The Great American Canals (Volume 2, The Erie Canal)
But the work of the year was not confined to the Middle Section. Exploring parties had been sent to outline more specifically the canal line in the sections on either side. A portion of the Western Section, from the Genesee River to Palmyra, was put under contract, to be completed in September, 1821. The portion of the Eastern Section between Utica and Little Falls—a distance of twenty-six miles—was also put under contract. The expenses for the year amounted to over $100,000 ahead of the annual appropriation of $600,000. And heavier expenses yet were in sight; among these the claims of the Western Inland Lock Navigation Company had to be satisfied. This company had been carrying on its business and declaring greater dividends each year up to 1818. In that year the Erie Canal works at Wood Creek interrupted the operation of their system and the state was compelled to satisfy the claim. There had been, ever since 1812, a correspondence between the canal commissioners and the Western Company looking toward a purchase of the latter’s rights. The price asked in 1812, and again in 1817, was $190,000. The matter was at last settled in 1820 by the payment of $152,718.52. [38] There was a moment just here when the canal came near pausing in its swift rush to completion. A recasting of the estimates was essayed, and the New York legislature demanded of the commissioner what portion of the canal was most important in case only a part could be completed. The reply was, of course, that the Western Section should be finished whether the Eastern could be or not. The estimated expense of completing the canal 254 miles from Utica to Lake Erie was $2,845,561; the Eastern Section, only ninety-eight miles long, would cost only $800,000 less, and for this distance the Mohawk River could be made to answer the purpose of a canal if necessary.
But as if pushed forward by the very momentum of its greatness, the canal went forward. The advances made in 1820 were rapid and important. In the Western Section the fifty odd miles between the Genesee and Montezuma were completed with the exception of nine. The route of 1816 was hardly changed except at Irondequoit Creek, and between Palmyra and Lyons. The Middle Section rapidly became a busy avenue. Mile posts were erected throughout its length, the distance from Genesee Street in Utica to the lock into the Seneca River being a little more than ninety-six miles. Navigation began in May. Contracts were let for the Eastern Section that would insure the completion of the thirty miles from Utica to Minden within the year. The course of the canal through the Mohawk Valley was resurveyed, the experienced engineer Canvass White pushing it forward to Cohoes Falls. The great rock wall at Little Falls was now completed. At the close of the year ninety-eight miles of the Erie Canal was completed, and the promise was that as much more would be done within a twelvemonth. The point of difficulty now was in the Western Section in gaining a route well supplied with water between Lake Erie and the Middle Section. During the present year Mr. Thomas had surveyed the northern route, running seventy-two miles from the Tonawanda to the Genesee.
The contracts for this route were let in 1821, eighty miles being let in contracts. The fifty miles between the Genesee and Seneca were completed this year. Business was more brisk on the completed Middle Section than in the year previous, the tolls received amounting to $23,001.63. Contracts were let for the entire completion of the Eastern Section, and boats were already running from Utica to Little Falls. A large fraction of the excavating between Little Falls and Schenectady had been completed by the last of the year, and the difficult problem of a route from Cohoes Falls to Albany was now solved by Canvass White by crossing the Mohawk.
By June, 1823, the canal was open from Rochester to Schenectady, and when the season opened 220 miles were navigable. During 1822 all but ten miles of the route along the Niagara River had been put under contract and the great Genesee aqueduct had been erected. Toll to the extent of $3,286 was collected in this year on the eastern part of the Western Section—at Lyons, Palmyra, and Rochester. By the middle of November water had been ad mitted into the Eastern Section and boats were afloat from Little Falls to Schenectady. Water was admitted into the stretch of canal between Brockport and Rochester, October 10, 1823. The forty-five miles from Brockport to the Mountain Ridge (Lockport) was well along; the four great embankments in this distance were nearly complete; that at Sandy Creek was the highest on the entire canal, running up seventy-six feet. The tolls in 1823 between the Genesee and Seneca amounted to $20,954.11, showing the large amount of business done.
As the last year before completion (1824) opened, all eyes were directed to two points in the west which were each difficult puzzles. One was the means of crossing the Mountain Ridge at Lockport and the other was the best way to get into Lake Erie. Finally the latter question was settled for better or for worse by letting the contracts for the Black Rock harbor. The work went slowly at the Mountain Ridge, but the contractors promised that the work there would be completed by May, 1825. The tolls this year between Mantz and Utica amounted to $77,593.26, and the tolls on the Eastern Section totaled up to $27,444.09. Water was admitted into the canal between Schenectady and Albany in October; the work here, which included twenty-nine locks, had been found unexpectedly difficult. On October 8, 1823, the first boats passed from the West and the North (Lake Champlain canal) through the junction canal into the tide water of the Hudson at Albany. On September 8, 1824, water was sent into the canal from Brockport and Lockport; the line to Black Rock and the Black Rock harbor was completed nearly on scheduled time. Among improvements of the year must be named the hydrostatic locks built at Utica and Syracuse. The tolls of 1824 were $294,546.62. The grand canal was completed.
