The Crisis of the Naval War
The delays, as will be seen from the tables given, were most serious in the case of vessels classed as auxiliaries. Sir Thomas Bell, who possessed great experience of shipbuilding in a private capacity, was at the head of the Department of the Deputy Controller for Dockyards and Shipbuilding, and the Director of Warship Production was a distinguished Naval constructor. The Deputy Controller of Auxiliary Shipbuilding was an officer lent from the War Office, whose previous experience had lain, I believe, largely in the railway world; some of his assistants and staff were, however, men with experience of shipbuilding.
When I became First Sea Lord at the end of 1916 the new building programme, which had received the sanction of the Cabinet, was as follows:
8 Flotilla leaders. 500 Trawlers.
65 T.B.D.'s. 60 Submarines.
34 Sloops. 4 Seaplane carriers.
48 Screw minesweepers. 60 Boom defence vessels.
16 Paddle "
During the early part of 1917 it was decided to substitute 56 screw minesweepers and 8 paddle sweepers for the approved programme of this class of vessel and to add another 50 screw minesweepers to meet the growing mine menace, as well as to substitute 115 drifters for 50 of the trawlers, and to request the Canadian Government to build 36 trawlers and 100 drifters mainly for use in Canadian waters. It was also decided to lay down 36 mercantile decoy ships and 12 tugs, and to build 56 motor skimmers on the lines of the coastal motor boats, which were then showing their value off the Belgian coast. The programme therefore, in May, 1917, was as follows:
Flotilla leaders 8
T.B.D.'s 65
Patrol boats 6
Sloops 34
Minesweepers (screw) 56
" (paddle) 8
Additional twin-screw minesweepers 50
Submarines 60
Trawlers 450
Drifters 115
Canadian trawlers 36
" drifters 100
Boom defence vessels 60
Mercantile decoy ships 36
Seaplane carriers 4
Tugs 12
Motor skimmers 56
Meanwhile intelligence had been received which indicated that Germany was building such a considerable number of light cruisers as to jeopardize our supremacy in this class of vessel, and it was decided by the Board that we ought to build eight more light cruisers even at the cost of appropriating the steel intended for the construction of six merchant ships.
Further, the German submarine programme was developing with great rapidity, and our own submarines of the "L" class were taking a very long time to build. It was therefore proposed to substitute eighteen additional "H" class submarines for four of the "L" class, as the vessels of the "H" class were capable of more rapid construction, thus making the total number of submarines on order 74. Approval was also sought for the addition of 24 destroyers and four "P" boats to the programme, bringing the number of destroyers on order up to a total of 89.
The programme was approved, a slight change being made in the matter of the seaplane carriers by fitting out one of the "Raleigh" class of cruisers as a seaplane vessel in order to obtain an increased number of vessels of this type more rapidly than by building. Later in the year the cruiser Furious was also converted into a seaplane carrier, and she carried out much useful work in 1918.
MERCANTILE SHIPBUILDING
A greatly increased output of merchant ships had been anticipated under the new organization, which placed mercantile construction under the Admiralty Controller instead of under the Ministry of Shipping. It was expected that the difficulties due, under the previous arrangement, to competing claims for steel and labour would vanish with very beneficial results.
It was, as previously stated, mainly with this object that the Admiralty had agreed to the change. The start was promising enough. After a review of the situation hopes were held out that during the second half of 1917 an addition of about 1,000,000 tons of shipping from the shipyards within the United Kingdom would be effected. This figure, indeed, was given to the House of Commons by the Prime Minister on August 16, 1917.
On comparing this figure with that of the first half of the year (a total of about 484,000 tons) there was distinct cause for gratification; it is right to state that Admiralty officials who had previously been watching mercantile shipbuilding regarded the estimate as very optimistic. Further, it was anticipated by the then Admiralty Controller, Sir Eric Geddes, that during the year 1918, with some addition to the labour strength, a total output of nearly two million tons was possible, provided steel was forthcoming, whilst with considerably greater additions to the labour strength and to the supply of steel, and with the help of the National Shipyards proposed by the Controller, the total output might even reach three million tons.
The actual results fell very short of these forecasts, the total output for the second half of the year was only 620,000 tons, the monthly totals in gross tonnage for the whole year being:
January 46,929 July 81,188
February 78,436 August 100,900
March 115,654 September 60,685
April 67,536 October 145,844
May 68,083 November 158,826
June 108,397 December 112,486
In January, 1918, the total dropped to 58,568 tons, and in February was only 100,038 tons. In March it was announced that Lord Pirie would take the position of Controller General of Merchant Shipbuilding. The subsequent results in the direction of output of merchant ships do not properly come within the scope of this book, which is intended to deal only with work during the year 1917, but it may be of interest to give here the output month by month. It was as follows:
January 58,568 July 141,948
February 100,038 August 124,675
March 161,674 September 144,772
April 111,533 October 136,000
May 197,274 November 105,093
June 134,159 December 118,276
Total for the year 1,534,110
It will be seen that the results for 1918 were an improvement on those for 1917, the exact figure for that year being 1,163,474 tons; these results, however, fell very short of the optimistic estimates given in July, 1917.
