Engineers have brought railways to their present stage of perfection, and the public will expect them to devise and carry out still further improvements as the march of development moves onward. It is a simple matter to arrange the traffic on a railway when all the works and appliances are appropriate for the service to be performed; but the advances which are made follow one another so rapidly as to necessitate constant study and organization to effect the structural alterations and additions requisite to maintain an up-to-date standard of efficiency. The traffic manager on a railway receives his instructions from the directors or controllers of the company as to the working out of the train service, rates, charges, and other items of his department, but the engineer has to stand alone, and his technical knowledge and professional skill must enable him not only to design and construct works suitable in character, extent, and strength to the duty for which they are intended, but also to decide when structures are no longer capable of properly sustaining the increasing loads brought upon them, and must be taken down and replaced with others of a stronger description. For this reason the engineer must carefully consider every circumstance and local feature which may influence the design to be prepared; he must thoroughly investigate the nature of the ground for foundations, as the description when ascertained will frequently determine the class of work to be erected, whether in viaducts, bridges, or buildings; and in his selection of materials and calculations for strength, he must allow ample margin to meet further increased weights, as well as for natural deterioration.
He should, indeed, go a little further, and as his perceptive ability and training will always enable him the more readily to foreshadow the direction in which improvements or changes are tending, he should study out and be prepared with his schemes to meet the new departures as the requirements gradually arise.
Strength and efficiency are the leading points which must be always kept in view, and the engineer must never forget that he is solely responsible for the safety of the line and works, and of the public passing over the same.
INDEX
-
A
-
Accommodation works, 12
-
Air-lock, 119
-
Air-pump, 120
-
Allowances for sinkage on embankments, 70
-
Alteration of gradients, 12
-
American hand-brake, 46
-
Analysis of steel rails, 193
-
Approach roads to stations, 249
-
Arch culverts, 76
-
Automatical gate-alarm, 336
-
B
-
Ballast, 225
-
Bascule bridge, 85
-
Battering-rule, 72
-
Bearing-weights of various materials, 129
-
Beater, 239
-
Bench marks, 66
-
Bissell truck, 58
-
Block crossing, cast steel, 235
-
Board of Trade requirements, 18
-
Bog-cutting, 65
-
Bogie carriage, 54
-
Book of reference, 8
-
Borings for foundations, 129
- for tunnel work, 164
-
Borrowed earthwork, 61
-
Bottom-pitching, 225
-
Brake-power on gradients, 45
-
Brakes for goods waggons, 46
-
Brick-well foundations, 123
-
Bridges, 79
- over public roads, 10
-
Broken stone ballast, 225
-
Buffer-stops, 282
-
Bull-head rail, 191
-
C
-
Cab-rank, 251
-
Caisson foundations, 121
-
Cant of rail, 230
-
Carriage accommodation, 353
-
Cast-iron column piers, 97
-
Catch-siding, 26
-
Centre line of railway, 32
-
Chairs, 206
-
Channelling ballast, 231
-
Cinder ballast, 227
-
Circular running-shed, 289
-
Clay puddle, 127
-
Clocks at stations, 26
-
Coal-drops, 282
-
Coffer-dams, 127
-
Comparison of bull-head and flange rails, 199
