All public Sources
Public document

Men of Invention and Industry

DocumentAdded to Pandi 6 November 2026
Reading progressPage 46 of 59

An advertisement appeared in the papers for a manager to conduct a shipbuilding yard in Belfast. I made inquiries as to the situation, and eventually applied for it. I was appointed, and entered upon my duties there at Christmas, 1854. The yard was a much larger one than that on the Tyne, and was capable of great expansion. It was situated on what was then well known as the Queen's Island; but now, like the Isle of Dogs, it has been attached by reclamation. The yard, about four acres in extent, was held by lease from the Belfast Harbour Commissioners. It was well placed, alongside a fine patent slip, with clear frontage, allowing of the largest ships being freely launched. Indeed, the first ship built there, the Mary Stenhouse, had only just been completed and launched by Messrs. Robert Hickson and Co., then the proprietors of the undertaking. They were also the owners of the Eliza Street Iron Works, Belfast, which were started to work up old iron materials. But as the works were found to be unremunerative, they were shortly afterwards closed.

On my entering the shipbuilding yard I found that the firm had an order for two large sailing ships. One of these was partly in frame; and I at once tackled with it and the men. Mr. Hickson, the acting partner, not being practically acquainted with the business, the whole proceeding connected with the building of the ships devolved upon me. I had been engaged to supersede a manager summarily dismissed. Although he had not given satisfaction to his employers, he was a great favourite with the men. Accordingly, my appearance as manager in his stead was not very agreeable to the employed. On inquiry I found that the rate of wages paid was above the usual value, whilst the quantity as well as quality of the work done were below the standard. I proceeded to rectify these defects, by paying the ordinary rate of wages, and then by raising the quality of the work done. I was met by the usual method—a strike. The men turned out. They were abetted by the former manager; and the leading hands hung about the town unemployed, in the hope of my throwing up the post in disgust.

But, nothing daunted, I went repeatedly over to the Clyde for the purpose of enlisting fresh hands. When I brought them over, however, in batches, there was the greatest difficulty in inducing them to work. They were intimidated, or enticed, or feasted, and sent home again. The late manager had also taken a yard on the other side of the river, and actually commenced to build a ship, employing some of his old comrades; but beyond laying the keel, little more was ever done. A few months after my arrival, my firm had to arrange with its creditors, whilst I, pending the settlement, had myself to guarantee the wages to a few of the leading hands, whom I had only just succeeded in gathering together. In this dilemma, an old friend, a foreman on the Clyde, came over to Belfast to see me. After hearing my story, and considering the difficulties I had to encounter, he advised me at once to "throw up the job!" My reply was, that "having mounted a restive horse, I would ride him into the stable."

Notwithstanding the advice of my friend, I held on. The comparatively few men in the works, as well as those out, no doubt observed my determination. The obstacles were no doubt great; the financial difficulties were extreme; and yet there was a prospect of profit from the work in hand, provided only the men could be induced to settle steadily down to their ordinary employment. I gradually gathered together a number of steady workmen, and appointed suitable foremen. I obtained a considerable accession of strength from Newcastle. On the death of Mr. Toward, his head foreman, Mr. William Hanston, with a number of the leading hands, joined me. From that time forward the works went on apace; and we finished the ships in hand to the perfect satisfaction of the owners.

Orders were obtained for several large sailing ships as well as screw vessels. We lifted and repaired wrecked ships, to the material advantage of Mr. Hickson, then the sole representative of the firm. After three years thus engaged, I resolved to start somewhere as a shipbuilder on my own account. I made inquiries at Garston, Birkenhead, and other places. When Mr. Hickson heard of my intentions, he said he had no wish to carry on the concern after I left, and made a satisfactory proposal for the sale to me of his holding of the Queen's Island Yard. So I agreed to the proposed arrangement. The transfer and the purchase were soon completed, through the kind assistance of my old and esteemed friend Mr. G. G. Schwabe, of Liverpool; whose nephew, Mr. G. W. Wolff, had been with me for a few months as my private assistant.

It was necessary, however, before commencing for myself, that I should assist Mr. Hickson in finishing off the remaining vessels in hand, as well as to look out for orders on my own account. Fortunately, I had not long to wait; for it had so happened that my introduction to the Messrs. Thomson of Glasgow had been made through the instrumentality of my good friend Mr. Schwabe, who induced Mr. James Bibby (of J. Bibby, Sons & Co., Liverpool) to furnish me with the necessary letter. While in Glasgow, I had endeavoured to assist the Messrs. Bibby in the purchase of a steamer; so I was now intrusted by them with the building of three screw steamers the Venetian, Sicilian, and Syrian, each 270 feet long, by 34 feet beam, and 22 feet 9 inches hold; and contracted with Macnab and Co., Greenock, to supply the requisite steam-engines.

