Entrada de Pandipedia
Actualitzat el 25 Nov 20263 fontsExplora Pandipedia

Which lane stays open at M27 junction 3 during the overnight works?

National Highways’ schedule shows lane 1 staying open at M27 junction 3 in both directions. It lists lanes 2 and 3 as closed overnight, 8 p.m. to 6 a.m., for the junction 3 works dated 23–25 November.[1]

Motorway lanes are counted from the left in your direction of travel. Lane 1 is the leftmost running lane. Lanes 2 and 3 are farther to the right. The junction 3 notice therefore describes keeping one running lane open in each direction during the listed work.[2][3]

The times run across midnight. In an overnight entry marked 8 p.m. to 6 a.m., the 6 a.m. end belongs to the following morning. The schedule is for works at junction 3, and the same project page has separate entries with their own dates for nearby slip roads.[4]

The schedule describes planned works. National Highways provides a separate live travel page for current road conditions and any changes on the day.[5][6]

Continua explorant
Mostra-ho tot