commissioners, whose confident expectation of final success was not damped by the unhappy issue of our season’s labours, to examine very carefully the whole details of the ties and fastenings.Preparations for a new barrack. In preparing a similar structure for next season, I resolved to strengthen the ties at the top, where I imagined the former failure to have occurred, by adding six strong stancheons a, a (Plate V.), one to each beam, with heads passing through a centre-plate (H), which united them in one as a cap and to which they were secured by strong screws and keys. The nature of those fixtures will be more easily understood by a reference to the figures (1) and (2) in Plate VI., which shew an elevation and plan of the upper part of the beams. In the elevation only the beams A, B, C, are shewn; but in the plan, all the six beams appear mitering at their heads n, n, to the central beam or tie o, o (see also Plate V.), which was introduced to counteract the tendency of the heavy seas that might burst inside the pyramid, and by exerting a powerful force in the vertical direction, might separate the beams at the top. In the Plate (VI.), a, a, are strong stancheons of iron attached to the outside of the beams by bolts, and also by collars r, r, attached to ears g, g. These stancheons being bent into the vertical direction and rounded at the top, passed through the malleable iron plate H, which was held down, and, as already stated, bound the beams together by nuts c, c, and wedges b, b. Through a hole in the centre of this plate, a large spike p was driven, which produced an expansion of the central beam, and thus wedged up or tightened all the joints formed by the mitering of the seven timbers. On each of those stancheons, snugs were formed at e, capable of receiving and retaining in its place against any tendency to move upwards, a strong metallic ring g, which was tightly keyed by wedges at k. Additional ties of iron D, E, F, were also provided, which connected the six beams together in pairs. Each end of those ties was attached to the timbers by three spikes; one tie, D, is shewn a little fore-shortened; another, E, is seen only on the end; while the third F, is shewn as cut off at the middle. Lastly, an important change was made, by the substitution of malleable iron for wooden braces (see Plate V.) b, b, b, b, in the horizontal direction. Fixtures of this kind held the whole more firmly together; and their construction was such that they might firmly embrace each beam, without requiring any means of attachment beyond wedging tightly up; and thus the entire strength of the timbers was unimpaired by the driving of spikes or bolts. Those braces (No. 11), a, a, had, at each end, double knobs, and were pushed up along the beams, until they squeezed the timbers x, x, x between them; plates p, p (having holes in them through which the double knobs of the braces were made to pass), were then put on and keyed and screwed, as shewn in the figure, so that each beam was quite enclosed by fixtures, which were thus independent of spikes or bolts. Thin hardwood wedges were afterwards driven in, wherever they could be inserted between the iron and the timber; and those wedges were “stitched” to the beams with common nails, merely to prevent their dropping downward, after any temporary contraction of the timber from the state of the atmosphere. In all this, I have anticipated what more properly belongs to the works of the season 1839; but I consider it best, for the sake of clearness, to connect this account of the new with the destruction of the old Barrack.
While the operations already described were in progress at the Rock, Works at Hynish. various works were going forward at the workyard in Tyree. About 16 masons, 12 quarriers, and 4 carpenters, were employed in building the barracks for the workmen and in erecting smiths’ and carpenters’ shops. A large room, paved with a stone floor, for drawing out at full size the courses of the Tower and making the moulds for dressing the stones, was also provided; and a platform of squared masonry was set in the workyard, on which the courses were to be laid, before being shipped for the Rock. During the season, the pier had also been carried out 256 feet, to a point 15 feet within the low-water mark. It was also necessary to provide depositories for the security of tools and other implements, as well as a large coal-shed for the supply of the Steamer which was then in the course of being built. It had, as already noticed, been determined that the stores were to be served out at the cost prices of the Greenock market, to be paid for once a month, at the same time that the wages of the men were paid. That arrangement had been carried into effect on a small scale, from the very beginning of the works; but this season it became necessary, owing to the increased number of men, to conduct it on a more extended and systematic plan; and, for that purpose, a person was required to act as storekeeper and clerk. In order also to preserve the provisions from injury by damp and to secure them from the inroads of the needy Celts and from innumerable rats which overrun that part of Tyree, it was found necessary to set apart, as a storehouse, a large room on the second storey of one of the workshops. The chief articles served out in the store were meal, molasses, sugar, coffee, tea, tobacco and butter. The establishment of the store entailed a great deal of trouble, and led to some expense for carriage and packages, as well as to occasional trifling losses in serving out the allowances or from injury sustained in the transport of the goods; but the inhospitable nature of the country, and the remoteness of Tyree from the ordinary steam-boat traffic, made the adoption of some such plan unavoidable. Amongst other inconveniences which attended the store, not the least may be reckoned the frequent importunities, on the part of the native labourers whom we employed, to be permitted to purchase provisions at the workyard; but that was never acceded to, except in cases where dearths (which are of frequent occurrence in the island) rendered the call irresistible. Had their entreaties easily prevailed, we should soon have had the whole population of Tyree as our regular customers at the Store.