MERCANTILE REPAIR WORK
The Controller's Department undoubtedly succeeded in the work of improving the arrangements for the repair of merchant ships. This is shown by an analysis of the total number of vessels that completed repairs during various months.
In August, 1917, the number was 382, with a tonnage of 1,183,000. In November the figure became 542 ships, with a tonnage of 1,509,000. There remained under repair at the end of August 326 ships, and at the end of November 350 ships, these figures indicating that the greater number of completions was not due to the smaller number of vessels being damaged or the damages being less in extent.
Considerable credit is due to the Department for this successful acceleration of repair work which naturally had a great influence on the shipping situation.
ARMAMENT PRODUCTION
It was not, I think, realized either by the Government or by the civilians brought into the Admiralty during the year 1917 that there was a very great difference between the Admiralty and the War Office organizations in the matter of production of material, nor was it recognized that naval officers are by their training and experience better fitted to deal with such matters on a large scale than are military officers, except perhaps officers in the Artillery and Royal Engineers. Whatever may be the case in the future, the Navy in pre-war days was so much more dependent on material than the Army as to make questions relating to naval material of far greater importance that was the case with military material. This fact is apt to be forgotten by those writers on naval affairs who think that an intimate knowledge of questions relating to naval material and its use is of little importance. I trust that this belief will never become general in the service, for the naval officer who is not familiar with the design and production of material is handicapped when he comes to use it.
Ignorance of the great experience of the Admiralty in handling problems of production and of the past success of Admiralty methods in this respect gave rise to a good deal of misconception. The fact that it had been necessary to form a separate Ministry (that of Munitions) to deal with the production of war material for the Army probably fostered the idea that matters at the Admiralty should be altered in a similar direction.
The post of Deputy Controller of Armament Production was created under the new organization, and all matters concerning the production of guns, gun-mountings, projectiles, cordite, torpedoes, mines, paravanes and all other war material was placed under him. I have dealt earlier in this chapter with the questions of design and inspection over which some disagreement arose.
I was not conscious that the new organization succeeded in speeding up armament production during 1917, and during the latter part of the year I was much concerned with the delays in ordnance production as revealed during 1917 and as exposed by the forecasts for 1918.
It is very possible, on the other hand, that in the case of mines the results were good. The old Admiralty organization had not been equipped to deal with such an immense number of mines as were on order, and although a large organization for their production was started by Sir Lionel Halsey, when Fourth Sea Lord, with the assistance of Admiral Fitzherbert and Captain Litchfield-Speer, it had not been sufficiently long at work for an opinion to be given as to whether the results in production would have been as good as under the D.C.A.P.
In considering the whole question of production during the year 1917 it should be borne in mind that very extensive orders were placed in the early part of that year for guns, gun-mountings, mines, warships of the smaller class and patrol craft, and that if we compare only the actual output for 1917 with that of previous years without taking the above fact into account, we might form an incorrect impression as to the success of the organization for production. For instance, in the last quarter of 1917, 1,515 guns of all calibres were delivered, as against 1,101 in the first quarter; in the month of November 1,335 mines of all natures and 2,078 depth charges were filled, as compared with 625 mines and 542 depth charges in July. These figures were the result of the large orders placed early in the year, and it was not until 1918 that the full fruits of the orders placed in 1917 became apparent. The figures for that year, however, are not at my disposal.
One great advantage which resulted from the new organization, viz., the creation of a Directorate of Materials and Priority, must be mentioned. This Directorate controlled the distribution of all steel for all services and produced a very beneficial effect on the issue of supplies of steel to shipbuilders. The immense increase in staff which resulted from the institution of the office of Admiralty Controller is exhibited in the lists of staff in 1918 as compared with the staff in the early part of 1917.
CHAPTER XI
NAVAL WORK
The main effort of the Navy during the year 1917 was directed towards the defeat of the enemy's submarines, since the Central Powers confined their naval effort almost entirely to this form of warfare, but many other problems occupied our attention at the Admiralty, and some of these may be mentioned.
Considerable discussion took place in the early part of the year on the subject of the policy to be pursued in the Eastern theatre of war, and naval opinion on the possibility of effecting a landing in force at different points was invited and given. It need only be said here that the matter was brought forward more than once, and that the situation from the naval point of view was always clear. The feasible landing places so far as we were concerned were unsuited to the military strategy at that period; the time required to collect or build the great number of lighters, horse boats, etc., for the strong force required was not available, and it was a sheer impossibility to provide in a short period all the small craft needed for an operation of magnitude, whilst the provision of the necessary anti-submarine defences would have taxed our resources to the utmost and have prevented essential work of this nature in other theatres.