CHAPTER IV

PLANNING, BUILDING, AND OPENING

By an act of the New York legislature of April 17, 1816, [32] the canal commissioners were ordered to send to the legislature “a plain and comprehensive Report of their proceedings;” their duty was to find a route for the projected canal, estimate the expense, ascertain on what terms the state of New York could secure loans, and to apply for donations of both land and money. [33]

The committee met at New York May 17, 1816, and organized. The proposed line of the canal was divided into three sections and an engineer was appointed for each. The Western Section embraced the portion of the route between Lake Erie and the Seneca River; the Middle Section was that between the Seneca River and Rome on the Mohawk; the Eastern Section extended from Rome to Albany on the Hudson. The only point at which there was serious question as to the best route of the canal was between Lake Erie and the Genesee country; and the question was whether to pass south or north of the “mountain ridge” which lay south of the shore of Lake Ontario. Four engineers were sent to make an examination. Two commissioners and engineers were sent to inspect the Middlesex Canal in Massachusetts, “the best artificial navigation in the United States.”

The commissioners met again July 15, after which three of them went to inspect the important portions of a canal route which was now being marked out by the corps of surveyors from Lake Erie to the Mohawk. The size of the canal proposed was forty feet wide on water surface, twenty-eight feet wide at the base and four feet deep—capable of handling boats of one hundred tons. The locks were to be ninety feet long, twelve feet in width in the clear. These would accommodate any lumber that was then being shipped from the regions tapped by the canal. The route of the canal survey was being marked by “bench marks, level pegs, and other fixtures; ... Shafts have been sunk into the earth in various places, to ascertain its nature, with a view to a just estimation of the labour required, and of the expense to be incurred.” The point of junction with Lake Erie, forever a doubtful point until the very last, was now planned at the mouth of Buffalo Creek; the water was higher there, of course, than at any point in the Niagara River, “and every inch gained in elevation will produce a large saving in the expense of excavation throughout the Lake Erie level.”


Click here for larger image size

Map and Profile of the Erie Canal

[From Poussin’s “Travaux d’améliorations intérieures ... des États-Unis d’Amérique de 1824 à 1831” (Paris, 1834)]

The Western Section, from Buffalo to the eastern line of the Holland Purchase, was explored by Engineer William Peacock and Joseph Ellicott, commissioner. Their estimate for the sixty-two miles from Buffalo to the east end of the summit level west of the Genesee River, east of the Great Tonawanda Swamp, was $450,000, and for the total distance to the Genesee River, $780,000. The absence of water on this route made reservoirs necessary, which formed a strong objection to pursuing that course. Anticipating this, Engineer James Geddes was sent over another course from a point twelve miles up the Tonawanda to the Seneca River. The distance was one hundred and thirty-six miles; the rise of one hundred and ninety-four feet from Seneca River to Lake Erie was to be overcome by twenty-five locks; the total expense was put at $1,550,985. The Middle Section extended from Seneca River to Rome, with a decline of forty-eight and one-half feet in seventy-seven miles. It was surveyed and laid out by Benjamin Wright; the estimate included $1,500 per mile for grubbing, so heavy were the forests, and reached a total of $853,186, which was considered liberal. The Eastern Section from Rome to Albany was surveyed in part by Engineer Charles C. Broadhead. The seventy odd miles to Schoharie Creek, with a descent of 132.85 feet, called for sixteen locks and forty-five bridges—a total expenditure of $1,090,603. The forty-two miles to Albany were not now surveyed; the estimate for this distance was $1,106,087. The total descent of the canal from Lake Erie to the Hudson was 564.85 feet and its length was about 363 miles. The average estimated cost per mile was $13,800—by the route north of the Genesee River.

The Erie Canal was born in the Act of April 15, 1817. [34] After being passed by the legislature it went before the Council of Revision. “The ordeal this bill met with in the Council of Revision, came near being fatal to it; it could not have received a two-thirds vote after a veto. The Council was composed of Lieutenant-Governor John Tayler, acting Governor, as President of the Council, Chief Justice Thompson, Chancellor Kent, and Judges Yates and Platt. Acting Governor Tayler was openly opposed to the whole scheme. The Chief Justice was also opposed to this bill. Chancellor Kent was in favor of the canal, but feared it was too early for the State to undertake this gigantic work. Judges Yates and Platt were in favor of the bill; but it was likely to be lost by the casting vote of the acting Governor. Vice President Tompkins (recently the Governor) entered the room at this stage of the proceedings, and, in an informal way, joined in conversation upon the subject before the Council, and in opposition to this bill. He said ‘The late peace with Great Britain was a mere truce, and we will undoubtedly soon have a renewed war with that country; and instead of wasting the credit and resources of the State in this chimerical project, we ought to employ all our revenue and credit in preparing for war.’

