When the announcement was made to the country that the work of building the canal was to be put in the hands of the Army, the whole country began to inquire: Who is Major Goethals? that inquiry revealed the fact that he was a man who had accomplished much in his 49 years. Born in 1858, of Dutch parents, whose ancestors had settled in New York when it was still New Amsterdam, he was appointed to the United States Military Academy at West Point where he was graduated in the class of 1880 with such honors that he was entitled to enter the Engineer Corps of the Regular Army.
In 1891 he rose to the rank of captain, and in 1898 became lieutenant colonel and chief engineer of the First Volunteer Army Corps in Cuba. On the last day of that year he was honorably discharged from the volunteer service, and, in 1900, became a major in the Engineer Corps of the Regular Army. For a number of years prior to 1898 he had been instructor in civil and military engineering at West Point. He had been in charge of the Mussel Shoals canal construction on the Tennessee River, a work which won praise from engineers both in civil and in military life. It was in a measure his record made on the Tennessee River work that led to his appointment as chairman and chief engineer of the Isthmian Canal.
When he took charge of the work at Panama he was promoted to lieutenant colonel. Arriving there he immediately informed all hands that while the work of building the canal had been placed under Army engineers, no man who was then on the job and faithfully executing his work need fear anything from that administration. From that time down to the last stages of the work that statement held good. Trained at West Point, brought up in the atmosphere of the Army, a lover of its traditions and in full sympathy with its spirit, he laid aside everything that might handicap the success of the undertaking and sought at once to get the full benefit of all that was best in the Army and in civil life as well. He put his uniform in moth balls when he started to the Isthmus, and from that day to this no man has ever seen him on the Canal Zone wearing an Army uniform.
When he took charge of the big job, the foundations upon which he was to build the superstructure of his success had been laid by his predecessors, but there were many weak points in these foundations as well as many strong ones. With a spirit of utilizing to the fullest extent every advantage that the administrations of the former chief engineers had left on the Isthmus, he undertook to make only such changes as time demonstrated were necessary to the success of the project. At that time 6,000,000 cubic yards of material had been removed from the big waterway. Confronting him was the task of removing some 215,000,000 yards the while building a great dam containing 21,000,000 cubic yards, constructing a series of gigantic locks containing four and a half million cubic yards of concrete, and providing for the happiness and welfare of the sixty-odd thousand people who constituted the canal army and its camp followers.
In the years that followed his appointment he proved himself in every way worthy of his assignment as the managing director of the most stupendous piece of work ever undertaken by man. Furthermore, he established a claim to the title of the "Great Digger." No other man in the history of the world has ever superintended the excavation of an amount of earth half as great as that which has been taken out of the Panama Canal during his administration. Since he went to the canal to "make the dirt fly" the material excavated under his command, together with that placed in the locks and dams, equals the amount necessary to take out to cut a tunnel 13 feet square through the earth at the Equator.
No man ever carried to a great position less fuss and feathers than Colonel Goethals took to his work as chairman and chief engineer of the Panama Canal. When, during the construction period, one visited his office at Culebra, on almost any afternoon, he would find there an unpretentious little room in the corner of the administration building, about 18 feet square, containing four windows, overlooking the cut from two sides, its painted walls hung with maps, its floors uncarpeted, and in the center a large double-sided, flat-top desk covered with papers. A swivel chair at the desk and two or three other chairs constituted the furnishings of this room. The visitor walked directly into the office of his private secretary and the chief clerk, and if he had anything worth while about which to see the chairman and chief engineer he was detained only long enough for the man ahead of him to get out. With "no time like the present" as his motto in handling the business of his office, he, the busiest man on the Isthmus, and one of the busiest in the world for that matter, always seemed to have more time than many men of lesser responsibilities and far fewer burdens. He once declared that he had a contempt for the man who always tried to make it appear that he was too busy to see his callers, because his callers were frequently as busy as he himself.
The fact is that he is a man with a very unusual gift in the dispatch of work. System has been the key-note of his success. With thousands of details every day to look after, he has always kept his work so well in hand that to the casual observer he seemed to be the most leisurely man on the Isthmus. He maintained a well-established routine all through his career on the canal. His mornings usually were spent going over the work. When the morning trains passed Culebra at 7 o'clock they found him up, breakfasted, and at the station.