-
Compound rails, 190
-
Concrete foundations, 114
-
Continuous brakes, 30
-
Covered-way tunnels, 178
-
Crab bolts, 223
-
Creosoted sleepers, 211
-
Cross-over road, 233
-
Crossings made of rails, 237
-
Cross-sections, 33
-
Culverts and drains, 74
-
Curve alterations, 12
-
Curves, 49
-
Cutting rails on curves, 229
-
Cylinder foundations, 116
-
D
-
Datum line, 8
-
Deck or floor of girder bridges, 133
-
Depths of cuttings, 10
-
Derrick crane, 299
-
Detached lock, 332
-
Detonator or fog signals, 334
-
Detours on mountain-sides, 3
-
Deviation, limits of, 6
-
Diagram sketches of bridges, 149
-
Diamond crossing, 237
-
Disc or ground signals, 322
- wheels, 48
-
Diversion of roads, etc., 6
-
Dobbin-cart, 67
-
Dock platforms, 251
-
Double-line junction, 231
- slip points, 233
-
Dry stone backing, 162
-
E
-
Earthworks, 60
-
Edge rails, 185
-
Electric motive-power, 355
-
Embankment on bog, 71
-
- triangle, 290
-
Enlargements on parliamentary plans, 16
-
Entrances to tunnels, 176
-
Estimate, 14
-
Expansion of rails, 228
-
Extract from Government Standing Orders and Regulations, 6
-
F
-
Facing-bolt lock, 315
-
Fang clips, 224
-
Fastenings, 218
-
Flag signals, 313
-
Flag-top culverts, 76
-
Flange rail, 191
-
Floor or deck of girder bridges, 133
-
Floors for goods-sheds, 280
-
Flying junction, 231
-
Fog or detonator signals, 334
-
Footings of foundations, 111
-
Foundations, 111
-
Four-line system, 351
-
G
-
Gantry crane, 294
-
Gate-alarm, 336
-
Gates for level crossings, 74
-
Girder bridges, 110
-
Glazed roofs over platforms, 272
-
Goliath crane, 297
-
Goods-sheds, 273
-
Government grants to railways, 349
-
Gradient alterations, 12
-
Gradients, 42
-
Gravel ballast, 225
- foundations, 113
-
Guard-rails, 51
-
Guide-piles, 127
-
H
-
Half-round sleepers, 211
-
Hand-brakes on trucks, 46
-
Headings in tunnels, 169
-
Headway and span of public-road bridges, 10
-
Height of platforms, 24
-
Heights of embankments, 10
-
High-speed running, 354
-
Houses of labouring classes, 10
-
I
-
Inclination of ramps, 26
-
Inside keys for chairs, 207
-
Inspection of new line, 18
- of tunnel work, 176
-
Iron-tube tunnels, 179
-
Island-platform station, 258
-
J
-
Jack-arches of brickwork, 145
- of concrete, 139
-
Jib crane, 296
-
Jim Crow, 239
-
- with existing line, 6
-
K
-
Keys for chairs, 207
-
Kinsua Viaduct, 97
-
L
-
Lavatories and conveniences, 260
-
Laying permanent way, 225
-
Level crossings, 10
-
Life of steel rails, 193
-
Lift-bridge, 87
-
Light railways standard gauge, 41
-
Loa Viaduct, 102
-
Loads of locomotive engines, 44
-
Location of railway, 1
-
Longitudinal sleepers, 210
-
Low viaduct arching, 129
-
M
-
Made ground, 111
-
Marking steel rails, 195
-
Mechanical drills, 172
- gates, 335
-
Mile-posts, 30
-
N
-
Names of stations, 24
-
Narrow-gauge railways, 40
-
Natural features of country, 1
- ground, 111
-
Navigable rivers, 81
-
O
-
Occupation bridges, 110
-
Ordinary crossing, 235
-
Ordnance maps, 3
-
Outside guard-rails, 53
- keys for chairs, 207
-
Over-line arch bridges, 103
-
P
-
Parapets on viaducts, 28
-
Parliamentary estimate, 14
-
Pedestal water-tanks, 302
-
Piers of cast iron, 97
-
Pile foundations, 114
-
Plate-iron troughing, 143
-
Platform roofs, 264
-
Platforms (requirements of), 24
-
Plenum system of sinking, 119
-
Pneumatic process of sinking, 129
-
Points, or switches, 235
-
Portage viaduct, 102
-
Power to purchase land, 6
-
Preservation of timber, 211
-
Private-road bridges, 110
-
Provincial grants to railways, 349
-
- level crossing, 8