“‘Do you think so, sir?’ said Chancellor Kent.

“‘Yes, sir,’ replied the Vice President; ‘England will never forgive us for our victories, and, my word for it, we shall have another war, with her within two years.’

“The Chancellor, then rising from his seat, with great animation declared,

“‘If we must have war ... I am in favor of the canal and I vote for the bill.’

“With that vote the bill became a law.” [35]

Preliminary work was immediately begun in the early spring of 1817 at the strategic summit level at Rome by conducting “a careful re-examination of the line of the canal, and of the levels of the preceding year.” This reconsideration seemed to indicate that a longer summit level at Rome than the one selected should be made, and Utica was chosen as the eastern extremity of this level rather than Rome. This decision was enforced by the fact that Mohawk navigation above Utica was always more uncertain than at any point below it; if the canal for instance should terminate at the Mohawk because of lack of means, or other cause, it would be advantageous to have its terminus on the Mohawk at a point where navigation was as uniformly reliable as possible. The Western Inland Lock Navigation Company had often found it necessary to make a portage from Utica to Rome, such was the low stage of water in the Mohawk. The summit level chosen, therefore, ran from Utica to the salt-works at Salina (Syracuse). This was the eastern summit. The western was yet to be chosen between the Genesee and the Niagara tributaries in western New York.

Five lines of stakes were now driven into the ground from the eastern to the western boundaries of the state of New York—a circumstance which must be considered epoch-making in the history of America. For, look at it as you will, the beginning of the Erie Canal must be considered a greater marvel than the building of it. It would be difficult now to propose an engineering feat that is within the range of sanity that would provoke so much ridicule and debate as did the plan to build the Erie Canal through those hundreds of miles of dense forests and reeking swamps in 1816. A bridge across the Atlantic or a tunnel underneath it could scarcely provoke more sneers today. Yet the summer of 1817 saw the rows of stakes driven into the ground—over hill and vale, through densest forest and sickliest swamp, from east to west; the outer rows were sixty feet apart and indicated the space to be grubbed; between these were two other rows forty feet apart which indicated the exact dimensions of the canal; a single row of stakes in the middle marked the exact center of the canal. Those who laughed at the stakes grew sober when men came on over the route boring with four inch augers into the ground every few rods to a depth of twelve feet; by this means the nature of the soil was tested all along the route and estimates could be made of the cost of the digging; thereupon profiles could be drawn by the engineers. Each of the three great sections of the canal was subdivided into very small sections which were to be let to contractors; each working section was bounded, when possible, by a brook or ravine, in order that each contractor might have the advantage of independent drainage. The plan of the state’s furnishing the tools for the work of digging the canal was soon changed, the contractors being expected to furnish their own tools. An instance of the skill of the old Erie Canal engineers, in a day when “surveying” was as loose a word as the dictionary contained, is interesting: “While Benjamin Wright, Esquire, was re-examining and laying off sections from Rome, west along the canal line, it was deemed expedient, as a test to the accuracy of the work, that James Geddes, Esquire, should start, at a given point on the canal line at Rome, and carry a level along the road to the east end of Oneida Lake, marking on permanent objects the height of the surface of the water while the lake was tranquil, at various places from the east to the west end, along its southern shore; that he should then connect by a level, the Oneida with the Onondaga Lake; after which he was to carry a level from the last mentioned lake, at Salina, south about one and a fourth miles to the canal line, and from thence to work to the east, laying off sections along the canal line. This was accomplished, and nine miles at the west end of the summit level were laid out into sections. And the commissioners have the satisfaction to state, that when the level of Mr. Wright had been carried along the canal line, to the place where Mr. Geddes had terminated his line, the levels of these engineers, which embraced a circuit ... of nearly one hundred miles, differed from each other less than one and an half inches.”

The first contract for work on the Erie Canal was signed June 27, 1817. Work was not begun until a formal inaugural celebration at Rome, New York, July 4, 1817.

A Canal Lock at Rome, New York, Touching the Site of Fort Stanwix

The authorities of Rome arranged with the canal commissioners to unite the celebrations of the opening of the canal with the annual Fourth of July holiday. “At the appointed time and place, Judge Hathaway, President of the village, made a short address, adapted to the occasion, and then delivered the spade into the hands of the Commissioners. After a short but graphic speech by the Commissioner Young, he handed the spade to Judge Richardson, the first contractor, who then thrust it into the ground and made the first excavation for the construction of the canal. The example was immediately followed by his own laborers, and by the assembled citizens, all ambitious of the honor of participating in the labors of that memorable occasion. Thus amid the roar of artillery, and the acclamations of the people, was begun that great work which has spread civilization, wealth and refinement....” [36]