This was considered a large order in those days. It required many additions to the machinery, plant, and tools of the yard. I invited Mr. Wolff, then away in the Mediterranean as engineer of a steamer, to return and take charge of the drawing office. Mr. Wolff had served his apprenticeship with Messrs. Joseph Whitworth and Co., of Manchester, and was a most able man, thoroughly competent for the work. Everything went on prosperously; and, in the midst of all my engagements, I found time to woo and win the hand of Miss Rosa Wann, of Vermont, Belfast, to whom I was married on the 26th of January, 1860, and by her great energy, soundness of judgment, and cleverness in organization, I was soon relieved from all sources of care and anxiety, excepting those connected with business.

The steamers were completed in the course of the following year, doubtless to the satisfaction of the owners, for their delivery was immediately followed by an order for two larger vessels. As I required frequently to go from home, and as the works must be carefully attended to during my absence, on the 1st of January, 1862, I took Mr. Wolff in as a partner; and the firm has since continued under the name of Harland and Wolff. I may here add that I have throughout received the most able advice and assistance from my excellent friend and partner, and that we have together been enabled to found an entirely new branch of industry in Belfast.

It is necessary for me here to refer back a little to a screw steamer which was built on the Clyde for Bibby and Co. by Mr. John Read, and engined by J. and G. Thomson while I was with them. That steamer was called the Tiber. She was looked upon as of an extreme length, being 235 feet, in proportion to her beam, which was 29 feet. Serious misgivings were thrown out as to whether she would ever stand a heavy sea. Vessels of such proportions were thought to be crank, and even dangerous. Nevertheless, she seemed to my mind a great success. From that time, I began to think and work out the advantages and disadvantages of such a vessel, from an owner's as well as from a builder's point of view. The result was greatly in favour of the owner, though entailing difficulties in construction as regards the builder. These difficulties, however. I thought might easily be overcome.

In the first steamers ordered of me by the Messrs. Bibby, I thought it more prudent to simply build to the dimensions furnished, although they were even longer than usual. But, prior to the precise dimensions being fixed for the second order, I with confidence proposed my theory of the greater carrying power and accommodation, both for cargo and passengers, that would be gained by constructing the new vessels of increased length, without any increase of beam. I conceived that they would show improved qualities in a sea-way, and that, notwithstanding the increased accommodation, the same speed with the same power would be obtained, by only a slight increase in the first cost. The result was, that I was allowed to settle the dimensions; and the following were then decided on: Length, 310 feet; beam, 34 feet; depth of hold, 24 feet 9 inches; all of which were fully compensated for by making the upper deck entirely of iron. In this way, the hull of the ship was converted into a box girder of immensely increased strength, and was, I believe, the first ocean steamer ever so constructed. The rig too was unique. The four masts were made in one continuous length, with fore-and-aft sails, but no yards,—thereby reducing the number of hands necessary to work them. And the steam winches were so arranged as to be serviceable for all the heavy hauls, as well as for the rapid handling of the cargo.

In the introduction of so many novelties, I was well supported by Mr. F. Leyland, the junior partner of Messrs. Bibby's firm, and by the intelligent and practical experience of Captain Birch, the overlooker, and Captain George Wakeham, the Commodore of the company. Unsuccessful attempts had been made many years before to condense the steam from the engines by passing it into variously formed chambers, tubes, &c., to be there condensed by surfaces kept cold by the circulation of sea-water round them, so as to preserve the pure water and return it to the boilers free of salt. In this way, "salting up" was avoided, and a considerable saving of fuel and expenses in repairs was effected.

Mr. Spencer had patented an improvement on Hall's method of surface condensation, by introducing indiarubber rings at each end of the tubes. This had been tried as an experiment on shore, and we advised that it should be adopted in one of Messrs. Bibby's smallest steamers, the Frankfort. The results were found perfectly satisfactory. Some 20 per cent. of fuel was saved; and, after the patent right had been bought, the method was adopted in all the vessels of the company.

When these new ships were first seen at Liverpool, the "old salts" held up their hands. They were too long! they were too sharp! they would break their backs! They might, indeed, get out of the Mersey, but they would never get back! The ships, however, sailed; and they made rapid and prosperous voyages to and from the Mediterranean. They fulfilled all the promises which had been made. They proved the advantages of our new build of ships; and the owners were perfectly satisfied with their superior strength, speed, and accommodation. The Bibbys were wise men in their day and generation. They did not stop, but went on ordering more ships. After the Grecian and the Italian had made two or three voyages to Alexandria, they sent us an order for three more vessels. By our advice, they were made twenty feet longer than the previous ones, though of no greater beam; in other respects, they were almost identical. This was too much for "Jack." "What!" he exclaimed, "more Bibby's coffins?" Yes, more and more; and in the course of time, most shipowners followed our example.

Continue reading
Page 46 of 59