The completion was a signal for a royal celebration throughout the state of New York which is, in many aspects, of great historic interest. [39] Its unique details, the non-participation of many, the violent rejoicings of others, the carrying out of symbolic ceremonies not unlike Roman pageants, all these and many other features of the great show have a deep significance. The political element entered largely into the matter.
Learning that the canal would be completed about October 26, the corporation of New York City entered into correspondence with the chief cities and towns along the line concerning the proper celebration of the event. Two aldermen, King and Davis, were sent to Buffalo from New York to participate in the festivities of the great occasion.
Buffalo was in gala dress on the day set for the pageant. The city was filled with yeomanry. At nine o’clock in the morning the grand procession formed before the court-house; the Buffalo band, squads of riflemen, and the committees took the lead and the vast throng moved to the head of the Erie Canal where the canal-boat “Seneca Chief” lay at anchor. Governor Clinton, the lieutenant-governor, and the committees were received on board, and Jesse Hawley, who, nearly a generation before, had published in Pittsburg the first broadside in favor of the canal, delivered an address in behalf of the citizens of Rochester, “to mingle and reciprocate their mutual congratulations with the citizens of Buffalo on this grand effort.”
The “Seneca Chief” was bravely equipped and manned for the occasion. Two great paintings occupied conspicuous positions. One presented the scene which was at the moment being enacted, Buffalo Creek and harbor with the canal in the foreground and the “Seneca Chief” moving away. The other picture represented Governor Clinton as Hercules, in Roman costume resting from hard labor. Among the articles of freight to be carried by this boat, which should first pass from Buffalo to New York over the Erie canal, were two kegs filled with Lake Erie water. In addition to the governor of the state and his staff, the Buffalo committee embarked on the “Seneca Chief,” comprising Hon. Judge Wilkinson, Captain Joy, Colonel Potter, Major Burt, Colonel Dox, and Doctor Stagg. The flotilla, which was headed by the “Seneca Chief,” consisted of the canal-boats “Chief,” “Superior,” “Commodore Perry” (a freight boat), and the “Buffalo” (of Erie, Pennsylvania). “Noah’s Ark” was the name of another craft which contained beasts, birds and creeping things—a bear, two eagles, two fawns, several fish, and two Indian boys, all traveling under the title of “products of the West.”
When the flotilla set sail a signal gun was discharged at Buffalo; the announcement was taken up by each gun in a long line from Buffalo to New York and the signal was passed throughout the entire distance.
As the pageant moved along through the state it was joined ever and anon by other craft and at almost every village exercises and illuminations were the order of the day and the much-feted governor and committees were hauled to the best hotel and feasted. The “Niagara” joined the squadron at Black Rock and “fell in behind.” At Lockport guns captured by Perry at the battle of Lake Erie were fired in salute to the guests and the occasion; a gunner who, it was said, had fought under Napoleon, discharged them. At Holley an address was given on the twenty-seventh. At Brockport cannon welcomed the boats. There was a procession at Newport, as everywhere else where the guests were feted. At Rochester a feu de joie was fired from the aqueduct on the arrival of the triumphal flotilla, and here a fine boat, the “Young Lion of the West,” rode out to meet it.
“Who comes there?” cried the “Young Lion’s” sentinel as the strangers drew near.
“Your Brothers from the West, on the waters of the great Lakes.”
“By what means have they been diverted so far from their natural course?”
“By the channel of the Grand Erie Canal.”
“By whose authority, and by whom, was a work of such magnitude accomplished?”
“By the authority and by the enterprise of the patriotic People of the State of New York.”
The procession being formed, the vast throng marched to the Presbyterian church where an address was delivered by Timothy Childs. General Matthews, assisted by Jesse Hawley, presided at a banquet which followed at one of the hotels. Grand illuminations and a ball concluded the day’s entertainment. The Rochester committee consisting of Messrs. E. B. Strong, Ward, Leavett, Rochester, Hulbert, Reynolds, A. Strong, R. Beach, Johnson, and E. S. Beach, embarked on the “Young Lion” for New York.
At Palmyra an arch across the canal welcomed the pageant on the twenty-eighth; it read “Clinton and the Canal” from one side, and “Internal Improvements” on the reverse. Another arch at Montezuma, which was reached late that evening, was a transparency displaying the words “De Witt Clinton and Internal Improvements” on one side, and “Union of the East and West” on the other.
Buckville was found brightly illuminated at midnight; Port Byron was reached on the twenty-ninth and Weedsport was illuminated. A twenty-four pounder was discharged, resulting in the death of only two. Syracuse was reached on the thir tieth; Joshua Forman, the early champion of the canal in 1810, gave an address to which Governor Clinton made reply.