Although these trains carried parlor cars, one would seldom see the chairman and chief engineer riding in them. Rather, he consistently chose to ride in the ordinary day coaches with his sub-engineers, with the steam-shovel men, and with the rank and file of the Americans who made possible the success of the work at Panama. There were few of these Americans whom he did not know by name, and with whom he did not pass a pleasant word whenever he chanced to meet them.
A morning trip over the work with this presiding genius of the big ditch reveals perhaps better than anything else the makeup of the man and the secret of his success.
"Meet me on the early train to-morrow morning at Miraflores," said he to one of his visitors in the early summer of 1913, "and we will go over the Pacific end of the work."
This meant that both the chief engineer and the visitor had to leave comfortable beds at 5 o'clock in the morning to keep the appointment. At 7 o'clock they met at Miraflores. "We will walk through the tunnel if you don't mind," said he, "as I don't want to hold up a dirt train if it can be avoided."
At the other end of the railroad tunnel, the only one on the Isthmus, a railway motor car stood on the siding ready to pick up the distinguished engineer and carry him to the Miraflores Locks. This motor car is something like a limousine on railroad trucks, and was affectionately known by the people on the Isthmus, as "the yellow peril" and "the brain wagon." The first stop was at the concrete work on the spillway dam at Miraflores.
"How soon do you expect to have this dam up to its full height?" he asked of the division engineer who joined him there. "Can't you find room to operate another temporary concrete mixer down there?" he queried further. "Is there anything else you need to keep the work moving forward so as to be certain to complete the dam by the time you promised?"
Going a little farther he came to a place where one division was doing some work for another division. "Don't you think it would be more satisfactory to keep both parts of that work under one division? Why don't you allow it all to be done by the other people?"
Walking across the locks on the temporary bridge the chief engineer and his assistant came to a point where the concrete lamp posts for lighting the locks were being set up. "Don't you think that it would better avoid any settling if you were to place beams of railroad iron across those spaces and rest the posts on them?" he queried.
A little farther on he met the engineer in charge of the work of the company erecting the gates. "When do you think you will have the gates in the west chambers completed so that we can put the dredge through?" he inquired of Mr. Wright.
"Well, sir," replied Mr. Wright, "if we have good luck I hope to have them done by the first of September; if we have fair luck we ought to have them completed by the middle of September; but at the lowest calculation I can promise them to you by the first of October."
"But have you taken into consideration all of the time you are likely to lose as the result of heavy rains?" queried the chief engineer.
"I have made full allowance therefor, I think," responded Mr. Wright.
Walking on, the watchful eye of the chief engineer fell upon a new baby railway track which was being laid through the eastern lock chambers. "What are you planning to do there?" he asked of the division engineer.
"We wanted to get some additional material through the locks and Mr. Wright informed us that if we would furnish the timbers, he would make it so that we could run these little engines through there," responded the engineer.
"But did you have a definite understanding with him that this should afford no excuse for any further delay in completing the gates?" queried Colonel Goethals.
"We did, sir," responded the division engineer.
"All right then, go ahead."
At this point the party boarded the motor car again and was taken to the big dike which was to hold the Pacific Ocean from flooding the locks after a dike a mile farther down had been blown out. "How much water do you have in the stretch between the two dikes?" he asked of the division engineer. He next wanted to know how many million cubic feet they were able to pump and siphon in, and how much the Rio Grande was bringing in per day. Then he wanted to know if every possible precaution had been taken to insure the watertightness of the new dike; how many thousand pounds of dynamite had been placed under the one to be blown up; how many holes this dynamite was placed in; and a large number of other bits of information which would tell him whether every safeguard had been thrown around the plan to insure its success.
Going up on the other side of the canal the party came to the earth dam joining the west lock walls with the hills, so as to impound 58 feet of water in Miraflores Lake. "How soon do you expect to get that connection made between the lock walls and the dam proper?" he queried of the engineer in immediate charge.
"In four weeks, sir."
"All right," answered Colonel Goethals, "you can't get that done any too soon to suit me."